Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on February 22, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Recreation Center Rebuild Project RFP

Closed
d4994State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific performance area in Riverside or Los Angeles, is designated as a set-aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation. The solicitation was posted on October 27, 2026, with a response deadline of November 4, 2026. To secure project financing, bidders must strictly adhere to Disadvantaged Business Enterprise Good Faith Effort (GFE) requirements. Bids will be deemed non-responsive if they fail to include proof of GFE #2, requiring solicitations to be posted in an online publication for 30 consecutive calendar days and in a print newspaper for one day prior to the bid opening. Additionally, proof of utilizing the Small Business Administration (SBA) and Minority Business Development Agency (MBDA) per GFE #5 must be submitted with the bid package. Documentation for outreach efforts under GFE #1 may be submitted up to three business days after the bid closing. Prime contractors are further required to flow down these GFE requirements to any subcontractors they award.
RT CONTRACTOR CORP

POSTED

about 8 hours ago

DEADLINE

in 7 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring shallow foundations, a metal standing seam roof, and exterior walls composed of masonry and metal panels. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option includes the construction of a 17,978 square foot laboratory facility and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 8 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is a request for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that impacted the first, second, and third floors, including dormitories, offices, and medical areas. The scope of work involves comprehensive architectural repairs, including the replacement of drywall, painting, ceiling tiles, flooring, and rubber wall bases, as well as electrical and plumbing restoration to return the facility to its original condition. The total period of performance is 105 days, with substantial completion required within 90 days and final completion within an additional 15 days. This is an SBA set-aside opportunity open to small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Award will be based on best value, with evaluation weights assigned to price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit on November 3, 2026, and submit proposals by November 17, 2026. Requirements include a valid Massachusetts Contractor's License, compliance with NFPA-101 Life Safety Code, OSHA, EPA, and ADA regulations, and adherence to Davis-Bacon Act wage determinations. Contractors must provide a one-year workmanship guarantee and a 20-year product warranty for Luxury Vinyl Plank flooring.
Grafton Job Corps

POSTED

about 8 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. Site preparation involves rock excavation, grading, and mitigation for impacted wetlands, as well as the installation of access roads, paving, and telecommunications infrastructure. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 8 hours ago

DEADLINE

in 3 days

General Info

Documents

1

CIP 301-678: Foster City Recreation Center Rebuild Project RFQ

PDF, High priority: read this firstrfq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Foster City
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

More opportunities from California → City of Foster City

Same awarding agency

NAICS: 236116
New
SLED
Multifamily Residential Rental Development NOFA 2026-2027
Solicitation # 20261022081
The City of Foster City is soliciting applications for the 2026-2027 Multifamily Residential Rental Development NOFA to provide construction and permanent financing loans for affordable multifamily rental housing. Eligible projects include new developments of 10 or more units, expansions of existing developments resulting in 10 or more units, or ADU projects of 10 or more units. To qualify, projects must be either 100% affordable or market-rate with at least 20% below market rate units, with specific allocations for moderate, low, and very low income levels. All awarded projects must ensure affordability for at least 55 years from the date of the Certificate of Occupancy and comply with Foster City Municipal Code Chapter 17.90 and Uniform Multifamily Regulations. The selection process is conducted on a rolling basis with a response deadline of December 31, 2027, provided funding remains available. Applicants must first submit a preliminary online application at least 10 business days before submitting a final written application via email to [email hidden]. Awards are based on a scoring system requiring a minimum total score of 86 points, consisting of at least 70 base points and 16 unit points. Evaluation factors include entity type, with a preference for nonprofits, the number of units, and affordability levels. Qualified applicants who meet the minimum scoring thresholds will be invited to an interview before final recommendations are made to the City Council. Key administrative requirements include the submission of insurance certificates and adherence to prevailing wage laws for construction work. Financial guidelines specify a minimum annual replacement reserve deposit of 500 dollars per unit if the initial deposit is less than 50% of the 15-year Property Needs Assessment cost, and an annual asset management fee capped at 1,000 dollars per unit or 25,000 dollars per year. The primary point of contact for this solicitation is Nori Jabba, Housing and Sustainability Manager within the Community Development Department.
New Multifamily Housing Construction (except For-Sale Builders)

POSTED

5 days ago

DEADLINE

in 2 months
View Details
NAICS: 561730
New
SLED
Willow Tree Pruning
Solicitation # 2026
The City of Foster City is soliciting bids for the annual pruning of willow trees located in city parks and on city-owned property along public paths. The scope of work includes structural pruning, raising crowns for vertical clearance with a minimum live crown ratio of 66 percent, cleaning crowns of dead or diseased branches, reducing crown height or spread, and restoring previously damaged trees. The contractor is responsible for providing all necessary staff, materials, and equipment, and must adhere to strict prohibitions against lion tailing and the freefall of branches. Daily site cleanup is required, and the contractor must coordinate a pruning schedule with city staff at least 72 hours in advance. The project requires strict adherence to CALOSHA safety standards and the State of California Department of Transportation Manual of Traffic Controls for public safety and traffic management. The successful bidder must comply with all applicable prevailing wage laws and post the required wage rates at the work sites. Bids must be submitted by November 13, 2026, and include a completed Bid Response Form covering contact information, licenses, and any exceptions to the agreement terms. The primary point of contact for this solicitation is Park Supervisor Garrett Gotthardt. Work is specified for several locations, including Boothbay, Port Royal, Edgewater, Gateshead, and Sea Cloud.
Landscaping Services

POSTED

5 days ago

DEADLINE

in 17 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS