Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on June 2, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Recovery-Design Review

Awarded
AG-7482-D-10-0016Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
International
Pump Optimisation and Aeration Efficiency Analysis
Solicitation # FA2253
Thames Water Utilities Limited is establishing a single-lot, sole-supplier framework agreement under solicitation FA2253 for pump optimisation and aeration efficiency services. The contract focuses on the monitoring, testing, and analysis of pumping and aeration systems across approximately 60 operational sites, encompassing roughly 200 tests during the AMP period. The primary objective is to reduce whole-life costs and improve operational performance through a structured delivery model that includes site identification, efficiency studies, and performance monitoring. The agreement will feature fixed pricing structures based on an agreed rate card and will be managed through key performance indicators to ensure strategic partnership and continuous improvement. The contract is scheduled for an initial three-year term starting May 10, 2027, with potential extensions up to a maximum of eight years, ending May 9, 2035. Eligible suppliers must demonstrate a proven track record of delivering measurable savings and innovation and must have the capacity to operate within London, the Thames Valley, and the Home Counties. Award selection is based on a 50% technical and 50% commercial weighting. The procurement process is a multi-stage procedure requiring a Pre-Selection Questionnaire via SAP Ariba by October 19, 2026, followed by an Invitation to Negotiate stage. Successful providers must also meet stringent insurance requirements, including 15 million pounds for public and products liability and 10 million pounds for professional indemnity.
Thames Water Utilities Limited

POSTED

about 2 hours ago

DEADLINE

N/A

AI Contract Overview

Show more

This award notice specifies a task order issued to HDR Engineering under contract AG-3A75-C-09-0019 for an independent design review of an ARRA Rehabilitation project at Marbury Site 22 in Georgia. The contractor is responsible for providing all necessary personnel, equipment, labor, and facilities to conduct a peer review of the dam design in accordance with USDA Natural Resources Conservation Service National Engineering Manual standards. The primary objective is to ensure that design and construction decisions prioritize safety, economy, and the mitigation of potential hazards to life and property. The scope of work requires the contractor to verify that the design addresses all safety deficiencies, meets stated objectives, and aligns with industry practices and applicable state and federal policies. Specifically, the review must confirm that analysis methods are appropriate and that the design complies with Georgia Department of Natural Resources Safe Dams Program hydrologic criteria. This project falls under NAICS code 541330 and is managed through the USDA.

General Info

Agency

N/A

Contract Value

$28,037.05

NAICS

541330 - Engineering Services

Place of Performance

HDR Inc 8404 Indiana Hills Dr, OMAHA, NE, 68114, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

special-notice

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Elisa SanchezContract Specialist

Full Description

Show more
RECOVERY - TAS::12 1142:: TAS This notice is provided for information purposes only. This opportunity is only available to the contractor under Contract AG-3A75-C-09-0019 A task order will be issued to HDR Engineering for independent design review of an ARRA Rehabilitation project in the state of Georgia located at Marbury Site 22. The Contractor shall furnish the personnel, equipment, labor, materials, transportation, and facilities required to perform the services described herein: I. Purpose The Contractor shall perform an independent review as required by the policy of the USDA'Natural Resources Conservation Service as stated in the National Engineering Manual (NEM) Part 501.05(a), Part 520.26 and Part 511.05(b). The NEM defines independent review as an examination and evaluation of procedures used and decisions made during the design of a dam by peers from outside NRCS or from an organizational unit other than the one responsible for the design. The NEM requires an independent review of designs for engineering job class VII and other projects, as determined, based on their complexity and potential hazard The Contractor's capability must be equal to that needed to independently perform the design. Independent reviews are made to verify that design and construction procedures and decisions reflect safety considerations as well as economy. Dam safety considerations are directly related to the potential for loss of life, damage to valuable property, or disruption of transportation and utility facilities if the dam fails. The classification of dams is determined by the potential for such losses and damage (see NEM 520.2l). The Contractor shall determine whether the methods of analyses are appropriate and the assumptions are justified by the site conditions, as well as whether the results are reasonable. The Contractor shall verify that the design: - Addresses all potential dam safety deficiencies - Safely and effectively meets the stated objectives - Addresses unique site conditions - Is consistent with industry practice for similar structures - Generally complies with, or has appropriate variances to, the more stringent of NRCS or applicable state policy and criteria. (Note: A waiver of NRCS hydrologic design criteria has been granted to allow modification of this dam to Georgia Department of Natural Resources, Environmental Protection Division, Safe Dams Program hydrologic criteria.)

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS