Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on August 31, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

PORTER AVENUE SEWER RELINING PROJECT, TOWN OF CHESTERTON, INDIANA

Awarded
W912P6-10-B-0012Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
International
Construction of Big White Pickleball Courts
Solicitation # RDKB-26-PBCBW
The Regional District of Kootenay Boundary (RDKB) is soliciting bids for the construction of two pickleball courts at the Big White Ski Resort, specifically located at the Happy Valley Skating Rink in British Columbia. This unit price contract encompasses a comprehensive scope of work including earthworks, site grading, drainage, the removal of oversized boulders, pavement construction, concrete curbing, asphalt paving, and court surfacing. Key deliverables include the installation of cast-in-place net pole bases and the provision of survey layout and project record documents. The project is scheduled for substantial completion by June 7, 2027, with final completion required by June 15, 2027. Prospective bidders must submit their proposals in PDF format via email to Mark Daines by the December 11, 2026, deadline. Submissions must include detailed company information, a designated Project Manager as the single point of contact, at least two relevant references, and a comprehensive fee structure including a total maximum upset fee and a schedule of hourly rates. Bidders must also provide a work plan, methodology, and a list of all proposed subconsultants. Mandatory requirements include the ability to maintain Comprehensive General Liability Insurance of at least 5,000,000.00 CAD, compliance with the British Columbia Workers Compensation Act, and the submission of a Health and Safety Manual and Occupational Health and Safety Plan prior to commencing onsite work. Award decisions are based on a ranking process, and the successful proponent must provide performance security within 10 days of being deemed the highest ranked.
Regional District of Kootenay-Boundary

POSTED

about 16 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

Solicitation Number W912P6-10-B-0012 is a firm-fixed price construction contract issued by the Department of Defense, specifically the U.S. Army Engineer District Chicago, for the Porter Avenue Sewer Relining Project in Chesterton, Indiana. The project requires a contractor to provide all labor, materials, transportation, and equipment to install approximately 2,255 linear feet of an 18-inch diameter cured-in-place pipe liner using the inversion and curing of a resin-impregnated tube method. Additional scope of work includes the in-situ grouting of leaking vitrified clay pipe joints, traffic control, and sewage by-pass pumping, which involves the temporary re-routing of a force main. Competition for this acquisition is restricted to small business concerns under NAICS code 237110, with an estimated project cost between 250,000 and 500,000 dollars. The procurement process included a pre-bid meeting and site visit on March 17, 2010, and was subject to several amendments that updated technical drawings, provided flow data, and revised applicable wage rates. To be eligible for award, contractors were required to be registered in the Central Contractor Registration system. The primary point of contact for this acquisition is Sean McNab.

General Info

Contract Value

$175,982

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Porter Avenue from Calumet Road to Sixth Street, CHESTERTON, IN, 46304, USA

Set-Aside

NONE

Award Issued Date

Documents

4
PDF, High priority: read this first1 page · amendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline time changed from 7:00 PM UTC to 8:00 PM UTC on Apr 5, 2010. The notice description changed.

Notice updated

Response deadline time changed from 8:00 PM UTC to 7:00 PM UTC on Apr 5, 2010. The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Chicago
Contacts2 people available
OfficeCHICAGO, IL, 60604-1437, USA
Office AddressCHICAGO, IL, 60604-1437, USA
Contacts
Regina G. BlairCHIEF, CONTRACTING BRANCH

Full Description

Show more
IMPORTANT NOTE: This agency inadvertently posted the Bid package for Solicitation Number W912P6-10-B-0012 under the WRONG Solicitation Notice, numbered as: "W912P6-10-B-0011." Thus, interested bidders shall disregard Solicitation Notice W912P6-10-B-0011 in its entirety, as this Solicitation Notice replaces the solicitation specifics noted therein, with the exception of the Solicitation Number. Bidders are required to use THIS Notice to obtain all information regarding Solicitation Number W912P6-10-B-0012, including the downloading of the Bid package, any associated amendments, and/or files. PROJECT INFORMATION: Under the contract set, the Contractor will be responsible for providing all necessary labor, transportation, materials, and equipment to construct approximately 2,255 Linear Feet (LF) of an 18-inch diameter cured-in-place pipe (CIPP) liner to be installed by Inversion and Curing of a Resin-Impregnated Tube (ASTM F 1216) on Porter Avenue from Calumet Road to Sixth Street in Chesterton, Indiana. The project anticipates insitu grouting of leaking vitrified clay pipe joints. No customer sewer service connections are anticipated. Project is expected to include by-pass pumping of sewage including temporary re-routing of a force main, and traffic control. ACQUISITION INFORMATION: Competition for this acquisition is RESTRICTED to SMALL BUSINESS CONCERNS. The Classification Code for this procurement is North American Industry System Code 237110, which applies a small business size standard in dollars of $33.5M. The magnitude of cost for this construction project is estimated between $250K and $500K. The Invitation for Bids (IFB) Package will be downloadable from the INTERNET ONLY. The project specification files are Portable Document Format (PDF) files and can be viewed, navigated or printed using Adobe Acrobat Reader. Interested Bidders can download the IFB Package from this Internet Site http://www.fbo.gov., which was made available on 5 March 2010. The bid opening date is 5 April 2010 at 02:00pm CST. In order for contractors to be awarded contracts with the Department of Defense, the contractor must be registered in the Central Contractor Registration (CCR); Contractors can access the CCR for free at http//www.ccr.gov. The Government intends to award a firm-fixed price construction contract from this acquisition. Request for solicitation packages made by telephone, fax or e-mail will not be honored. The Point of Contact for this acquisition is Sean McNab at +1 (555) 000-0000.

More opportunities from Department Of Defense → W072 Endist Chicago

Same awarding agency

NAICS: 237130
New
Federal
CSSC Utility Feed Transformer Replacement
Solicitation # W912P627SSA001
The U.S. Army Corps of Engineers, Chicago District, is conducting market research via Sources Sought Notice W912P627SSA001 to identify qualified small business contractors for the turnkey removal and replacement of two utility feed transformers at the Chicago Sanitary and Ship Canal Fish Dispersal Barrier facility in Lockport, Illinois. The project involves the removal and disposal of two existing 4,000/5,000 kVA transformers and the installation, testing, and commissioning of two new operational replacements. The contractor will be responsible for all labor, materials, equipment, rigging, and supervision, while existing concrete pads, cabling, and switchgear will be reused. The estimated magnitude of construction is between 500,000 and 1,000,000 dollars, with an estimated project schedule of 365 calendar days. Interested firms must demonstrate technical capabilities in medium-voltage electrical work, including pre-energization electrical acceptance testing in accordance with NETA ATS and IEEE C57 standards. Key requirements include the ability to supply biobased dielectric insulating fluid and steel enclosures with recovered materials, as well as strict adherence to USACE EM 385-1-1 and NFPA 70E safety standards. Applicants must provide their small business status under NAICS code 237130, proof of bonding capacity, and up to three relevant project examples from the last five years. Responses, which should not include price quotes, are due by November 5, 2026, and must be submitted using the provided response template.
Power and Communication Line and Related Structures Construction

POSTED

6 days ago

DEADLINE

in 4 days
View Details
NAICS: 236220
Federal
PRESOLICITATION NOTICE FOR GATE HOIST MACHINERY PAINTING AND HOIST HOUSE REHABILITATION FOR FOX RIVER DAMS, WISCONSIN
Solicitation # W912P626BA026
The U.S. Army Corps of Engineers Chicago District is preparing to solicit a contract for the repainting of gate hoisting machinery and the rehabilitation of hoist houses across nine dams on the Fox River in Wisconsin, including Kaukauna, Little Chute, Cedars, Appleton Lower, Menasha, Appleton Upper, DePere, Little Kaukauna, and Rapid Croche Dams. The scope of work includes surface preparation and painting of all gate hoisting equipment as well as comprehensive structural upgrades to each hoist house such as replacing shingle roofing with metallic sheet roofing, installing heavy duty commercial doors with modified framing, swapping exterior vinyl siding for galvalume, renewing soffit and fascia, and adding insulation to ceiling and wall cavities. All work must comply with USACE EM 385-1-1 safety and construction standards, and the contract will be executed under a single-year performance period beginning after award. This acquisition is strictly reserved for small business concerns as defined by the North American Industry Classification System code 236220, with a size standard of $45 million in annual receipts. Interested vendors must be actively registered in the System for Award Management (SAM) at the time of proposal submission and must also register in the DoD’s Procurement Integrated Enterprise Environment (PIEE) system to access the official solicitation, which will be released in the fourth quarter of fiscal year 2026. Proposals submitted via telephone, fax, or email will not be accepted. All correspondence must reference the solicitation number W912P626BA026, and inquiries should be directed to the primary point of contact, Ericka Hillard. Contractors are encouraged to review the USACE Contract Changes Playbook for guidance on equitable adjustments and change order processes under the contract.
Commercial and Institutional Building Construction

POSTED

4 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS