This Government Contract opportunity from Department Of Defense was posted on October 28, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RECOVERY--Y--RECOVERY -- Mississippi River and Tributaries, Bonnet Carre Spillway - Paint Spillway Bays #2, St. Charles Parish, LA

Awarded
W912P8-09-B-0073Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
International
2383 Emerson Street - Modular Pump Track - Design-Build Services
Solicitation # RFP 1220-2026-4364
The City of Abbotsford has issued Request for Proposals RFP 1220-2026-4364 for design-build services to create a complete, safe, durable, and fully operational modular pump track facility at 2383 Emerson Street. The project follows a stipulated price contract based on the CCDC 14-2013 Design-Build Agreement. The selected Design-Builder will be responsible for all professional design and engineering services, including the preparation of sealed plans, as well as the provision of all labor, materials, modular pump track units, and site furnishings. Additionally, the contractor must obtain all necessary permits, licenses, and certificates of inspection required by federal, provincial, and local authorities. A mandatory site visit is scheduled for November 9, 2026, at 10:00 AM local time, and attendance is required for proposal submission. The deadline for responses is November 24, 2026, at 10:00 PM. Project acceptance is contingent upon the Consultant and Owner's satisfaction regarding the rectification of deficient work, completion of landscaping and clean-up, and the facility reaching full operational readiness. Payments will be processed via progress payment approvals issued by the City Representative. All work must adhere to the rules and customs of best trade practice and meet the requirements of all governing jurisdictions.
City of Abbotsford

POSTED

about 13 hours ago

DEADLINE

in 25 days

AI Contract Overview

Show more

This contract, awarded by the Department of Defense through the Endist New Orleans office, involves the removal and replacement of paint on non-galvanized steel structural members at the Bonnet Carre Spillway Bays 2 in St. Charles Parish, Louisiana. The scope of work requires the contractor to provide all necessary labor, supervision, equipment, and materials to perform abrasive blasting, water blasting, or chemical stripping, followed by repainting and related incidental tasks. This project is designated as a 100 percent set-aside for Service Disabled Veteran Owned Small Businesses. Due to the nature of the site, work will be performed at heights of 20 to 30 feet, necessitating strict adherence to OSHA fall protection standards and the potential use of scaffolding, cherry-pickers, or scissor lifts. A critical safety consideration is that the existing paint contains lead concentrations of approximately 4500 ppm, requiring appropriate handling and mitigation measures. The project is categorized under NAICS code 237990 and is identified as a recovery project.

General Info

Contract Value

$848,333

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

LA, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice title changed. The notice description changed.

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist New Orleans
ContactsNo contacts available
OfficeNEW ORLEANS, LA, 70118-3651, USA
Office AddressNEW ORLEANS, LA, 70118-3651, USA
ContactsNo contact information available

Full Description

Show more
RECOVERY-- 100% SET ASIDE - SERVICE DISABLED VETERAN OWNED SMALL BUSINESS -- The work to be performed under this project consists of providing the labor, supervision, overhead, tools, equipment, vehicles, transportation, per diem, and materials to remove existing paint (herein referred to as abrasive blasting but including water blasting, mechanical or chemical stripping, chipping, etc, as required) from all non-galvanized steel structural members of the Bonnet Carre Spillway structure, repainting same, and all incidental work as described in the specifications. The work will be performed 20-30 feet above ground level and fall protection in accordance with OSHA requirements (29 CFR 1926 Subpart M) will be required. Scaffolding, cherry-pickers, and/or scissors lifts may be required in order to accomplish the work. NOTE: The existing paint to be removed contains lead small concentrations of lead (approximately 4500 ppm). TAS::96 3113::TAS RECOVERYPROJECT#::323221::RP#

More opportunities from Department Of Defense → W07V Endist New Orleans

Same awarding agency

NAICS: 326199
Federal
Sources Sought for Calcaiseu River Saltwater Barrier FRP Tainter Gate
Solicitation # W912P827SS0001
The US Army Corps of Engineers, New Orleans District, is conducting market research via a sources sought notice for the design, fabrication, and delivery of fiber reinforced polymer FRP Tainter Gates for the Calcasieu River Saltwater Barrier. The requirement consists of a base bid for two gates and an option for three additional gates, totaling five units. These gates must be fully integrated into the existing structure, maintaining interchangeable installation and operation with existing steel gates, including specific bolted connections, seal locations, and machinery lifting connections. The completed gates will be delivered by barge and offloaded at the Calcasieu River Saltwater Barrier and Sector Gate facility, though the USACE will handle the actual installation. The anticipated contract will be a firm-fixed-price, Two-Phase Design Build project under NAICS code 326199, with a small business size standard of 750 employees. The government is seeking capabilities statements of no more than twenty pages to evaluate market capacity, specifically focusing on technical resources, bonding capabilities, and the ability to meet tight program schedules. Interested parties must submit their responses via email to Taylor Brandon and Karen Hargrave by 1:00 PM local time on November 4, 2026. This notice is for informational purposes only and does not constitute a formal solicitation or request for proposal.
All Other Plastics Product Manufacturing

POSTED

15 days ago

DEADLINE

in 4 days
View Details
NAICS: 237990
Federal
Barataria Bay Waterway, Maintenance Dredging, Bar Channel
Solicitation # W912P826BA062
The US Army Corps of Engineers, New Orleans District, is soliciting bids for a firm fixed price contract for maintenance dredging of the Barataria Bay Bar Channel in Jefferson Parish, Louisiana. The scope of work involves the removal of shoal material and its disposal at the Grand Terre Island disposal site, with no dike work required. The project includes the dredging of an estimated 375,000 cubic yards for the primary requirement and an additional 100,000 cubic yards as an optional quantity, along with mobilization, demobilization, and bird nesting avoidance measures. The estimated time for completion is 90 calendar days after the receipt of the notice to proceed. Award will be made to a single bidder based on total price, with a 10 percent evaluation preference applied to HUBZone small business concerns and other successful small businesses. The contractor must adhere to EM 385-1-1 safety standards, the Seagoing Barge Act, and prevailing wage rates specified in General Decision LA20260007. Key deliverables include a preliminary project schedule within 15 days and an initial project schedule within 42 days of the notice to proceed. Final acceptance is contingent upon a formal inspection by the Contracting Officer, requiring 14 days advance notification from the contractor. Payments will be processed electronically through the Wide Area WorkFlow system.
Other Heavy and Civil Engineering Construction

POSTED

about 2 months ago

DEADLINE

in almost 2 years
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS