Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on November 20, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

RECOVERY Y--Stimulus Recovery Act Project:Replace Mechanical Room Floor R526-115-02 CONSTRUCTION

Awarded
VA-243-09-RA-0223Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238120
New
International
Provision of Structural Repairs and Planned Maintenance to Blackpool Tower Winter 2026/7 and Summer 2027
Solicitation # ocds-h6vhtk-078f6c
Blackpool Borough Council is seeking a qualified Remedial Works Supplier to provide structural repairs and planned maintenance for Blackpool Tower, with an estimated total value of 4,000,000 GBP including VAT. The project is divided into three phases: a Winter Works package from November 2026 to March 2027 during operational closure, a Summer Works package from April 2027 to November 2027 during the operating season, and ongoing ad-hoc maintenance beyond November 2027 based on annual surveys. The initial period of performance runs from November 30, 2026, to November 29, 2027, with a possible one-year extension to November 29, 2028. The contract is an open competition with award criteria weighted at 50 percent Quality, 40 percent Price, and 10 percent Social Value. Mandatory requirements include IRATA level 3 qualified supervisors, IRATA level 1 or 2 technicians, and project managers who are Chartered Members of the Institution of Civil Engineers or Institution of Structural Engineers. Suppliers must maintain insurance coverage of 10 million GBP for Employer's Liability and Public Liability, and 5 million GBP for Professional Indemnity. All work must adhere to strict technical and safety standards, including BS EN 1090 Execution Class 3 for steel structures, CDM 2015, and the Work at Height Regulations 2005. The deadline for tender submissions is November 20, 2026.
Blackpool Borough Council

POSTED

1 day ago

DEADLINE

in 21 days

AI Contract Overview

Show more

Project 526-08-115 involves the replacement of the structural floor and equipment pads for the chiller plant located on the first floor of building 101 at the James J. Peters VA Medical Center in Bronx, New York. This Service Disabled Veteran Owned Small Business Set-Aside project, classified under NAICS Code 238120, has an estimated cost range between 1.5 million and 3 million dollars. The scope of work requires the contractor to disconnect, remove, store, and reinstall all electrical and mechanical equipment, including high-voltage units and various piping systems, after the new structural slab is installed. Additionally, a secondary floor area must be ground down and resurfaced. The contractor is responsible for providing temporary cooling capacity of approximately 2200 tons of chilled water, with work ideally scheduled between November 1 and April 1 to minimize cooling needs. Requirements include providing construction lighting, temporary passage doors, and fire safety equipment in compliance with NYS Building Code and VA Life Safety Codes. Bidders must be registered in CCR, VetBiz, and ORCA, and must submit hardcopy bids with necessary bonding. All site debris removal and adherence to VA rules and regulations are the responsibility of the contractor.

General Info

Agency

N/A

Contract Value

$1,260,000

NAICS

238120 - Structural Steel and Precast Concrete Contractors

Place of Performance

NY, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Notice updated

Response deadline changed from Jun 22, 2009 to Sep 21, 2009. The notice description changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
ContactsNo contacts available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
The notice for this project No: 526-08-115, Replace Boiler Plant Floor at the JJP Bronx VAMC. This shall be a Service Disabled Veteran Owned Small Business Set-Aside (SDVOSB). As a result all SDVOSB's may submit a bid, which shall be considered by this agency. This project is classified under the NAICS Code 238120 and has a size standard of $14 Million. The Cost Estimate Range for this project is between$1,500,000.00 and $3,000,000.00. Scope of Project consists of, but is not limited to: The scope of this project is the replacement of the structural floor for the chiller plant located on the first floor of building 101 at the James J. Peters V.A. Medical Center, 130 W. Kingsbridge Road, Bronx, NY 10468. The contractor will be responsible for the removal and replacement of the existing Chiller Plant 1st floor slab and all equipment pads. The equipment currently supported by this floor will be disconnected electrically and mechanically and removed, stored and reinstalled upon replacement of the structural slab. Work includes the disconnect of chilled water pipes, condenser water pipes, electrical connections(including 4160V and 480V units), steam pipes, gas pipes, control wiring, compressed air lines and exhaust breeching. The contractor will be required to store all equipment in a safe location and reinstall after the installation of the new structural slab. A secondary floor area will be ground down and a new surface applied. The contractor will be required to provide construction lighting, temporary passage doors, shields for sprinkler heads, temporary fire alarm horn/strobes and emergency lighting in compliance with NYS Building Code and VA Life Safety Codes. The contractor will be responsible for providing temporary chillers to provide cooling for the duration of the project. It is estimated the work will be conducted during the winter months between November 1 and April 1 to minimize the cooling requirements. It is estimated the temporary chiller capacity at 2200 tons of chilled water. The contractor can determine the exact make-up of the temporary plant. The temporary chillers can utilize the existing chilled water pumps and condenser water pumps. The contractor will be responsible for removal of all debris from the site and compliance with all VA rules and regulations All other details and information shall be contained in the solicitation which shall be posted on www.fedbizopps.gov. The solicitation will be released on or around July 23, 2009. The Bid submittal address, date and time will be included in the solicitation. This project requires bonding and all bid submissions shall be in hardcopies; faxed or e-mailed bids WILL NOT BE ACCEPTED. All bidders must be registered in www.ccr.gov, www.vetbiz.gov, and www.orca.bpn.gov. ----END OF DESCRIPTION-----

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS