Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on May 7, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Redwood Road MPM 2.3

Closed
RDS 25-27State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Contract FDC-214-102565.1, issued by the Commonwealth of Pennsylvania Department of Conservation and Natural Resources, involves the Phase 1 removal of a concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County. The scope of work includes the installation and removal of erosion and sediment control measures, implementation of a traffic control plan, stripping and stockpiling of topsoil, surface water control, and the excavation and placement of select fill. The project concludes with topsoil placement and seeding of all disturbed areas to restore the site to its original condition. The engineer's estimate for this project exceeds 1 million dollars. The contract mandates strict adherence to Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals of 19 percent and 3 percent, respectively. Bidders must provide a lump sum bid and are required to secure performance and material and labor payment bonds at 100 percent of the contract amount, as well as a maintenance bond at 50 percent. Technical compliance is governed by the General Conditions for Construction 2022 Edition and various ASTM standards for soil compaction and classification. Payments will be processed via Automated Clearing House (ACH) through the Commonwealth's procurement system.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 8 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 9 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The Redwood Road MPM 2.3 project involves constructing a 56-foot-long soldier pile retaining wall designed to stabilize a steep slope and prevent future landslides along Redwood Road. The work includes the installation of stitch piles at both ends of the retaining wall, with five stitch piles on each side and an additional 20 stitch piers along a 40-foot section on the north side of the road adjacent to the creek bank. The stitch piers are 18 inches in diameter, spaced 24 inches on center, and positioned just inside the existing paved area, with their tops set two feet below the new pavement surface. The soldier piles are structural steel embedded in 24-inch diameter holes filled with lean concrete and spaced 8 feet apart, with precast concrete lagging placed between them and a reinforced concrete cap cast in place on top. This solicitation, posted by the Public Works agency of California and managed through the Napa office, is open for bid until June 2, 2026. It is designated for state and local government entities (SLED) and offers no set-asides. Interested contractors can expect to address a comprehensive retaining wall system aimed at improving road safety and slope stability, with all technical aspects focused on durable and precise structural reinforcement. The point of contact for inquiries is James Reese, an associate engineer reachable via phone or email.

General Info

Construct 56-foot soldier pile retaining wall with stitch piles to stabilize Redwood Road slope.

Documents

19

Figure 3: Land Coverage and Impacts - Redwood Rd MPM 2.3

PDF, High priority: read this first1 page · specifications
High

Geotechnical Investigation Report for Retaining Wall and Stitch Piers, Napa CA

PDF, High priority: read this first23 pages · geotech-report
High

Invitation for Bids Redwood Road MPM 2.3 RDS 25-27

PDF, High priority: read this first56 pages · ifb
High

NAP-62412 Redwood Road MPM2.3 Slide Repair Application

PDF, High priority: read this first25 pages · application
High

Napa County Bid Bond Form

PDF, High priority: read this first2 pages · bid-bond-form
High

Napa County Construction Contract Agreement TBD

DOCX, High priority: read this first3 pages · contract-document
High

Napa County Performance and Labor Material Bonds

DOCX, High priority: read this first2 pages · bond-document
High

RDS 25-27 Stitch Pile Project Plans IFB

PDF, High priority: read this first21 pages · ifb
High

Redwood Road MPM 2.3 Plans Addendum #1

PDF, High priority: read this firstspecifications
High

Redwood Road MPM 2.3 (RDS 25-27) Invitation for Bids

PDF, High priority: read this firstifb
High

Redwood Road MPM2.3 Slide Repair Avoidance and Minimization Measures

DOCX, High priority: read this first8 pages · sow
High

Redwood Road Slide Repair 401 Water Quality Certification Application

PDF, High priority: read this first4 pages · application-401-certification
High

Redwood Road Specs Addendum #1 - 2025 Storm Slide Repair

PDF, High priority: read this firstspecifications
High

Redwood Road Storm Slide Repair Technical Specifications IFB

PDF, High priority: read this first90 pages · specifications
High

EPIMS Responses to 62412 Redwood Road MPM2.3 Slide Repair Incomplete Letter

XLSX, Low priority8 pages · response-to-incomplete-letter
Low

Notice of Applicability for Redwood Road MPM 2.3 Stitch Pile Project

PDF, Low priority7 pages · notice-of-applicability
Low

Notification of Lake or Streambed Alteration EPIMS-NAP-62412-R3 Redwood Road Slide Repair

PDF, Low priority2 pages · notification
Low

Redwood Road Slide Repair CEQA Compliance Memo Nov 2025

DOCX, Low priority4 pages · determination-and-findings
Low

Supplementary Information for Section 401 Water Quality Certification Redwood Road MPM 2.3 Repair

PDF, Low priority17 pages · supplementary-information
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Public Works
Contacts1 person available
OfficeNapa, CA, 94559, USA
Organization / AgencyCalifornia → Public Works
Office AddressNapa, CA, 94559, USA
Contacts
James ReeseAssociated engineer

Interested Companies (45)

Certified CoatingsFairfield, CA
AP Traffic ServicesMather, CA
ConstructConnectCincinnati, OH

See All 45 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Redwood Road, MPM 2.3 project consists of 56 feet long soldier pile supported retaining wall at the slide and stitch piles at both ends of the retaining wall in order to prevent future slides and improve the road steep slope stability by installing 5 stich piles on each side of the soldier pile wall and 20 stitch piers over a distance of 40 feet on the north side of the road along the roadway edge. The stitch piers consist of 18-inch diameter piers that are spaced at 24 inches on-center. The stitch piers will be located a few feet from the top of creekbank, just inside the areas that are currently paved. The top of stitch piles are 2 feet below the top of new pavement. The structural steel soldier piles are embedded in 24-inch diameter holes filled with lean concrete. The cast-in-drilled hole piles are spaced at 8 feet on center. Precast Concrete lagging is placed between the soldier piles. A cast in place reinforced concrete cap is placed on top of the soldier piles.

More opportunities from California → Public Works

Same awarding agency

NAICS: 237310
New
SLED
HSIP 11 & 12: UNSIGNALIZED CROSSING IMPROVEMENT PROJECT
Solicitation # IFB No. PW-0332
The HSIP Cycle 11 and 12 Unsignalized Crossing Improvement Project, managed by the City of Santa Cruz Public Works Department, involves comprehensive roadway and pedestrian safety enhancements across five specific locations. The scope of work includes the installation of concrete curbs, gutters, curb ramps, roadway signs, pedestrian activated beacons, and thermoplastic striping and pavement markings. Work must be performed in accordance with the 2025 State of California Department of Transportation Standard Specifications, City Standard Specifications, and ADA standards. The project is divided into Cycle 11, covering Laurel Street at Blackburn Street, Broadway at Pennsylvania Avenue, and Seabright Avenue at Logan Street, and Cycle 12, covering High Street at Cardiff Place and Soquel Avenue at Poplar Avenue. This solicitation is an Invitation for Bids with a response deadline of November 5, 2026. The contract will be awarded to the lowest responsible and licensed bidder based on the City's estimated quantities of work. The successful contractor must complete the project within 50 working days and provide Faithful Performance and Labor and Material bonds each equal to 100 percent of the contract price within 10 calendar days of the award. Key administrative requirements include compliance with Department of Industrial Relations prevailing wage laws, the submission of a DIR Compliance Affidavit, and adherence to the City of Santa Cruz Quality Assurance Program. Payment terms include a 10 percent retention on the estimated value of work performed and a 20 percent retention on unused materials delivered.
Highway, Street, and Bridge Construction

POSTED

6 days ago

DEADLINE

in 9 days
View Details
NAICS: 562111
New
SLED
Request for Proposals for Services Related to the City of Tustin's Solid Waste Management Franchise Agreement
Solicitation # Requests for Proposals
The City of Tustin is seeking proposals for an exclusive ten-year Solid Waste Management Franchise Agreement to provide collection services for garbage, recyclable materials, organic waste, and construction and demolition debris. The selected contractor will be responsible for the collection, transportation, and delivery of materials to city-approved facilities, ensuring strict compliance with flow-control requirements and state mandates, including SB 1383 for organic waste diversion. The contract requires the contractor to provide specific color-coded and labeled containers, with new carts manufactured from at least twenty percent recycled material. Performance is monitored through strict reliability and quality standards, including a requirement to commence new customer service within seven business days. Proposals are evaluated on a 100-point scale based on service rates, financial ability, qualifications, and customer service reliability, though the city is not obligated to select the lowest bidder. Financial requirements include a one million dollar performance bond, a twenty-five thousand dollar security check, and proof of assets covering start-up and three months of operating costs. The agreement includes a structured pricing model for residential, multi-family, and commercial services, alongside specific fees for solicitation and annual administration. Awardees must adhere to ADA compliance for on-premises collection and maintain rigorous safety and regulatory standards as overseen by the Director of Public Works.
Solid Waste Collection

POSTED

6 days ago

DEADLINE

in 3 months
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS