Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Redwood Life Precise Plan

Forecast
2025081015State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Redwood City

Place of Performance

Island Drive/Marine Parkway, Island Drive/Bridge Parkway, Redwood City, CA, 94065

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more

Interested Companies (1)

David J. Powers & AssociatesSan Jose, CA

Full Description

Show more
The project includes repeal of the existing Westport Specific Plan and the adoption of the new Precise Plan to replace it. The project is consistent with the property’s General Plan land use designation. However, in order to establish the new Precise Plan, the property would be rezoned to precise plan zoning. The project applicant proposes to demolish the existing 20 life science buildings and associated surface parking in order to construct 11 life science buildings totaling approximately 2.731 million square feet (a net increase of 1.764 million square feet compared to existing conditions), an approximately 20,000 square-foot community amenity center within one of the life science buildings, an approximately 104-room hotel, and four parking garages. The life science buildings would range from five- to six-stories tall with a maximum roof height of approximately 100 feet (and approximately 120 feet to the top of the mechanical equipment screening). The hotel would be five-stories tall, with a maximum roof height of approximately 85 feet (and approximately 95 feet to the top of the mechanical equipment screening). The life science and hotel buildings would also include signage on the outside. The parking garages would be five- to eight-levels tall, with a maximum height of approximately 77 feet. The project proposes a total of approximately 42.4-acres of open space throughout the project site, including 38.7-acres of privately-owned, publicly-accessible (POPA) open space. The project also proposes to construct sea-level rise improvements along the existing levee on Belmont Slough and will construct new infrastructure and utility improvements on- and off-site. Vehicular access to the project site would be provided via the Bridge Parkway and Marine Parkway, Island Drive and Marine Parkway, and the Bridge Parkway and Shell Parkway intersections. The project would construct several new public, internal roadways to distribute traffic and facilitate circulation throughout the project site. The project includes design features and contributions towards the community benefits such as affordable housing, sea-level rise resiliency, transportation demand management program, open space, community amenity center, sustainability, childcare, union labor, and bay trail gap improvements.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 10 hours ago

DEADLINE

in 23 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS