Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on March 26, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RECOVERY - Soil Sampling Around Courchesne Bridge along th Rio Grande

Closed
RFP10-29Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541620
New
SLED
ENVIRONMENTAL TRUST Comprehensive E mergency Management Plan Update & Environmental Engineering and Consulting Services
Solicitation # Environmental-Trust_RFP_FY-2027_Emergency-Plan-Update-Environmental-Services_10202026.pdf
The Confederated Tribes of the Colville Reservation is seeking professional services for a combined maximum budget of $289,497, divided into two primary functional areas. The first area, Emergency Management Planning, is capped at $150,000 and involves updating the 2014 Comprehensive Emergency Management Plan, developing Emergency Support Functions, creating hazard-specific annexes, and establishing the Tribes' first Continuity of Operations Plan and Tribal Threat and Hazard Identification and Risk Assessment. This scope also includes the development of an all-hazards tabletop exercise package and the facilitation of coordination workshops to integrate these planning components. The second area, Environmental Engineering and Consulting Services, is capped at $139,497 and focuses on technical field operations in Nespelem, Washington. Key tasks include biannual groundwater monitoring and testing at the Nespelem Post and Pole site, as well as the characterization, removal, and lawful disposal of hazardous materials at the Nespelem Recycle Center. The contractor must adhere to strict quality standards, including the use of approved Quality Assurance Project Plans and Health and Safety Plans, and provide detailed verification reports. Mandatory monthly progress reports are required for all activities, and all project communication costs must be integrated into the respective task budgets. TERO fees are handled separately by the Tribal Employment Rights Office and are not included in the scope of work budget.
Confederated Tribes of the Colville Reservation

POSTED

about 4 hours ago

DEADLINE

in 15 days

AI Contract Overview

Show more

The United States Section of the International Boundary and Water Commission is seeking soil sampling services to support levee reconstruction along the Rio Grande near Sunland Park, New Mexico. Because the project area is located near the McNutt refinery superfund site and the ASARCO refining facility, there is a potential for lead and arsenic contamination in the soil. The selected contractor will be responsible for submitting a sampling plan and Quality Assurance Project Plan, collecting sample borings using a NELAC accredited laboratory, and delivering a detailed final report featuring concentration maps and electronic GIS layers. This opportunity is restricted to existing contractors under specific Environmental Services IDIQ contracts IBM09D0010, IBM09D0011, and IBEM09C0012. The resulting task order will be a firm fixed-price agreement with a performance period of approximately 60 calendar days from the notice to proceed. The work will be performed in the El Paso, Texas region under solicitation RFP10-29.

General Info

Agency

N/A

NAICS

541620 - Environmental Consulting Services

Place of Performance

The site to be sampled is located on both sides of the Rio Grande along the levees and floodplain from the southern point of th, EL PASO, TX, 79902-1441, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

special-notice

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Colleen J. ElliottContracting Officer
Ruben PinoContract Specialist

Full Description

Show more
THIS NOTICEIS PROVIDED FOR INFORMATINAL PURPOSES ONLYU. LTHIS OPPORTUNITY IS AVAILABLE ONLY TO CONTRACTORS UNDER THE ENVIRONMENTAL SERVICES INDENFITE DELIVERY IDEFINITE QUANITY (IDIQ) CONTRACT NUBMERS IBM09D0010 WITH TRC, IBM09D0011 WITH MWH, AND IBEM09C0012 WITH E2M. RECOVERY - The United States Section, International Boundary and Water Commision (USIBWC) will be performing levee reconstruction work on levees located along the Rio Grande river near Sunland Park, New Mexico around the McNutt refinery superfund site to upstream of the Courchesne bridge. The construction will require heavy equipment movement, soil disruption, soil addition, and soil compaction, as well as construction of flood gates along irrigation chanel crossings in this area. This area lies near the ASARCO refining facility and may potentially contain lead and arsenic in the soils. The USIBWC has collected data in this area in the past and needs adiditonal data collectedin locations that were not collected and analyzed previously. The Contractor shall submit a sampling plan and Quaity Assurance Project Plan (QAPP) for the collection and analysis of sample borings. Contractor shall utilize a laboratory that possesses NELAC accredation. Following receipt of laboratory analyses, the contractor shall develop a detailed report on the results of the soil sampling containing maps of actual boring locations, laboratory analysis, and concentration maps to provide to the USIBWC. GIS layers produced for the report shall be submitted electronically to the USIBWC. Project completion is approximately 60 calendar days from notice to proceed. THE RESLTING NEGOTIATED TASK ORDER WILL BE SYNOPSIZED AND ISSUED UNDER ONE OF THE SUCCESSFULLY COMPETED AND EXISTING FIRM FIXED-PRICE MULTIPLE AWARD IDIQ ENVIRONMENTAL SERVICES CONTRACT REFERENCED ABOVE.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS