Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on February 19, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RECOVERY - Replace the Roofing Systems on Buildings No. 1, 2, 4, 9 and 12 at the Mississippi State, MS location

Awarded
AG-4431-S-10-0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves designing and installing a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system over wood or metal decking. The scope includes structural framing that extends existing bearing walls or utilizes a new post-beam system, the installation of three LED strip light fixtures with one emergency backup, and strict adherence to OSHA safety standards and the Architectural Barriers Act Accessibility Standard of 2007. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be evaluated based on overall best value. This is a small business set-aside opportunity open to various SBA certifications. For bids equal to or greater than $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. Bidders must conduct a physical site visit and sign an attendance roster to be eligible. The project is subject to Construction Wage Rate Requirements, necessitating compliance with California prevailing wages and the submission of weekly certified payroll reports. Additionally, all inspections and testing must be conducted by an independent, third-party agency registered in California. Required insurance minimums include 1 million dollars per occurrence for general liability, 1 million dollars for auto, and 500,000 dollars for workers compensation.
Inland Empire Job Corps

POSTED

about 7 hours ago

DEADLINE

in 3 days
NAICS: 238160
New
SLED
Request for Qualifications for Trade Contractors for 158 Spring Street - ROOFING AND FLASHING ONLY
Solicitation # COC-RFQ-FY27-31162RF
The City of Cambridge is seeking prequalified Trade Contractors for roofing and flashing services as part of a comprehensive renovation of the former Kennedy-Longfellow School, a 101,590 square foot structure located at 158 Spring Street. This procurement is conducted under M.G.L. c.149A Construction Management at Risk, with the specific roofing and flashing trade estimated at 55,571.00 dollars. The overall project duration is approximately 12 months from the notice to proceed. The selection process consists of two phases, beginning with a prequalification phase where firms must submit a Statement of Qualifications (SOQ) via the City's e-Procurement Portal by November 12, 2026. To be eligible for the subsequent bidding phase, firms must achieve a minimum total score of 70 points, with specific minimums required in references and project capacity categories. Mandatory requirements include a valid DCAMM Sub-bidder Certificate of Eligibility, a commitment letter for payment and performance bonds at 110 percent of the estimated contract value, and a 10-hour OSHA-approved safety certification. Applicants must submit a comprehensive package including Trade RFQ Form 1 prior to the SOQ application, along with various schedules detailing business ownership, management personnel, five years of similar project experience, and a three-year workers compensation modifier history. Additional compliance mandates include adherence to the Cambridge Employment Plan, the Responsible Employer Plan, the Living Wage Ordinance, and Minority Business Enterprise programs. All submissions must be electronically filed, and any packages received after the deadline will be rejected.
Capital Buildings Projects

POSTED

about 22 hours ago

DEADLINE

in 13 days

AI Contract Overview

Show more

The U.S. Department of Agriculture Agricultural Research Service is seeking bids for the replacement of roofing systems on Buildings 1, 2, 4, 9, and 12 at its Mississippi State location. The project involves the demolition of existing EPDM roofing membranes, tapered insulation, and flashings, followed by the installation of a fully adhered modified roofing system, including new insulation, gutters, and downspouts. The estimated construction value is between 500,000 and 1,000,000 dollars, with a performance period of 150 days following the Notice to Proceed. This opportunity is a 100 percent total set-aside for 8a Contractors under NAICS code 238160. A firm-fixed price contract will be awarded to the responsible offeror providing the lowest bid. Interested parties must be registered in the Central Contractor Registration and the Online Representation and Certification Application systems to be eligible for the award.

General Info

Agency

N/A

Contract Value

$439,609.35

NAICS

238160 - Roofing Contractors

Place of Performance

810 Highway 12 East, MISSISSIPPI STATE, MS, 38762, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline time changed from 8:00 PM UTC to 7:00 PM UTC on Dec 9, 2009. The notice description changed.

Notice updated

Response deadline changed from Dec 9, 2009 to Dec 16, 2009. The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Terry A KrutzContracting Officer

Full Description

Show more
Amendment No. 1, this amendment answers questions/clarifications raised a the site visit, all other terms and conditions remain unchanged, bid has not been changed. Site Visit Questions and Answers Solicitation No. AG-4431-S-10-0001 Replace Roofs, Buildings No. 1, 2, 4, 9 and 12 USDA, ARS, Mississippi State, MS 1. Confirmation that viable weather will be the only days counted in the 150 day turnaround time. Confirmed, only actual rain days will be added to the 150 days. 2. The spec of the 4 inch strap to hold downspout should be approved or re-evaluate The specifications call for 2" straps. 3. Drainage Gutter System to that specific flow instructions. As far as whether or not, they would rather have galvanized or ceramic coated fasteners. See specifications for fastener material type. Basic principal is that the fastened shall be approved by the manufacturer of the material being fastened. Stainless steel is the default fastener material. 4. Any Preferred vapor barrier fasteners. Should be specified in an addendum. Fasteners shall be as recommended by vapor barrier manufacturer. 5. Specified areas for where dumpsters trash chutes and equipment storage areas are preferred to specify in detail. Contractor staging area has been defined in another response included in the project addenda. 6. Any preferred sites for recycling of materials accumulated during demolition should be noted. There is no recycle requirement for this project. 7. Notice of whether the drains on building One building Two buildings Four building Nine building 12. See project documents. 8. What will be the staging areas for each building? A 120' x 20' staging area will be available in the parking lot to the east side of Building No. 2. The contractor shall supply 8' high gated chain link security fencing around staging area. All post hole penetrations into natural ground or paving surfaces shall be repaired at the end of the project. Any damage to paved surfaces, sodded areas, or landscaping shall be repaired at no additional cost to the government. 9. Will owner pay for materials stored in an offsite insured warehouse? Yes, but the contractor will need to provide receipts for the materials prior to payment request. 10. Is the desired cover board to be " glass mat gypsum roof board (re: Section 072200- Paragraph 2.2.1) or one of the other two listed in Section 072200-Paragraph 3.2.2.1? As per Section 072200, 2.2.1 11. Are the tapered systems to be installed according to Section 072200-Paragraph 3.2 (1" base layer with " minimum tapered) or as shown on Details 1 & 2 on Plan Page A300 (1 " minimum tapered)? See 072200, 2.1.4 12. Are gutters to be supported by aluminum brackets as described in Section 076000-Paragraph 3.1.15 and Table I or as shown on Details 1 & 2 on Plan Page A300? Install as per 076000, 3.1.15

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS