Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 16, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RECOVERY -- PROJECT NUMBER 12329, Design of the Sebrings Mills Bridge Replacement, Floodwall, and Associated Floodproofing and Program Management Plan (PgMP) for the Remaining CHBD Elements of Green Brook Flood Damage

Awarded
W912DS-08-D-0004Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
Road Asset Management
Solicitation # FY27-ENGCP-002-6
The Bulloch County Board of Commissioners is soliciting Statements of Qualifications for project FY27-ENGCP-002-6, focused on Road Asset Management. The selected consultant will be responsible for collecting and analyzing field data, creating a road asset inventory, and developing a Capital Improvement Plan with an outlook extending to FY 35. The scope includes GIS database development, web-based mapping, and the identification of structural hazards and drainage failures to minimize safety risks and legal liability. All prime and sub-consultants must be GDOT Prequalified Contractors as of the submission deadline on November 20, 2026, at 3:00 PM EDT. Proposals are evaluated based on a composite scoring system that weights prime consultant experience and technical approach at 20% each, GIS capabilities at 20%, asset prioritization methodology at 15%, workload capacity at 15%, and past references at 10%. The highest-ranked consultant will be invited to negotiate a contract. Key requirements include a Principal-in-Charge with at least 10 years of industry experience and comprehensive insurance coverage, including professional malpractice and general liability of at least 1 million dollars per occurrence. Submissions are limited to ten pages, excluding mandatory forms and charts, and must include a Non-Collusion Affidavit and Bidder Declaration. Either party may terminate the resulting agreement with 30 days written notice.
Bulloch County Board of Commissioners

POSTED

about 13 hours ago

DEADLINE

in 21 days

AI Contract Overview

Show more

This contract involves the development and management of key engineering and program plans for the replacement of the Sebrings Mills Road bridge, associated floodwall segments, and floodproofing measures as part of the Green Brook Flood Damage Reduction Program (GBFDRP). The contractor, under the existing contract number W912DS-08-D-0004, will prepare a Project Management Plan (PMP) that aligns with the requirements of the New York District team and collaborating state and local agencies. The PMP will cover the preparation of design documentation reports, engineering reports, plans, specifications, and preliminary scheduling and cost estimations, all adhering to relevant regulations. Additionally, the contractor will create a Program Management Plan (PgMP) to oversee the remaining CHBD elements of the GBFDRP, ensuring effective coordination between project components amidst ongoing economic uncertainties. This PgMP will incorporate a construction sequence analysis, cost updates, and scheduling, serving as a dynamic tool throughout project execution. The scope also includes active coordination with the U.S. Army Corps of Engineers, local municipalities, counties, and the New Jersey state government regarding construction sequencing, required permits, and temporary bridge considerations. The contractor is expected to participate in four coordination meetings as part of the contract deliverables.

General Info

Develop and manage engineering, program plans for Sebrings Mills Road bridge and floodproofing under GBFDRP.

Contract Value

$0

NAICS

541330 - Engineering Services

Place of Performance

NY, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Presolicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SD Endist New York
Contacts1 person available
OfficeNEW YORK, NY, 10278-0004, USA
Office AddressNEW YORK, NY, 10278-0004, USA

Full Description

Show more
RECOVERY -- PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTOR UNDER THE CURRENT CONTRACT NUMBER W912DS-08-D-0004. SCOPE OF SERVICES Task 1: Development of Project Management Plan for the Sebrings Mills Road bridge replacement and associated project components The A/E shall develop a PMP containing the requirements and expectations of the New York District team (including NJDEP and other project partners, to include the Borough of Middlesex, Township of Green Brook, and Middlesex and Somerset counties) for the development of a Design Documentation Report (DDR), and Engineering Documentation Report (EDR), and plans and specifications for the Sebrings Mills Road Bridge replacement, the floodwall segment downstream of the bridge, and associated floodproofings. The PMP will outline the tasks associated with the development of the DDR, EDR, plans and specs and preliminary design and construction schedule, as well as preliminary design costs. The scope of the PMP tasks will be in accordance with applicable regulations and guidance as indicated in Section II of this SOW. Task 2: Green Brook Flood Damage Reduction Program Management Plan The A/E will create a Program Management Plan to manage the remaining components of the CHBD portions of the GBFDRP. The PgMP shall consider the "Green Brook Segments C, H, B & D Construction Sequence Analysis Report" dated April 2006. As design and construction of the GBFDRP moves forward, there is a critical need to closely monitor design and construction of the remaining project components given economic uncertainties. A PgMP will help allow for better coordination of the remaining project components and ensure a framework is in place to facilitate coordination with state and local governments, and associated agencies, as well as affected commercial interests such as railroads and communications companies. The PgMP will reflect the USACE's current strategy for completing the GBFDRP, an updated project cost estimate, and preliminary project schedule. This document will be a living document, continually updated as necessary and be a tool to be utilized by the project delivery team. Task 3: Coordination The A/E will coordinate with the Corps, affected municipalities, counties, and the State of New Jersey regarding the need for a temporary bridge, required permits and sequencing of bridge and CHBD construction. As part of this effort, the A/E will attend a total of four meetings.

More opportunities from Department Of Defense → W2SD Endist New York

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS