Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on June 4, 2010. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RECOVERY--Y--PROJECT NUMBER 13818, Illinois River Basin Restoration , IL

Awarded
W912EK-10-R-0029Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 14 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

Midwest Foundation Corporation was awarded contract W912EK-10-C-0069 for the Illinois River Basin Restoration project in Tazewell County, Illinois. The total funding consists of 555,146.61 dollars in Recovery Funds and 277,653.39 dollars in Non-Recovery Funds. This ecosystem restoration effort focuses on the Upper Mid-sized Island Critical Restoration Project Stage II, located between river miles 165.5 and 166.0 of the Illinois Waterway. The scope of work involves using high solids mechanical dredging to clear channels and backwaters to varying depths. The resulting dredged material will be used to construct an island within geotextile containers, supplemented by the installation of riprap for two rock closure structures and seventeen jetties. The contractor is responsible for the separation and removal of common river debris, such as metallic scrap and tires, and must verify navigation access through existing channels.

General Info

Agency

N/A

Contract Value

$832,800

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

IL, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline time changed from 5:00 AM UTC to 9:00 PM UTC on Mar 15, 2010. The notice description changed. The point of contact changed.

Notice updated

Response deadline changed from Mar 15, 2010 to Mar 11, 2010. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
ContactsNo contacts available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Midwest Foundation Corporation, W912EK-10-C-0069, Illinois River Basin Restoration Contract Award Amount equals $555,146.61 Recovery Funds, and $277,653.39 Non-Recovery Funds. Options E and G were exercised under Contract W912EK-10-C-0069 Mod P00002. Channels and backwaters areas of the Illinois River will be dredged using a high solids mechanical dredging methodology to varying depths. The dredged material will be placed inside of three rows of existing geotextile containers to construct an island. An additional row of geotextile containers will be placed on top of the existing geotextile containers and will be filled with dredged material using a high solids mechanical dredging methodology. Riprap will be placed to construct two rock closure structures and seventeen jetties adjacent to the island. During excavation, the contractor should expect to encounter debris such as trees, stumps, snags, metallic scrap, boat parts, tires, rope, cable, and other items that are commonly found in backwater areas of the Illinois River. The Contractor will separate and remove debris from the work site. Access from the navigation channel may be available by a previously dredged channel; however, the Contractor shall verify access requirements. All movement of floating plants may be restricted by shallow water. Peoria Riverfront Development, Illinois (Ecosystem Restoration) Upper Mid-sized Island Critical Restoration Project, Stage II, Illinois Waterway, River Miles 165.5 166.0, Tazewell County, Illinois.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS