This Government Contract opportunity from Department Of Defense was posted on August 28, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Contract W911WN-09-B-0004, issued by the U.S. Army Engineer District Pittsburgh, involves the construction of Upper and Lower Guard Walls at the Charleroi Locks and Dam on the Monongahela River in Westmoreland County, Pennsylvania. This ARRA-funded project encompasses a wide range of civil engineering activities, including mobilization, exploratory pile driving to determine rock elevations, excavation, and the installation of metal sheet piling cells. The scope of work further includes the placement of concrete for drilled shafts and precast prestressed structural concrete, the use of steel stressing tendons, and the fabrication of structural metal components.
The project is governed by strict technical specifications regarding concrete production, transport, and quality control, including the use of government-furnished concrete and the operation of the Victory Hollow Disposal Site. Performance is subject to a 730-calendar-day period, with detailed measurement and payment terms utilizing both lump sum and unit price structures. The procurement process involved multiple amendments to refine technical drawings, update wage determinations, and adjust quantities. Bid results indicated a competitive process with five companies submitting proposals ranging from approximately 28.3 million to 36.9 million dollars, falling below the Independent Government Estimate of 43.5 million dollars.
HighAI Summary for Amendment 0001 - W911WN-09-B-0004: Amendment 0001 issued by the U.S. Army Engineer District, Pittsburgh, dated July 1, 2009. The primary purpose of this amendment is to extend the bid due date from July 10, 2009, to July 24, 2009, at 11:00 AM.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 0002 to Solicitation W911WN-09-B-0004: Amendment 0002, dated July 16, 2009, for solicitation W911WN-09-B-0004 issued by the U.S. Army Engineer District, Pittsburgh. The amendment provides responses to questions, revises multiple specification sections (including concrete and structural metal fabrications), updates drawings for the Upper Guard Wall, and incorporates the current Wage Determination (PA080004). The bid submission deadline remains unchanged at 11:00 am on July 24, 2009.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 0004 to Solicitation W911WN-09-B-0004: Amendment 0004 issued on July 27, 2009, by the U.S. Army Engineer District, Pittsburgh. This modification revises specifications and drawings (specifically Section 01 30 00.10 and Drawing 037-LCH-20/UG4), provides responses to technical questions regarding box beam casting and pier cap HS bars, and updates the unit of measure for SUBCLIN 0002AX and 0003BC from Linear Foot to Square Foot. A conformed price schedule is required with bids. The offer receipt date remains July 30, 2009.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 0005 to Solicitation W911WN-09-B-0004: Amendment 0005 issued by the U.S. Army Engineer District, Pittsburgh, dated July 29, 2009. The amendment extends the offer receipt deadline to July 31, 2009, at 11:00 AM and revises quantities for SUBCLIN 0002AX and 0003BC to account for a conversion from linear feet to square feet.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Amendment 0006 to Solicitation W911WN-09-B-0004: Amendment 0006 issued on July 30, 2009, by the U.S. Army Engineer District, Pittsburgh. The amendment revises specification section 01 30 00.10 regarding the conveyor option, provides a clarification on concrete delivery at Points of Delivery, and extends the offer submission deadline to August 3, 2009, at 11:00 AM.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Charleroi Locks and Dam - Section 03 23 00 Steel Stressing Tendons: Technical specifications for steel stressing tendons and accessories for prestressed concrete for the Charleroi Locks and Dam Upper and Lower Guard Walls project. The document details references (ACI, ASTM), submittal requirements for shop drawings and certifications, material standards for seven-wire strands and high-strength steel bars, and installation requirements for prestressing operations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Charleroi Locks and Dam - Section 03 30 00.10 Concrete: General Requirements: Technical specifications for general concrete requirements for the Charleroi Locks and Dam Upper and Lower Guard Walls project. The document outlines submittals, ACI certifications for quality control personnel, government-furnished concrete arrangements, and coordination requirements for production and delivery. It references ACI 117 for tolerances and includes requirements for concrete plans and pre-construction meetings.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Charleroi Locks and Dam - Upper and Lower Guard Walls - Section 01 30 00.10: Technical specifications section 01 30 00.10 (General Requirements) for the Charleroi Locks and Dam Upper and Lower Guard Walls project (Contract W911WN-09-B-0004). This document, revised by Amendment No. 0002, outlines general requirements, definitions, submittal requirements (including plans for equipment withdrawal and water craft operations), and guidelines for contract and reference drawings.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Charleroi Locks and Dam - Upper and Lower Guard Walls: Section 01 30 00.10 General Requirements: This document is Section 01 30 00.10 (General Requirements) for the Charleroi Locks and Dam - Upper and Lower Guard Walls project (Contract W911WN-09-B-0004), revised by Amendment No. 0004. It outlines general project requirements, definitions, references (PDT 408 and USACE EM 385-1-1), submittal requirements (including preconstruction plans and shop drawings), and guidelines for contract and reference drawings. It also details site access, work area restrictions, and coordination with lock and dam operations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Charleroi Upper and Lower Guard Walls - Table B: Technical data table (Table B) for the Upper Pool of Monongahela River Locks and Dam 4. It provides exceedence durations for velocities up to 5 feet per second and corresponding discharge rates across different months at two specific locations upstream of the dam.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Charleroi Upper and Lower Guard Walls - Table D: Technical data table (Table D) for the Lower Pool of Monongahela River Locks and Dam 4, detailing exceedence durations for various velocities and discharges at the end of the guard wall, including monthly percentage data and computed mean velocities.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Charlieroi Locks and Dam - Exploratory Pile Driving (Section 02 32 13.12): Technical specifications for exploratory pile driving for the Charlieroi Locks and Dam Upper and Lower Guard Walls project (Contract W911WN-09-B-0004). The document outlines the purpose, methodology, and sequence of work to determine rock elevations for accurate sheet pile ordering, including submittal requirements for equipment and test reports, and quality control procedures.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Charlieroi Locks and Dam - Operation of Disposal Site (Section 01 74 19.10): Technical specifications for the operation of the Government-furnished disposal site (Victory Hollow Disposal Site) for the Charlieroi Locks and Dam project. The document details requirements for erosion and sediment controls, clearing, haul road maintenance, traffic control, and submittal requirements. This version is revised by Amendment No. 0003 for contract W911WN-09-B-0004.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Charlieroi Locks and Dam - Section 01 22 00.00 10 Measurement and Payment: Technical specification section 01 22 00.00 10 for the Charlieroi Locks and Dam - Upper and Lower Guard Walls project (Contract W911WN-09-B-0004, Revised by Amendment No. 0003). This document defines the measurement and payment terms for various contract items, including lump sum payments for mobilization, project scheduling, demolition, and concrete testing lab repairs, as well as unit price items for sampling and pile driving.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Charlieroi Locks and Dam - Section 01 52 13.20 Government Facilities: Technical specifications section 01 52 13.20 for the Charlieroi Locks and Dam project (Contract W911WN-09-B-0004), revised by Amendment 0002. It outlines the Contractor's responsibilities for the maintenance and operation of Government field offices, concrete laboratories, and utilities (water, electric, telephone, and internet) on both the right and left banks.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Charlieroi Locks and Dam - Section 02 32 13.12 Exploratory Pile Driving: Technical specifications for exploratory pile driving for the Charlieroi Locks and Dam Upper and Lower Guard Walls project (Contract W911WN-09-B-0004, Revised by Amendment 0002). The document outlines the purpose, methodology, and sequence of work to determine rock elevations for accurate pile ordering, as well as requirements for equipment, submittals, and quality control.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Charlieroi Locks and Dam - Section 02 42 00 Disposal of Materials: Technical specification section 02 42 00 for the Charlieroi Locks and Dam Upper and Lower Guard Walls project. It outlines requirements for the disposal of materials, including soil, rock, solid waste, and hazardous waste. Key components include submittal requirements for work plans, waste manifests, dust control measures, and compliance with PADEP, OSHA, and USACE (EM 385-1-1) regulations.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Charlieroi Locks and Dam - Section 03 30 00.20 Concrete: Field Demonstrations: Technical specifications for concrete field demonstrations for the Charlieroi Locks and Dam Upper and Lower Guard Walls project (Contract W911WN-09-B-0004, Revised by Amendment 0002). The document outlines requirements for demonstration drilled shafts, construction methods, testing requirements, and necessary submittals to verify that work will be performed in an acceptable manner.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Charlieroi Locks and Dam - Section 03 30 00.50 Concrete: Production and Transport: Technical specifications for the production and transport of government-furnished concrete for the Charlieroi Locks and Dam Upper and Lower Guard Walls project. The document details requirements for concrete delivery points, transporting equipment (including transfer hoppers and belt conveyors), and submittal procedures for conveying equipment. It includes references to ASTM and PCI standards and notes revisions by Amendment No. 0002.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Charlieroi Locks and Dam - Section 03 30 00.60 Concrete Placement Requirements: Technical specifications for concrete placement requirements for the Charlieroi Locks and Dam Upper and Lower Guard Walls project (Contract W911WN-09-B-0004, Revised by Amendment No. 0002). The document details general requirements, submittals, product standards for epoxy grout and curing materials, and execution procedures including preparation, placing, temperature control, and quality control testing.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Charlieroi Locks and Dam - Section 03 31 23 Concrete: Drilled Shafts: Technical specifications for the conveying and placing of drilled shaft concrete for the Charlieroi Locks and Dam Upper and Lower Guard Walls project. The document details submittal requirements, material standards (ASTM), concrete mixture proportions, and execution procedures including Crosshole Sonic Logging (CSL) testing. This version is associated with contract W911WN-09-B-0004 and was revised by Amendment No. 0002.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Charlieroi Locks and Dam - Section 05 50 14 Structural Metal Fabrications: Technical specifications for structural metal fabrications for the Charlieroi Locks and Dam Upper and Lower Guard Walls project (Contract W911WN-09-B-0004). The document details material requirements, fabrication standards, welding qualifications (AWS/ASME), submittal requirements (SD-02 through SD-07), and installation procedures for steel and aluminum components.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Charlieroi Locks and Dam - Upper Guard Wall Specifications: Technical specifications for the construction of the Upper Guard Wall at Charlieroi Locks and Dam (Contract W911WN-09-B-0004, Revised by Amendment 0002). The document details requirements for concrete-filled sheet piling cells, drilled shafts, precast beams, and materials such as elastomeric bearing pads and grout, including specific ASTM and AASHTO standards and submittal requirements for construction plans.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Charlieroi Upper and Lower Guard Walls - Table E: Technical data table (Table E) regarding Lower Pool exceedence duration and discharge values (cfs) relative to pool elevation for the Charlieroi Upper and Lower Guard Walls project.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Conformed Price Schedule - 72809: This document is a conformed price schedule (Section 00010 - Solicitation Contract Form) detailing Firm Fixed Price (FFP) line items for a construction project. It includes detailed CLINs for general requirements, Upper Guard Wall, and Lower Guard Wall construction, covering activities such as mobilization, exploratory drilling, concrete placement, and reinforcing steel.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for Conformed Price Schedule - Amendment 0004: This document is a conformed price schedule associated with Amendment 0004. It contains detailed CLIN and SubCLIN structures for ARRA-funded construction projects, specifically covering General Requirements, Upper Guard Wall, and Lower Guard Wall activities. It includes quantities and units for items such as excavation, drilling, concrete placement, and reinforcing steel.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Conformed Price Schedule - ARRA Guard Wall Construction: This document is a conformed price schedule (Section 00010 - Solicitation Contract Form) detailing CLINs and SubCLINs for ARRA-funded construction. It includes pricing line items for general requirements, upper guard wall, and lower guard wall, covering activities such as mobilization, drilling, excavation, concrete placement, and reinforcing steel.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Conformed Price Schedule - ARRA Guard Wall Construction: A detailed conformed price schedule/CLIN structure for a construction project involving Upper and Lower Guard Walls. The document specifies Firm Fixed Price (FFP) line items for general requirements, exploratory drilling, excavation, concrete placement, and reinforcing steel, including specific quantities and units of measure.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Gate Operating Schedules: Technical document detailing regular and construction-phase gate operation schedules, including river discharge rates, pool elevations, and gate opening specifications. It specifically outlines the modified schedule to be used during river wall construction to manage velocities and eddies.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 22 00.00 10 - Measurement and Payment (W911WN-09-B-0004): This document is a technical specification section titled 'Measurement and Payment' for the Charleroi Locks and Dam - Upper and Lower Guard Walls project (Contract W911WN-09-B-0004), revised by Amendment No. 0002. It defines the payment terms, units of measure, and specific payment items for both lump sum and unit price tasks, including mobilization, project scheduling, demolition, and exploratory pile driving.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 Table A - Charlieroi Upper and Lower Guard Walls: Technical data table providing significant stage-discharge-duration relationships for the Upper Pool of the Monongahela River Locks and Dam 4, based on flow records from 1940-98.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 03 45 33 - Precast Prestressed Structural Concrete: Technical specifications for precast prestressed structural concrete for the Charlieroi Locks and Dam - Upper and Lower Guard Walls project (Contract W911WN-09-B-0004, Amendment 0002). The document details references (ACI, AWS, ASTM, PDT, PCI, USACE), material requirements, production quality control, curing, and submittal requirements for precast members.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 31 41 16 - Metal Sheet Piling (Charleroi Locks and Dam): Technical specifications for Metal Sheet Piling for the Charleroi Locks and Dam - Upper and Lower Guard Walls project (Contract W911WN-09-B-0004). This document, revised by Amendment No. 0003, details requirements for materials, submittals (shop drawings, product data, test reports), delivery, quality assurance, and execution/installation of sheet piling, including references to ASTM and USACE standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 31 41 16 - Metal Sheet Piling (Charleroi Locks and Dam): Technical specifications for Metal Sheet Piling for the Charleroi Locks and Dam - Upper and Lower Guard Walls project (Contract W911WN-09-B-0004). The document details requirements for materials, submittals (shop drawings, product data, test reports), delivery, storage, quality assurance, and installation procedures for sheet piling, including references to ASTM and AWS standards.
PDF
PDF, High priority: read this firstifb
HighAI Summary for Solicitation W911WN-09-B-0004: Charterro Upper and Lower Guard Walls: Sealed bid solicitation (IFB) issued on June 10, 2009, by the U.S. Army Engineer District, Pittsburgh. The project involves the construction of Charterro Upper and Lower Guard Walls on the Monongahela River in Westmoreland County, Pennsylvania. The document includes submission deadlines (July 10, 2009), performance period requirements (730 calendar days), bonding requirements, and a detailed schedule of prices/CLINs for general requirements and wall construction.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Table C: Lower Pool Stage-Discharge-Duration Relationships - Monongahela River Locks and Dam 4: Technical data table providing significant stage-discharge-duration relationships for the Lower Pool at Monongahela River Locks and Dam 4, based on flow records from 1940-1998. It details the average percentage of time specific pool elevations and corresponding discharges are exceeded across different months and annually.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for W911WN-09-B-0004 Amendment 0003: Amendment 0003 to solicitation W911WN-09-B-0004, issued by the U.S. Army Engineer District, Pittsburgh, effective July 22, 2009. This amendment revises several specification sections (Measurement and Payment, General Requirements, Exploratory Pile Driving, Disposal of Materials, and Metal Sheet Piling), provides answers to eight technical questions, updates multiple drawings, extends the response deadline to July 30, 2009, and adds full text for clause 52.245-2.
DOC
DOC, Low priorityaward
LowAI Summary for Bid Results: W911WN-09-B-0004 Charleroi Upper and Lower Guard Walls: A bid results summary for contract W911WN-09-B-0004 regarding the Charleroi Upper and Lower Guard Walls. The document lists five bidding companies and their respective bid amounts, ranging from $28,365,517.30 to $36,990,800.00, and provides the Independent Government Estimate of $43,529,885.00.
DOC
DOC, Low priority2 pages · attendance-register
LowAI Summary for Charleroi Upper and Lower Guard Walls Pre-Bid Site Visit Attendance Register: Attendance register for the pre-bid site visit held on June 24, 2009, regarding Solicitation No. W911WN-09-B-0004 for the Charleroi Upper and Lower Guard Walls. The document lists representatives from various contracting firms and USACE Pittsburgh District participants.
ZIP
ZIP
AI Contract Breakdown
Uniform Contract Format
Contract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
12 updates
PhaseAwarded
Posted
Presolicitation
Notice updated
Response deadline changed from Aug 9, 2009 to Jul 10, 2009. The notice description changed. The point of contact changed.
Notice updated
The notice description changed.
Notice updated
Notice details unchanged. Attachments may have changed.
Notice updated
Response deadline changed from Jul 10, 2009 to Jul 24, 2009. The notice description changed.
Notice updated
NAICS code changed from 237990 to 238990.
Notice updated
The notice description changed.
Deadline changed
Response deadline changed from Jul 24, 2009 to Jul 30, 2009.
Notice updated
The notice description changed.
Notice updated
The notice description changed.
Notice updated
Response deadline changed from Jul 30, 2009 to Jul 31, 2009. The notice description changed.
Notice updated
Response deadline changed from Jul 31, 2009 to Aug 3, 2009. The notice description changed.
Notice updated
The notice description changed.
Type Changed
Presolicitation → Solicitation
Awarded
Contract was awarded
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
Organization & Contact Information
Show more
AgencyDepartment Of Defense → W072 Endist Pittsburgh
The US Army Corps pf Engineers, Pittsburgh District, has a project that involves the construction of the Upper and Lower Guard Walls at Charleroi Locks and Dam, Monongahela River, PA. The major features of the contract are identified below: The 425 foot long lower guard wall consists of drilled shafts, pre-cast shells over the drilled shafts, pre-cast wall panels, a pre-cast cap beam, infill concrete, a sheet pile cut off wall, and four flow diversion cells. There are 13 each 9-6 diameter concrete reinforced drilled shafts that are advanced through approximately 20 feet of river bottom overburden and penetrate approximately 25 feet into bedrock. Each drilled shaft is encased with a reinforced pre-cast concrete enclosure. Pre-cast wall panels are attached to the shaft enclosure to create the lock wall face. A pre-cast cap beam is installed to create the top surface oft the wall; the cap beam is infilled with concrete. At the downstream end of the wall is a nose cell consisting of a steel shell placed over two of the drilled shafts and infilled with concrete. The flow diversion cells are 30 foot diameter gravel filled and concrete capped sheet pile cells that are installed riverward of the nose pier. The 800 foot long upper guard wall consists of 6 concrete piers, and 6 pre-cast box beam sections as well as a nose cell. Each pier consists of a 2 each 66 diameter concrete reinforced drilled shafts and a pre-cast cap beam and a cast in place thrust block. The drilled shafts are advanced through approximately 30 feet of river bottom overburden and penetrate approximately 20 feet into rock. Between each pier, there is a 10 wide by 10 deep by 110 foot long hollow prestressed concrete box beam; there are a total of six box beams included in the contract. Other features of the upper guard wall include a sheet pile cut-off wall and a 50 foot diameter concrete filled nose cell. Concrete for drilled shafts and infill concrete will be Government furnished material. Sheet pile for the cells and the cut-off walls will be Government furnished material. The contract will include minimal electrical work comprised of conduit and pull boxes for each of the guard walls. Contract will include a minimal amount of excavation for the construction of the walls and nose cells. Excavated material will be transported to and disposed of at the Government facility located approximately 7.3 river miles downstream. The magnitude of the project is between $25,000,000 and $100,000,000. This procurement will be advertised on an unrestricted basis. The Invitation for Bid (IFB) will be issued approximately June 8, 2009 on-line only through the Federal Business Opportunities website; therefore, requests for hardcopies of the specifications and drawings will not be honored. Requests must be made by registering for this solicitation at http://www.fedbizopps.gov. Once registered, vendors, plan rooms and printing companies will be able to download the solicitation and drawings on or after the above issuance date. For additional contracting opportunities go to the Army Single Face to Industry website at https://acquisition.army.mil/asfi/, click on Contracting Opportunities and follow the directions or go to http://www.fedbizopps.gov, click on Go Find Business Opportunities and follow the directions.
More opportunities from Department Of Defense → W072 Endist Pittsburgh