Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM ET

Register Free →

Recovery / For Information Purposes Only / Solar Water System

Active
RTX00431SolarWaterSystemFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract concerns the installation of a solar-powered hot water system as an opportunity exclusively available to the contractor already holding the Construction IDIQ Contract for Texas Zone V. The scope of work includes installing a photovoltaic solar concentrating system along with the necessary support structure and components to ensure full operability. Prior to installation, the contractor must provide water hook-ups in the rooftop mechanical room and ensure continuous hot water supply to the building throughout the process. Specialized services required include renting a licensed crane for material transport to the roof and engaging a qualified roofing contractor to perform all necessary roof penetrations on the building’s flat roof. Additionally, the contractor is responsible for installing electrical infrastructure, notably a 30 amp, 220 volt breaker and power line to support an 80-gallon backup hot water tank, as well as installing a monitoring system for the new solar setup. The contractor must ensure the system is fully operational and conduct start-up procedures and monitoring until the unit is functioning properly. The contract is managed by the General Services Administration's PBS R7 Non-prospectus office, with the place of performance in Austin, Texas, and the contracting officer listed as Sylvia Garza. This notice serves solely as informational and is not a solicitation for new offers.

General Info

Installation of solar hot water system in Austin by existing Texas Zone V contractor, including electrical and roofing work.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

United States Courthouse 200 W. 8th Street, AUSTIN, TX, 78701, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

special-notice

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs R7 Non-Prospectus - Eastern
Contacts1 person available
OfficeLITTLE ROCK, AR, 72201, USA
Office AddressLITTLE ROCK, AR, 72201, USA
Contacts
Sylvia GarzaContracting Officer

Full Description

Show more
Recovery. This Notice is For Information Purposes Only. This opportunity is only available to the contractor under the existing Construction IDIQ Contract for Texas Zone V under Contract No. GS-07P-99-HHD-0025 (Ed A. Wilson., Fort Worth, TX). This notice is not a notice for solicitation for offers. Install a solar powered hot water system. The installation shall include photovoltaic solar concentrating system, support structure, and all associated components necessary for a full operational system. Contractor shall provide water hook-ups in the rooftop mechanical room prior to the installation of the solar thermal system. Contractor shall insure that there will be no interruption of the existing hot water to the building during the installation. The contractor shall rent a licensed and insured crane company to transport material to the building roof. The contractor shall bring on to the project a qualified roofing contractor to make all the needed penetrations of the building's flat roof. Contractor shall install a 30 amp, 220 volt (single phase) breaker and power line from the panel box to the back up 80 gallon hot water tank. The contractor shall install a monitor for the new solar system. Contractor shall complete system for start up and monitoring, until the entire unit is proper working order.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
SLED
OSU-265184, Ross Heart Hospital - Administrative Suite Renovation
Solicitation # OSU-265184
The Ohio State University is soliciting bids for the Ross Heart Hospital Administrative Suite Renovation (Project OSU-265184) located in Columbus, Ohio. The project involves interior renovations on the first floor, including reconfiguring office walls, renovating a break room, and expanding a unisex restroom to meet 2010 ADA accessibility standards. The scope also includes two alternates: the first to replace a moveable partition between two conference rooms with a permanent metal stud partition, and the second to install specific new door types. The base bid is estimated at 663,000.00 dollars, with additional estimates of 72,336.00 dollars and 15,000.00 dollars for the alternates, respectively. All work must reach substantial completion within 79 consecutive days from the Notice to Proceed. Bids must be submitted electronically via BidExpress by October 19, 2026, at 2:00 PM EST. The contract will be awarded to the lowest responsive and responsible bidder. Requirements for bidders include compliance with prevailing wage laws, a 5 percent EDGE participation goal, and evidence of a Drug-Free Safety Program approved by the Ohio Bureau of Workers Compensation. Contractors must provide a bid security for the full amount of the bid and subsequent performance and payment bonds. Legal certifications are required regarding Ohio ethics laws, conflict of interest, and prohibitions against boycotting jurisdictions with whom Ohio maintains open trade. Payment for labor is made at a rate of 96 percent of the invoiced amount, with payments issued within 30 days of acceptance.
The Ohio State University

POSTED

about 13 hours ago

DEADLINE

in 7 days
View Details
NAICS: 236220
New
SLED
JBLM Construct CHP Building
Solicitation # W912K3-26-R-A0001
Solicitation W912K3-26-R-A0001 is a Small Business Set-Aside for the design-bid-build construction of a 20,000 square foot Pre-Engineered Steel Controlled Humidity Preservation (CHP) Building at Joint Base Lewis McChord, Washington. The project scope includes site preparation, concrete slab installation, the purchase and erection of the steel building, and the installation of underground utilities and stormwater mitigation via an infiltration pond. Specialized requirements include the installation of desiccant dehumidifying equipment, a dry pipe fire suppression system compliant with UFC 3-600-01 and NFPA 13, and the provision of conduit to support a future photovoltaic solar system. The project is estimated between 1 million and 5 million dollars, with a statutory limit of 5 million dollars. The government intends to award a Firm Fixed Price task order based on a balanced evaluation of technical capability and price. Technical submissions must include a task-oriented schedule with a completion date no later than 360 days after the Notice to Proceed, as well as qualifications for key personnel. Performance must adhere to strict quality standards, including ISO 9001 and various ASTM and WSDOT specifications. The contractor is required to provide bid guarantees, and performance and payment bonds are mandatory for awards exceeding 150,000 dollars. All labor must comply with the Davis-Bacon Act per Wage Determination WA20260111 for Pierce County. Offers are due by October 18, 2026.
Bristol Alliance of Companies

POSTED

about 13 hours ago

DEADLINE

in 6 days
View Details
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 13 hours ago

DEADLINE

in about 2 months
View Details
NAICS: 236220
New
South Concourse Evolution (SCE) Bid Package 3
Solicitation # south-concourse-evolution-sce-bid-package-3
Hensel Phelps, acting as the General Contractor and Construction Manager, is soliciting bids for Bid Package 3 of the South Concourse Evolution project at the Seattle-Tacoma International Airport in Washington. This solicitation is designated as an 8A set-aside for Small Disadvantaged Businesses and encompasses ten distinct construction subsystems. The scope of work includes glass and aluminum systems, vertical transportation, the demolition and installation of passenger loading bridges, and various interior finishes for main electrical rooms, such as masonry, drywall, doors, frames, hardware, miscellaneous metals, firestopping, joint sealants, and paint and epoxy flooring. Budget ranges for these subsystems vary significantly, with the largest allocations for glass and aluminum systems and vertical transportation. The project is governed by a Project Labor Agreement and requires all subcontractors to provide a Workers Compensation Waiver of Subrogation. Bidders must submit their proposals via email using the official bid form and include a required bid bond. Successful awardees will be required to furnish Small Business Administration documentation and execute contracts using standard Hensel Phelps subcontract forms. The solicitation emphasizes the inclusion of diverse trade partners, specifically encouraging participation from small, disadvantaged, veteran-owned, service-disabled veteran-owned, and HUBZone businesses.
Hensel Phelps

POSTED

about 13 hours ago

DEADLINE

in about 19 hours
View Details
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located at 41901 Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation including soil stabilization and utility relocation; construction of the plant featuring a Membrane Bioreactor system, UV disinfection, and SCADA; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. The total duration for the project is 915 calendar days, with a requirement to maintain existing plant services during the initial construction phases and adhere to General Order/NOA regulatory standards. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DVBE, SDVOSB, WOSB, and DBE. A significant local hiring goal is established, targeting 50 percent of the total construction workforce from the Monterey Bay Area. Bids are due by October 28, 2026, following a mandatory pre-bid meeting on October 5, 2026. Subcontractors must utilize the Textura electronic invoicing system, accept the standard Overaa agreement without modification, and may be required to provide a performance and labor bond for 100 percent of the subcontract price.
C. Overaa & Co.

POSTED

about 13 hours ago

DEADLINE

in 15 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS