This Government Contract opportunity from Department Of Agriculture was posted on September 1, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
DOCX, High priority: read this first36 pages · rfp
HighAI Summary for AG-9702-S-10-0526 Gerle Creek Campground Demolition and Upgrade: Solicitation for the demolition and upgrade of the Gerle Creek Campground in Eldorado National Forest. The scope includes demolition of existing camp units, waterlines, and toilets; installation of new toilet facilities and water systems; construction of camp units; and road paving. The document includes a detailed Schedule of Items (CLINs) and a performance period of 90 calendar days from the notice to proceed.
PDF
PDF, High priority: read this first1 page · amendment
HighAI Summary for Amendment AG-9702-S-10-0526-000001: Standard Form 30 amendment dated 07/20/2010 for USDA Forest Service solicitation AG-9702-S-10-0526. The purpose of this amendment is to modify the Section B Schedule of items, add local clauses to Section H Special Contract Requirements, and update the Section J List of Attachments.
PDF
PDF, High priority: read this first119 pages · specifications
HighAI Summary for Attachment 1 - Specifications: Technical specifications document containing a detailed index of work items (including earthwork, paving, and concrete) and general specifications. It defines abbreviations, organizational standards (AASHTO, ACI, etc.), and key contractual definitions for a construction project.
PDF
PDF, High priority: read this first8 pages · specifications
HighAI Summary for Fire Plan for Construction and Service Contracts (June 2006): Dated June 14, 2006, this document outlines the fire prevention and suppression requirements for contractors performing construction and service contracts within Forest Service areas. It details contractor responsibilities, mandatory fire tools and equipment (including spark arresters, extinguishers, and water tank specifications), and compliance with the California Public Resources Code during the Fire Precautionary Period.
PDF
PDF, High priority: read this first37 pages · wage-determination
HighAI Summary for General Decision Number CA100009 - California Wage Determination: General Decision Number CA100009 (dated 07/09/2010) provides prevailing wage rates and fringe benefits for building, heavy, and highway construction projects across various counties in California. The document specifies hourly rates for multiple classifications, including Asbestos Workers, Boilermakers, Bricklayers, and Carpenters, broken down by specific geographic areas.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Gerle Creek Campground Rehab - ARRA Signage Detail L-2.5: Technical drawing/specification sheet L-2.5 for the Gerle Creek Campground Rehab project within the Eldorado National Forest. The document provides instructions for the display and removal of ARRA signage at active construction sites and references detail L-2.2 for signage construction.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Gerle Creek Campground Rehab - Cover and Index: Cover and index sheet for the Gerle Creek Campground Rehabilitation project within the Eldorado National Forest, Pacific Ranger District. The document includes a project area map and an index of sheets ranging from general notes and demolition plans to specific layout and detail drawings.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Gerle Creek Campground Rehab - Cover / Index: This document is the Cover and Index sheet (L-0.0) for the Gerle Creek Campground Rehabilitation project within the Eldorado National Forest, USDA Forest Service. It provides a list of drawing sheets, including general notes, demolition plans, layout plans, and various detail sheets, and includes vicinity and location maps for the project area.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Gerle Creek Campground Rehab - Demolition Plan L-0.2: Technical drawing and demolition plan (Sheet L-0.2) for the Gerle Creek Campground Rehabilitation project within the Eldorado National Forest, USDA Forest Service. The document includes a demolition key specifying the removal of culverts, valves, faucets, redwood barriers, and water lines, as well as instructions for clearing and grubbing camp sites.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Gerle Creek Campground Rehab - Details L-2.2: Technical drawing and specification sheet (L-2.2) for the Gerle Creek Campground Rehabilitation project within the Eldorado National Forest. The document provides detailed construction specifications for campfire rings, picnic tables, pedestal grills, fee stations, bulletin boards, and traffic signage, including material requirements (e.g., Pilot Rock models, redwood, MDO plywood) and installation details.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Gerle Creek Campground Rehab - Details L-2.4: Technical drawing and specification sheet (L-2.4) for the Gerle Creek Campground Rehab project within the Eldorado National Forest. The document provides detailed installation plans and specifications for food storage lockers (Tahoe Bear Box Co Model FS24), fee tubes, silt fences, coir rolls, and camp unit markers, including material requirements and concrete pad details.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Gerle Creek Campground Rehab - Details Sheet L-2.0: Technical drawing and specifications sheet (L-2.0) for the Gerle Creek Campground Rehabilitation project within the Eldorado National Forest. The document provides detailed construction specifications for parking spur plans, road overlay details, camp unit details, and turnout configurations, including material requirements for asphalt concrete and aggregate bases.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Gerle Creek Campground Rehab - Details Sheet L-2.3: Technical drawing and specification sheet (L-2.3) for the Gerle Creek Campground Rehabilitation project within the Eldorado National Forest. Includes detailed construction plans for timber stairways, barrier rock installation, aggregate base walkways, CMP culvert installation, and street marking directional arrows, including material requirements and installation notes.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Gerle Creek Campground Rehab Drawing Set: Technical drawing set and specifications for the Gerle Creek Campground Rehabilitation project in Eldorado National Forest, dated October 15, 2010. The document includes general notes on erosion control, demolition, and construction, a schedule of items (CLINs) for mobilization and earthwork, and an index of layout, grading, and detail sheets. It is funded by the American Recovery and Reinvestment Act.
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Gerle Creek Campground Rehab - General Notes & Schedule of Items: Technical specifications and a detailed schedule of items for the Gerle Creek Campground Rehabilitation project within the Eldorado National Forest (USDA Forest Service). Dated April 1, 2010, the document includes general notes on erosion control, demolition, construction requirements for vault toilets and water lines, and a comprehensive bid schedule covering items such as asphalt, aggregate, campsite furnishings, and precast vault toilets.
PDF
PDF, High priority: read this first4 pages · amendment
HighAI Summary for Gerle Creek Campground Rehabilitation - Summary of Changes: This document outlines modifications to the Gerle Creek Campground Rehabilitation project. Key changes include updates to the Schedule of Items (Section B) with revised quantities, deleted items, and new item additions (e.g., asphalt, barrier rock, and vault toilets). It also adds special contract requirements (Section H) regarding fire plans, utility services, and equipment cleaning, corrects the period of performance to 402 days (Section F), and updates the Plans and Drawings attachment (Section J).
PDF
PDF, High priority: read this first1 page · specifications
HighAI Summary for Gerle Creek Campground Rehab - Layout Plan L-1.0: Technical layout plan and symbol key for the Gerle Creek Campground Rehabilitation project within the Eldorado National Forest (USDA Forest Service). Dated 04/01/2010, the document includes a detailed symbol key with quantities for camp units, water lines, vault toilets, and road overlays, as well as specific installation instructions for infrastructure and signage.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for L-2.1 - Drain Unit and Refuse Bin Pad Details: Technical drawing specifications and details for a drain unit, refuse bin pad, and faucet unit with sump. Includes scale references and material requirements such as galvanized metal screens, non-woven geotextile filter fabric, and clean rock fill.
PDF
PDF, High priority: read this firstpast-performance
HighAI Summary for Response to Evaluation Factors Template: A template document used by bidders to respond to evaluation factors. It includes sections for firm experience, past performance references, site visit details, resource allocation (labor and equipment), safety plans, and project sequencing.
PDF
PDF, High priority: read this first3 pages · rfp
HighAI Summary for Solicitation AG-9702-S-10-0526: ARRA Gerle Creek Campground Rehab: Federal solicitation (SF 1442) issued by the USDA Forest Service on July 13, 2010, for the ARRA Gerle Creek Campground Rehab (CIM-05-07F). The project is a construction effort with a price range between $500,000 and $1,000,000, issued under the Small Business Competitiveness Demonstration Program. It includes specific performance timelines and invoicing instructions.
PDF
PDF, High priority: read this first2 pages · bid-bond
HighAI Summary for Standard Form 24 - Bid Bond: Standard Form 24 (Revision 10-98), a prescribed GSA/FAR document used as a bid guaranty. It establishes a legal obligation where the Principal and Sureties are bound to the U.S. Government for a penal sum if the Principal fails to execute the contract and provide required bonds upon acceptance of the bid.
AI Contract Breakdown
Uniform Contract Format
Contract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
2 updates
PhaseAwarded
Posted
Presolicitation
Notice updated
Response deadline added: Aug 11, 2010. The notice description changed.
Notice updated
Response deadline time changed from 10:00 PM UTC to 7:00 PM UTC on Aug 11, 2010. The notice description changed.
Type Changed
Presolicitation → Solicitation
Awarded
Contract was awarded
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Organization & Contact Information
Show more
AgencyDepartment Of Agriculture → USDA Forest Service-Spoc Software
RECOVERY - THIS IS AN AMERICAN RECOVERY AND REINVESTMENT ACT (ARRA) ACTION. This is a PRESOLICITATION SYNOPSIS. The USDA Forest Service, Eldorado National Forest (hereafter "the Government," "the Forest Service," or "the Eldorado National Forest (NF)"), announces a requirement for demolition and upgrade of an existing campground. Work includes demolition of existing camp units, replacement of waterlines and toilets, construction of camp units, installation of new and existing furnishings, and overlaying campground road and paving spurs. The contractor shall provide all management and project administration services, quality control, logistical support, vehicles, equipment and materials to complete the project on schedule. The work area is located at the Gerle Creek Campground, El Dorado County, California. This acquisition is being advertised as a Total Small Business set-aside under FAR Part 19. The estimated construction range of magnitude is $500,000.00 - $1,000,000.00. Contract period of performance is 365 calendar days after receipt of the Notice to Proceed. The applicable North American Industry Classifications System (NAICS) Code is 237990. The Small Business Administration size standard is $33.5 million. Contractors are required to be registered and active with the Central Contractor Registration (CCR) System and Online Representations and Certifications Application (ORCA). THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS SYNOPSIS. No reimbursement will be made for any costs associated with providing information in response to this synopsis or any follow up information requests. The solicitation with specifications and wage rates will be posted to the https://www.fbo.gov/ website on or about 13 July 2010. No hardcopies of the solicitation and applicable amendments will be mailed. To receive the Request for Proposal package and any applicable amendments, offerors must download them from the https://www.fbo.gov/ website.
More opportunities from Department Of Agriculture → USDA Forest Service-Spoc Software