Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on August 21, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Recreation Building Ceiling Installation

Awarded
69590Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Recreation Building Ceiling Installation project in Greenville, Kentucky, involves extensive ceiling renovations within Building 1407. The scope of work includes removing old ceilings in the main recreation area and bathrooms, installing approximately 472 square feet of new drywall, and installing a 6,000 square foot fire-rated suspended acoustic ceiling with insulation. Additional requirements include installing new ductwork, updating light fixtures with T-5 ballasts, and modifying the fire alarm system to meet current codes. All new drywall must be primed and painted using low VOC paints, with touch-up painting required to restore walls to their original condition. The contractor is responsible for all material storage and the proper disposal of construction debris. Upon completion, the contractor must provide a warranty, two copies of the Operations and Maintenance Manual, and training for the maintenance staff. Furthermore, the contractor must supply the maintenance department with an extra 10 percent of the installed ceiling tiles and one gallon of each paint, enamel, and sealer used, including the corresponding tinting formulas and vendor information.

General Info

Agency

N/A

Contract Value

$16,475

NAICS

238390 - Other Building Finishing Contractors

Place of Performance

Muhlenberg Job Corp Center 3875 State Route Highway 181 North, GREENVILLE, KY, 42345, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Response deadline time changed from 10:00 PM UTC to 11:00 PM UTC on Jun 24, 2009. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Glen EmbryDirector of Administration

Full Description

Show more
There will be a pre- bid walkthrough on June 22, 2009 at 10:30 central time. Bulding 1407: Remove 256 SF of old ceiling in the main recreation area and 216 SF in the male and female bathrooms. Install drywall type ceiling the main recreation area and the male and female bathrooms approximately 472 SF. Install a suspended acoustic ceiling tile under the existing gypsum board ceiling at a level of 10 feet high from the floor. Area covers approximately 6,000 SF. Install insulation above the suspended ceiling in an area of approximately 6,000 SF Install new ductwork connecting to existing ductworks, with the same amount and same placement within the 6,000 SF areas. Remove and reattached existing fire alarm system at the level of the new ceiling meet fire code requirements. Install new light fixtures with T-5 ballasts. Paint all new drywall ceiling to color chosen by center with one primer coat applied prior to paint being applied. Newly installed ceiling tile is required to be fire rated type tile and an extra 10% to be supplied to the maintenance department with name, type, color and location that tile was purchased. Contractor is responsible for any storage requirements for materials during the project. Contractor is responsible for the removal of construction debris from the Center and proper disposition of these items in a land fill or recycling whenever possible. Contractor is responsible for provided warranty (Warranty will not begin until work is accepted from the contractor by the Center) for both units and training of the Maintenance staff on the equipment (Contractor will deliver two (2) copies of the Operations and Maintenance Manual to the Center at the time of training). Touch up painting required to return the walls to the existing condition prior to the removal and installment of new ceilings is the responsibility of the Contractor. Low VOC emitting paints and enamels will be used to ceiling. Contractor will provide one gallon of each paint, enamel, sealer to the Maintenance Department along with any tinting formulas used and the vendor where the paints/stains were mixed.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS