RECOVERY - Design-Build Los Padres National Forest Ranger Stations

Active
AG-9702-C-10-0285Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract pertains to a design-build project for Los Padres National Forest Ranger Stations, under solicitation number AG-9702-C-10-0285, managed by the USDA Forest Service. Several pre-priced option items have been exercised, including pavement, striping, and drainage work at Chuchupate; construction of a 20,000-gallon water storage tank; installation of an emergency generator; and renovations to both the exterior and interior of a warehouse in Monterey. Additionally, site lighting installation has been included for both the Chuchupate and Monterey locations. All work adheres to specified contract sections and is being carried out as part of the original contract scope. A firm-fixed-price modification totaling $1,019,011 was awarded to Plant Construction Co, LP to cover these additional tasks. This contract action is noted as a Recovery Act project, with the notice provided solely for informational purposes pursuant to applicable federal acquisition regulations. The place of performance is Goleta, California, and the primary point of contact is Charles Wallach from the USDA Forest Service.

General Info

Design-build project for Los Padres Forest: water tank, generator, lighting, renovations; $1,019,011 fixed price.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Los Padres National Forest 6755 Hollister Ave Suite 150, GOLETA, CA, 93117, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

special-notice

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → USDA Forest Service-Spoc Software
Contacts1 person available
OfficeWashington, DC, 20250, USA
Office AddressWashington, DC, 20250, USA

Full Description

Show more
RECOVERY - THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY. This notice is provided in accordance with FAR 5.705(a)(1), as prescribed for Recovery Act actions. Contract AG-9702-C-10-0285 has been modified to exercise the pre-priced option items as follows: OPTION 4 - EXERCISED: Design-Build New Pavement, Striping and Drainage at Chuchupate, IAW Sections C & J. OPTION 5 - EXERCISED: Design-Build 20,000 gallon Water Storage Tank at Chuchupate, IAW Sections C & J. OPTION 6 - EXERCISED: Design-Build Emergency Generator at Chuchupate, IAW Sections C & J. OPTION 7 - EXERCISED: Design-Build Renovation Exterior Warehouse at Monterey, IAW Sections C & J. OPTION 8 - EXERCISED: Design-Build Renovation Interior Warehouse at Monterey, IAW Sections C & J. OPTION 10 - EXERCISED: Design-Build Site Lighting at Chuchupate & Monterey, IAW Sections C & J. One firm-fixed-price modification has been issued to Plant Construction Co, LP in the amount of $1,019,011.00 for this additional work within scope of the original contract. RECOVERY - THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
JBLM Construct CHP Building
Solicitation # W912K3-26-R-A0001
Solicitation W912K3-26-R-A0001 is a Small Business Set-Aside for the design-bid-build construction of a 20,000 square foot Pre-Engineered Steel Controlled Humidity Preservation (CHP) Building at Joint Base Lewis-McChord, Washington. The project, estimated between $1 million and $5 million, involves site preparation, the erection of the steel building, installation of a concrete slab, and the implementation of underground utilities and stormwater mitigation via an infiltration pond. Specialized requirements include the purchase and testing of dehumidifying equipment, a dry pipe fire suppression system compliant with NFPA 13 and UFC 3-600-01, and the installation of conduit to support a future photovoltaic solar system. The government will award a Firm Fixed Price task order based on a balanced evaluation of technical capability and price. Technical submissions must include a task-oriented project schedule with a total completion date not exceeding 360 days from the Notice to Proceed, as well as qualifications for key personnel. The project is subject to Davis-Bacon prevailing wage rates for Pierce County and requires both performance and payment bonds for awards exceeding $150,000. All construction must adhere to JBLM Department of Public Works engineering requirements, with specific quality standards including ISO 9001 and NETA ATS. Offers are due by October 18, 2026.
Bristol Alliance of Companies

POSTED

about 4 hours ago

DEADLINE

in 2 days
View Details
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific focus on the Riverside and Los Angeles project areas, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 15, 2026, with a response deadline of November 4, 2026. To ensure project financing and avoid being deemed non-responsive, bidders must strictly adhere to six Good Faith Effort (GFE) requirements. Mandatory documentation that must be submitted with the bid package includes proof of public notification, specifically online postings for 30 consecutive calendar days and a print newspaper posting for at least one day, as well as evidence of utilizing the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Documentation regarding outreach efforts, such as call logs and emails, may be submitted up to three business days after the bid closing date. Prime contractors are further required to flow these GFE requirements down to any subcontractors they may award.
RT CONTRACTOR CORP

POSTED

about 4 hours ago

DEADLINE

in 19 days
View Details
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located on the northeast end of Walnut Avenue in Greenfield, California. Managed by C. Overaa & Co., the project has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and utility relocation; construction of the plant featuring a packaged Membrane Bioreactor (MBR) system, headworks, UV disinfection, and SCADA; decommissioning and demolition of existing facilities; and finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining existing wastewater treatment services and compliance with General Order/NOA requirements throughout the first two phases of construction. This solicitation is open to various small and disadvantaged business enterprises, including DBE, DVBE, SDVOSB, SBE, MBE, VOSB, and WBE. A significant local hiring goal is in place, requiring that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must agree to the Overaa standard agreement without modification and comply with specific insurance requirements, including a waiver of subrogation for workers compensation. Administrative details include the use of the Textura electronic invoicing system, with subcontractors responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026.
C. Overaa & Co.

POSTED

about 4 hours ago

DEADLINE

in 25 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS