Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

RECOVERY - FBNV090003A/B - Construct Water Wells/Waste Water Systems and Repair Water Wells

Active
FA4877-09-R-0008Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

Davis-Monthan AFB, TUCSON, AZ, 85707-3522, USA

Set-Aside

NONE

Documents

48

090003B 01011 Design Requirements for Water System Upgrades

DOCX, High priority: read this firstsow
High

Amendment 17 Wells Requirement Matrix

XLS, High priority: read this firstamendment
High

Attachment #6 090003A AF FORM 66 - Schedule of Material Submittals for FA4877-09-R-0008

XLSX, High priority: read this firstschedule-of-material-submittals
High

Attachment #7 090003B AF FORM 66 - Schedule of Material Submittals for FA4877-09-R-0008

XLSX, High priority: read this firstschedule-of-material-submittals
High

Davis-Monthan Air Force Base Design Compatibility Guidelines (December 2007)

PDF, High priority: read this firstspecifications
High

FA4877-09-R-0008 Cancellation Notice Amendment

DOC, High priority: read this firstamendment
High

FA4877-09-R-0008 Pre-Proposal Conference Minutes

DOC, High priority: read this firstpre-proposal-conference-minutes
High

FA4877-09-R-0008 Preproposal Conference Q&A for Water Wells Construction

DOC, High priority: read this firstq-and-a
High

FA4877-09-R-0008 Water Wells and Waste Water Systems Construction Contract

DOC, High priority: read this firstcontract-document
High

FBNV 090003B Statement of Work for Water Wells Project

DOC, High priority: read this firstsow
High

RFP 090003A Design Requirements for Water System Construction

DOCX, High priority: read this firstrfp
High

Well Requirement Matrix for Water Wells and Waste Water System

XLS, Low priorityother
Low

Attachment+%23+10+CONTRACTOR+PERFORMANCE+QUESTIONNAIRE.pdf

PDF

Attachment+%23+11+Page+1+of+2Cover_Sheet_090003A+Layout1+%281%29.pdf

PDF

Attachment+%23+11+Page+2+of+2+well+locations+090003A.pdf

PDF

Attachment+%23+12+Page+1+of+4+Cover_Sheet_090003B+Layout1+%281%29.pdf

PDF

Attachment+%23+12+Page+2+of+4+valve+and+hydrant+locations+Water+wells+.pdf

PDF

Attachment+%23+12+Page+3+of+4+valve+and+hydrant+locations++Fire+hydrants+.pdf

PDF

Attachment+%23+12+Page+4+of+4+valve+and+hydrant+locations+Water+wells+.pdf

PDF

Attachment+%23+13+hydrant+locations.mdi

OCTET-STREAM

Attachment+%23+13+hydrant+locations.tif

TIF

Attachment+%23+14+Isolation+Valve+Locations.mdi

OCTET-STREAM

Attachment+%23+14+Isolation+Valve+Locations.tif

TIF

Attachment+%23+15+Sheet+1+D-M+Water+System+Technical+Report.mdi

OCTET-STREAM

Attachment+%23+15+Sheet+1+of+2+D-M+Water+System+Technical+Report.tif

TIF

Attachment+%23+15+Sheet+2+of+2+Pressure+Zones.tif

TIF

Attachment+%23+15+Sheet+2+Pressure+Zones.mdi

OCTET-STREAM

Attachment+%23+16+Well+logs.pdf

PDF

Attachment+%23+1+AZ080011+02-27-2009++AZ11.pdf

PDF

Attachment+%23+2+090003A+SOW-12+Mar+2009.pdf

PDF

Attachment+%23+3+090003B+SOW-12+Mar+2009.pdf

PDF

Attachment+%23+4+090003A+01011+RFP.pdf

PDF

Attachment+%23+5+090003B+01011+RFP.pdf

PDF

Attachment+%23+8+090003A+Master+Specification+Section+01010+%28Draft+for+AE+Use%29.pdf

PDF

Attachment+%23+9+090003B+Master+Specification+Section+01010+%28Draft+for+AE+Use%29+9+Mar+09.pdf

PDF

Attachmnet+%23+21+Sheet+10+of+12+Well+9.pdf

PDF

Attachmnet+%23+21+Sheet+11+of+12+Well+6.pdf

PDF

Attachmnet+%23+21+Sheet+12+of+12+ATC+Tower.pdf

PDF

Attachmnet+%23+21+Sheet+1+of+12+Site+5+Tank.pdf

PDF

Attachmnet+%23+21+Sheet+2+of+12+Runway+Piping.pdf

PDF

Attachmnet+%23+21+Sheet+3+of+12+Well+2.pdf

PDF

Attachmnet+%23+21+Sheet+4+of+12+Well+4.pdf

PDF

Attachmnet+%23+21+Sheet+5+of+12+Well+17.pdf

PDF

Attachmnet+%23+21+Sheet+6+of+12+Well+16.pdf

PDF

Attachmnet+%23+21+Sheet+7+of+12+Well+15.pdf

PDF

Attachmnet+%23+21+Sheet+8+of+12+Well+11.pdf

PDF

Attachmnet+%23+21+Sheet+9+of+12+Well+10.pdf

PDF

FA4877-09-R-0008+Amendment+1.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

8 updates
PhaseSolicitation
Posted

Presolicitation

Notice updated

The notice title changed.

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline added: Jun 6, 2009. The notice description changed.

Notice updated

Response deadline changed from Jun 6, 2009 to Jun 5, 2009. The notice description changed.

Type Changed

Presolicitation → Solicitation

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4877 355 Cons Pk
Contacts2 people available
OfficeDAVIS MONTHAN AFB, AZ, 85707-3522, USA
Office AddressDAVIS MONTHAN AFB, AZ, 85707-3522, USA
Contacts
Bryan JacksonContract Administrator
Daniel B. ThelenContracting Officer

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational station featuring mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The contract is a small business set-aside and will be awarded to the responsible bidder submitting the lowest responsive bid. Bids must be submitted using the EJCDC C-410 form and include a bid bond, evidence of signing authority, and MWBE compliance documentation. Performance and payment bonds are required upon award. Project administration follows EJCDC standard general and supplementary conditions, with payments processed monthly via applications for payment reviewed by the Engineer. Final acceptance is contingent upon a substantial completion inspection, the resolution of a punch list, and a final inspection conducted by the Owner, Contractor, and Engineer.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 20 days
View Details

More opportunities from Department Of Defense → FA4877 355 Cons Pk

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS