Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of The Interior was posted on July 28, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RECOVERY--F--ACT - LOWER HORSEFLY SLASHING

Closed
L09PS01014Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 115310
New
International
BR28TFD003 Manual Brushing 2 - Kootenay Lake
Solicitation # BR28TFD003
Solicitation BR28TFD003, titled Manual Brushing 2 - Kootenay Lake, is a request from the BC Timber Sales Branch of the Province of British Columbia for the provision of all labor, services, materials, and equipment required to perform manual brushing operations within the Kootenay Business Area. The contract is awarded as a lump sum to the lowest compliant bidder based on the Total Bid Price. In the event of a tie, the winner is determined via a draw using Random.org. Bidders must be certified in the BC Forest Safety Council SAFE Company program and may be required to demonstrate technical experience, qualifications, and possession of necessary machinery. A mandatory bid security of at least 5,000 dollars for tenders under 250,000 dollars, or 10,000 dollars for tenders 250,000 dollars or more, must accompany the submission. Successful bidders must provide a valid Tax Verification Letter from the BC Ministry of Finance for contracts valued at 100,000 dollars or more. Performance requirements include strict adherence to the BCTS Environmental Management System, the Wildfire Act, and the Wildfire Regulation. Contractors are responsible for maintaining documentation of pre-work meetings and inspections, as well as preparing an environmental emergency response plan using the BCTS template. The response deadline for this solicitation is November 25, 2026.
BC Timber Sales Branch

POSTED

1 day ago

DEADLINE

in 24 days
NAICS: 115310
New
International
PL28TJE001-A - Spring Tree Planting in the Fort St. James Area
Solicitation # PL28TJE001-A
Solicitation PL28TJE001-A is an invitation for tenders to perform spring tree planting in the Fort St. James area of British Columbia for the BC Timber Sales Branch. The contractor is responsible for providing all labor, tools, equipment, and materials, including the transportation of seedlings from designated cold storage facilities. A critical performance milestone requires planting to begin on unit A93715-2 by May 25, 2027. Bidders must demonstrate a production capacity of 40,000 seedlings per day and maintain certification in the BC Forest Safety Council SAFE Company program. Additionally, the contractor must provide at least one member of the Association of BC Forest Professionals to supervise quality and sign payment certificates. The contract is awarded to the lowest priced compliant tender, with a mandatory bid security of 5,000 to 10,000 dollars depending on the total bid value. Payment is tied to planting quality as measured by the Ministry of Forests Planting Quality Inspection System, with full payment requiring a quality rating of at least 92.6 percent and no payment issued for quality below 70 percent. Strict guidelines are mandated for seedling storage and transport, requiring temperatures between 10 and 40 degrees Celsius and the use of reflective tarps for field caching. Contractors must also ensure the proper disposal of seedling wrappers and containers to avoid financial penalties.
BC Timber Sales Branch

POSTED

1 day ago

DEADLINE

in about 1 month
NAICS: 115310
New
SLED
2026-2027 Project Work RFP- Astoria, Forest Grove and Tillamook Districts
Solicitation # S-62900-00018313
The Oregon Department of Forestry is soliciting proposals under solicitation S-62900-00018313 to establish a pool of contractors for project work services within the Clatsop and Tillamook State Forests. Managed by the Astoria, Forest Grove, and Tillamook Districts, the scope of work includes road construction, improvement, maintenance, and brushing, as well as stream enhancement, soil stabilization, water runoff control, rock crushing, and road vacating. The procurement utilizes a Service Agreement and Work Order Contract structure, with an anticipated initial term from December 30, 2026, to December 30, 2029, and potential annual renewals through December 30, 2032. Proposals must be submitted as a single PDF attachment by December 3, 2026, at 2:30 PM PT, including a signed cover sheet and a qualifications and experience worksheet. Award decisions are based on a scoring system with a maximum of 700 points, considering responsiveness, past performance, and references. Selected contractors must provide a performance bond equal to 10 percent of the awarded bid amount and maintain insurance as specified in the agreement. Compliance requirements include adherence to Oregon tax laws, non-discrimination policies, and environmental safety standards, such as the stabilization of disturbed soils and the proper management of hazardous materials and waste. Final acceptance of work is subject to state inspection within twenty business days of completion notification.
Department of Forestry

POSTED

1 day ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

This project involves the removal of pinyon and juniper seedlings and saplings across approximately 60 acres in northern Ouray County, Colorado, located about 12 miles southwest of Montrose. The primary objective is to reduce wildland fuels, improve wildlife habitat, and maintain landscape health by using hand tools to cut all surviving trees greater than 6 inches tall within designated 1970s-era rollerchop areas. This opportunity is restricted to contractors with an established BLM Fuels Reduction IDIQ contract under solicitation NAR060060 and active registration with CCR.gov. The estimated performance period runs from August 15, 2009, through September 15, 2009, with award contingency based on the recipient's ability to meet Recovery Act reporting requirements.

General Info

Remove pinyon and juniper seedlings across 60 acres in Ouray County, Colorado.

NAICS

115310 - Support Activities for Forestry

Place of Performance

Montrose, Colorado (Quray County)2505 S. Townsend AveMontroseCO81401-5436United States of America 81401-5436 United States of A, CO

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Presolicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Colorado State Office
ContactsNo contacts available
OfficeLakewood, CO, 80225, USA
Office AddressLakewood, CO, 80225, USA
ContactsNo contact information available

Full Description

Show more
The Lower Horsefly treatments are being done in 1970s-era rollerchops that are primarily open pinyon-juniper woodland. The object of this contract is to cut down all of the surviving pinyon and junipers within a portion of one of these chainings in order to reduce wildland fuel, improve wildlife habitat and maintain landscape health. The removal of these pinyon and juniper seedlings and saplings will be accomplished by crews provided by the contractor using hand tools. The size of this project will total approximately 60 acres. The area is located approximately 12 miles southwest of Montrose, Colorado in Ouray County. All trees greater than 6 inches tall will be cut, except as described below in the Description of Work. Tree density within the cutting units is less than 20%. Fuels Reduction IDIQ item 0001AD, level 1. The IDIQ is the BLM National Business Center Solicitation NAR060060 for hazardous fuels reduction Receipt of an award is contingent on the recipient's ability to meet the requirements in Section 1512 (reports on use of funds) of the Recovery Act. THIS NOTICE IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER the BLM Fuels Reduction IDIQ contracts which were solicited under NAR060060 for hazardous fuels reduction. Those vendors with an established fuels reduction IDIQ contract and have active registration with CCR.gov are the eligible to submit quotations for this project. The project sites are located in northern Ouray County. Estimated performance period is 08/15/2009 through 09/15/2009. The government's technical contact is Steven R. Gardner, +1 (555) 000-0000.

More opportunities from Department Of The Interior → Colorado State Office

Same awarding agency

NAICS: 237990
Federal
B--GUSG HABITAT HYDRO-LOGIC RESTORATION 202
Solicitation # 140L1726R0010
Solicitation 140L1726R0010 is a total small business set-aside construction contract issued by the Department of the Interior's Colorado State Office. The project focuses on hydrologic restoration to benefit the endangered Gunnison sage-grouse in the Crawford, Colorado area. The primary objective is to improve drainage on approximately 7.75 miles of rural roads by installing 204 rolling dips and associated lead-out ditches. These structures are designed to redirect surface water off roadways and onto adjacent sagebrush vegetation to mimic natural hydrologic flow. Construction is strictly limited to a work window between August 30, 2027, and October 22, 2027, although the overall period of performance extends through October 29, 2027. The government will utilize a best-value tradeoff award method, weighing price equally against the combined factors of technical approach, past performance, and schedule. Technical requirements are stringent, requiring rolling dips to be constructed at approximately a 30-degree angle with a cross slope between 4% and 8%, and lead-out ditches not to exceed 57.5 feet in length. Performance is monitored via a Quality Assurance Surveillance Plan, with a 95% acceptance threshold for inspected structures and zero tolerance for disturbances in identified avoidance zones. The contract is subject to Davis-Bacon Act wage determinations and requires contractors to maintain liability insurance and provide resumes for key personnel demonstrating significant experience in project planning and well installation.
Other Heavy and Civil Engineering Construction

POSTED

12 days ago

DEADLINE

in 1 day
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS