Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on April 9, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RECOVERY - IDC Protective Coatings - Rubber Rmvl/Rwy Restripe Spring/Fall 2009 (Project PQWY 07-1022B1

Awarded
IDCPC-09-R-0003Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 project, a firm fixed price construction contract focused on watershed restoration within the Little Nespelem WMU. The primary objectives are to improve water quality, enhance riparian habitats, promote natural water flow, and reduce the impact of open-road density on wildlife. The scope of work requires the contractor to decommission six road segments totaling 3.29 miles, install two tank traps, and transport all removed non-natural materials, such as culverts and fencing, to a COR-approved disposal facility. All activities must adhere to specific Colville Indian Reservation Tribal Law and Order Codes regarding cultural resources, forest practices, water quality, hydraulic practices, fire management, and industrial safety, as well as 43 CFR 10.4 for inadvertent discoveries. This is an Indian Preference set-aside under the Tribal Employment Rights Ordinance (TERO), requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin. Award will be granted to the lowest, responsive, and responsible bidder who demonstrates technical experience in stream crossings, road cross drainage, and bank stabilization. Bidders must submit a comprehensive packet by October 29, 2026, including a signed bid sheet for the entire project, a detailed work plan with equipment and schedules, TERO certification, a debarment form, and proof of liability insurance of at least 1,000,000 dollars. The Contracting Officer Representative (COR) will oversee material acceptance and work plan approval to ensure compliance with environmental and safety standards.
Confederated Tribes of the Colville Reservation

POSTED

about 12 hours ago

DEADLINE

in 7 days

AI Contract Overview

Show more

This Task Order for IDC Protective Coatings involves rubber removal and runway re-striping at McChord Air Force Base in Washington. The project is divided into two distinct performance periods during 2009. The spring phase requires the removal of approximately 632,000 square feet of rubber and the re-striping of 129,411 square feet, including centerlines, BAK12 circles, taxi-lines, edge lines, threshold markings, touchdown markings, and runway designation numbers. This work is scheduled for ten consecutive nights from April 15 to April 24, 2009, with re-striping occurring on April 25 and a backup date of April 26. The fall phase consists of removing approximately 480,000 square feet of rubber and performing a reduced re-striping scope of 21,003 square feet, focusing on centerlines, specific BAK12 circles, and taxi-lines. For both periods, the contractor must report the exact locations and square footage of rubber removed to the Construction Inspector by 1000 hours on the day of removal. All operations must be coordinated with Construction Management regarding haul routes and the designated staging area on the F Taxiway aircraft parking pad.

General Info

Agency

N/A

Contract Value

$186,342.86

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

MCCHORD AFB, WA, MCCHORD AFB, WA, 98438, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Notice updated

Notice type changed from Presolicitation to Solicitation. The notice title changed. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Linda A HaleContract Specialist
Randall P. CumminsContract Specialist/Contracting Officer

Full Description

Show more
RECOVERY: 1. This Task Order is for two rubber removals, spring and fall of 2009, consequently there are two on-site performance periods. 2. SPRING 2009 DESCRIPTION OF WORK: 2.1 Remove approximately 632,000SF (80' x 7900') of rubber on the runway at locations directed by Construction Management (CECC). 2.2 Re-stripe centerline (white-18,150SF-60.5ea 3'x100' stripes). 2.3 Re-stripe BAK12 circles (yellow w/o beads-942SF-12ea 10' diameter circles). 2.4 Re-stripe leadoff taxi-lines (yellow 2,539SF-5,077LF 6"wide) on the runway. Stop all taxi-lines three-foot short of the edge line. 2.5 Re-stripe edge lines (white-58,680SF-9780'x 3'wide x 2 sides). 2.6 Re-stripe threshold markings (white-14,400SF). 2.7 Re-stripe touchdown markings (white-34,200SF). 2.8 Re-stripe runway designation numbers (approx 500SF). 2.9 Total accumulative re-striping of above requirement is 129,411SF. 2.10 The contractor shall provide the locations and amounts (SF) of rubber removed to the Construction Inspector of record (not the escort) by 1000 hours of the day the rubber was removed. 2.11 Remove rubber for ten consecutive days from 0100 hours to 0600 hours beginning 15 Apr 2009 and ending on 24 Apr 2009, specifically: 15 APR 0100-0600 16 APR 0100-0600 17 APR 0100-0600 18 APR 0100-0600 19 APR 0100-0600 20 APR 0100-0600 21 APR 0100-0600 22 APR 0100-0600 23 APR 0100-0600 24 APR 0100-0600 2.12 Re-striping on Saturday, 25 Apr 2009, from 0800 hours until 2000 hours. 2.13 Re-striping back-up date is Sunday, 26 Apr 2009, same hours. 2.14 Staging area will be an aircraft parking pad along F Taxiway as directed. 2.15 Coordinate haul route with Construction Management. 3. FALL 2009 DESCRIPTION OF WORK: 3.1 Remove approximately 480,000SF (80' x 6000') of rubber on the runway at locations directed by Construction Management (CECC). 3.2 Re-stripe centerline (white-18,150SF-60.5ea 3'x100' stripes). 3.3 Re-stripe ONLY THE CENTER TWO BAK12 CIRCLES ON EACH END(yellow w/o beads-314SF-4ea 10' diameter circles). 3.4 Re-stripe leadoff taxi-lines (yellow 2,539SF-5,077LF 6"wide) on the runway. Stop all taxi-lines three-foot short of the edge line. 3.5 Total accumulative re-striping of above requirement is 21,003SF. 3.6 The contractor shall provide the locations and amounts (SF) of rubber removed to the Construction Inspector of record (not the escort) by 1000 hours of the day the rubber was removed.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS