ITB 26-18-214518 ARRC Seward Freight Dock Expansion

Active
26-18-214518State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Alaska Railroad Corporation is soliciting bids for the Seward Freight Dock Expansion Phase 1 Construction (ITB 26-18-214518), a marine construction project to lengthen the existing freight dock structure in Seward, Alaska. The project involves placing fill material, installing piles, and expanding the freight dock and road in Resurrection Bay. Key requirements include adherence to State Wage Rates Pamphlet 600 Issue 52 and compliance with various environmental permits, including US Army Corps of Engineers Permit POA-2024-00197 and authorizations from the National Marine Fisheries Service and U.S. Fish and Wildlife Service regarding protected species and incidental harassment. The solicitation process included a mandatory pre-bid conference on May 19, 2026, and optional site visits to the project location and the Birchwood Yard, where owner-supplied steel sheet piling is located. Through a series of four addenda, the Alaska Railroad Corporation provided critical clarifications, updated cost schedules, and issued revised plan sheets that supersede all previous drawings. Notably, Addendum 3 designated all additive alternate bid items as mandatory. The bid closing date was extended from June 4 to June 17, 2026, with Granite Construction Company identified as the lowest bidder following the bid opening.

General Info

Alaska Railroad Corporation hired Granite Construction for the Seward Freight Dock Expansion project.

Documents

9

Addendum No. 1 - ITB 26-18-214518 Seward Freight Dock Expansion P1 Construction

PDF, High priority: read this first3 pages · amendment
High

Addendum No. 2 - ITB 26-18-214518 Seward Freight Dock Expansion P1 Construction

PDF, High priority: read this first23 pages · amendment
High

Addendum No. 3 - ITB 26-18-214518 Seward Freight Dock Expansion P1 Construction

PDF, High priority: read this first7 pages · amendment
High

Addendum No. 4 - ITB 26-18-214518 Seward Freight Dock Expansion 1 Construction

PDF, High priority: read this first6 pages · amendment
High

ITB 26-18-214518 Seward Freight Dock Expansion

PDF, High priority: read this first84 pages · itb
High

Seward Freight Dock Expansion P1 Bid Abstract

PDF, High priority: read this firstbid-abstract
High

State Wage Rates Pamphlet 600 Issue 52

PDF, High priority: read this first39 pages · wage-determination
High

Department of the Army Permit POA-2024-00197 - Alaska Railroad Corporation

PDF, Low priority192 pages · award
Low

USFWS MMPA Authorization Request Letter - Alaska Railroad Corporation

PDF, Low priority1 page · special-notice
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseSolicitation
Posted

Solicitation

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyState of Alaska → Alaska Railroad Corporation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Greetings, Bid Abstract
Addendum 4 is issued to provide clarification in response to bidder questions. Addendum 3 is issued to provide clarification in response to bidder questions, update cost schedule, provide contact information for rail transport, provide prime bidder list, and provide additional design and specification documents. The deadline to submit questions is June 4, 2026. Questions received after this date will not be accepted or responded to. Responses to questions received by the deadline will be issued, if necessary, by written addendum. Revised Drawings and Additional Contract Documents The revised plan set drawings issued with this Addendum supersede in their entirety the previously issued drawings. All bidders shall base their bids solely on the revised drawings provided herein. Any references to earlier versions of the drawings shall be disregarded. In addition, this Addendum includes new supplementary documents and/or attachments , which are hereby incorporated into the Contract Documents. Bidders are responsible for reviewing and incorporating all requirements, conditions, and information contained in both the revised drawings and newly issued documents into their bids. Dropbox Location of Addendum 3 Revised Drawings and Additional Contract Documents: https://www.dropbox.com/scl/fo/433ta69jde6lamn1bkcsm/AJS29CX1eU3wx_C3W1uiSdM?rlkey=mg5fvazp2ffe6a46nkdfphhi6&st=o44st97w&dl=0 Failure to acknowledge and incorporate these updated and additional materials may result in the bid being deemed non-responsive . The Contract Documents are hereby modified to incorporate updated and additional materials as follows: D. Revised Plan Sheets (Superseding) The following revised plan sheets are issued with this Addendum and supersede the previously issued drawings in their entirety . Bidders shall base their bids on these revised sheets: Cover Sheet – Sheet 1 of 37 Demolition Plan – Sheet 6 of 37 Base Bid Storm Plan and Profile – Sheet 18 of 37 Expanded Freight Dock Plan and Elevation – Sheet 22 of 37 OCSP™ Plan, Details, and Schedules – Sheet 23 of 37 Vibrocompaction Plan – Sheet 25 of 37 Mooring Dolphin Details – Sheet 34 of 37 (Reference Questions 30 & 33) Anode Plan and Details – Sheet 36 of 37 E. Reference Grading Plan A Reference Grading Plan is included for informational purposes. F. Added Specification Revisions The following specification and drawing revisions are included and incorporated into the Contract Documents: Sheet 18 revisions pertaining to DEC water requirements Specification 627 Specification 706 (Note: These revisions are not associated with a specific bidder question.) G. As-Built Drawings (Reference Only) The following as-built documents are provided for reference only and are not part of the bid requirements: ARRC Dock Sediment Control Groin (1996), Sheets 1–2 Alaska Railroad Corporation New Seward Railroad Dock (2000), Sheets 1–17 H. Environmental Documents (Reference and Applicable to Questions 27 & 29) The following environmental permitting and compliance documents are included for reference and shall be considered as applicable to the project: ADEC 401 ADEC_POA-2024-00197 v1.0 Cert Resurrection Bay Updates Correspondence City of Seward Floodplain Permit – Freight Dock (February 2025) EFH Consultation NMFS EFH AKRO-2024-01047 MARAD Response NMFS EFH Comments ESA Consultations NMFS Biological Opinion (AKRO-2024-03274) USFWS Biological Opinion Incidental Harassment Authorizations (IHAs) Protected Species Monitoring Plan (April 21, 2026) NMFS IHA Final Issuance USFWS Correspondence (March 27, 2026) NEPA Documentation Finding of No Significant Impact (FONSI) – Final Environmental Assessment (Final, August 11, 2025) USACE Permitting POA-2024-00197 Permit Documentation (including signed, unsigned, and transmittals) Concrete Aggregate Coordination Documentation I. Additional Plan Document Birchwood Yard Layout – Sheetpile Stockpile Plan Addendum 2 is issued to provide clarification in response to bidder questions and extend the bid closing date. All other terms and conditions of the referenced solicitation remain unchanged. The bid closing date has been extended by this Addendum from June 4, 2026, to June 17, 2026, at 3:00 PM AKST.
Addendum 1 Please see Addendum No. 1 for ITB 26-18-214518: Seward Freight Dock Expansion. As noted in the addendum, there is an additional Dropbox attachment titled: “4.2.26 IFB ARRC Freight Dock Extension Addition Specifications.” Due to file size limitations, you may access the attachment via the following link: https://www.dropbox.com/scl/fi/5w50yqpw2zkc6gti6tdf8/4.2.26-IFB-ARRC-Freight-Dock-Extension-Addition-Specifications.pdf?rlkey=nz7wnu93cmy168qvix8ffq5jh&st=byhe3lfd&dl=0
ITB 26-18-214518; Seward Freight Dock Expansion
• Posting Date: May 7, 2026 • Closing Date: June 04, 2026
• Attachment A Plan Set: Seward Freight Dock Expansion Drawings 4/27/2026 Due to the size of the files, you may obtain the attachments from the following Dropbox Link: https://www.dropbox.com/scl/fi/foq09edwptxez0y6gi29a/4.27.26-IFB-ARRC-SEWARD-MARINE-TERMINAL-EXPANSION.pdf?rlkey=bx3lbwv9exkcotx93aqdxywir&st=6361j06a&dl=0 • State Wage Rates Pamplet 600 Issue 52, Effective 4/1/2026 • Incidental Harassment Authorization -NOAA • Letter RE Authorization MMPA - USFW • Permit POA-2024-000197
Pre-Bid Conference and Site Visit: A pre-bid conference will be held on Tuesday May 19, 2026, at 3:00 PM AK time via Microsoft TEAMS. This conference is mandatory for all prime bidders. Microsoft Teams meeting Join: https://teams.microsoft.com/meet/283010850492831?p=9AP6m6xvjlAkODyQAh Meeting ID:283 010 850 492 831 Passcode:Gw7Zn3YP
Owner Supplied Steel Sheet Piling for the project is currently located in the ARRC Birchwood Yard, approximate address 20750 Birchwood Spur Rd, Chugiak, Alaska. An Additive Alternate for transport of the material to Seward is included in the Bid Items. A non-mandatory site visit will be held on Thursday May 21, 2026, at 9:00 AM,to view this. Those wishing to attend shall be required to dress appropriately for weather, and to provide hard hats, safety glasses, and work boots. Interested parties must pre-register by May 20, 2026, 3:00pm with contact@example.gov to register.
A Project Site visit will be held on Thursday May 21, 2026, at 3:00 PM AK time approximate address 1001 Port Ave, Seward Alaska, this visit is non-mandatory. The meeting location will be in the Seward Passenger Terminal Building. Those wishing to attend shall be required to dress appropriately for weather, and to provide hard hats, safety glasses, and work boots. Those wishing to observe the area from the dock deck face shall be required to wear a personal flotation device. Interested parties must pre-register by May 20, 2026, 3:00pm with contact@example.gov to register.
Thank you,
Sarah Wallace Contract Administrator Specialist +1 (555) 000-0000 office / +1 (555) 000-0000 cell mailing: PO Box 107500, Anchorage, AK 99510-7500 physical: 327 W Ship Creek Ave, Anchorage, AK 99501 web: www.AlaskaRailroad.com
The contents of this email message and any attachments are intended solely for the addressee(s) and may contain confidential and/or proprietary information and may be legally protected from disclosure. If you are not the intended recipient of this message or their agent, or if this message has been addressed to you in error, please immediately alert the sender by reply email and then delete this message and any attachments. If you are not the intended recipient, you are hereby notified that any use, dissemination, copying, or storage of this message or its attachments is strictly prohibited.

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Contract FDC-214-102565.1, issued by the Commonwealth of Pennsylvania Department of Conservation and Natural Resources, involves the Phase 1 removal of a concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County. The scope of work includes the installation and removal of erosion and sediment control measures, implementation of a traffic control plan, stripping and stockpiling of topsoil, surface water control, and the excavation and placement of select fill. The project concludes with topsoil placement and seeding of all disturbed areas to restore the site to its original condition. The engineer's estimate for this project exceeds 1 million dollars. The contract mandates strict adherence to Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals of 19 percent and 3 percent, respectively. Bidders must provide a lump sum bid and are required to secure performance and material and labor payment bonds at 100 percent of the contract amount, as well as a maintenance bond at 50 percent. Technical compliance is governed by the General Conditions for Construction 2022 Edition and various ASTM standards for soil compaction and classification. Payments will be processed via Automated Clearing House (ACH) through the Commonwealth's procurement system.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 9 hours ago

DEADLINE

in 16 days
View Details
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 10 hours ago

DEADLINE

in 24 days
View Details

More opportunities from State of Alaska → Alaska Railroad Corporation

Same awarding agency

NAICS: 237310
SLED
ITB 26-24-214676 ARRC Pease Ave & Artillery Road Paving
Solicitation # 26-24-214676
The Alaska Railroad Corporation (ARRC) is soliciting bids for invitation to bid 26-24-214676 to perform grading, paving, striping, and traffic control upgrades at two railroad crossings located on JBER, Alaska: Pease Avenue (MP 117.2) and Artillery Road (MP 127.9). The project scope includes the removal of pavement at Pease Avenue, the installation of aggregate base courses and Hot Mix Asphalt (HMA) at both locations, and comprehensive traffic maintenance. The performance period is scheduled to begin on September 1, 2026, with substantial completion by October 1, 2026, and final completion by October 30, 2026. Due to permitting and field progress, work may be required during nights and weekends. The contract will be awarded to the low, responsive, and responsible bidder. Bidders must submit a comprehensive package including a construction bid form, a sworn contractor responsibility questionnaire, a subcontractor list, and a bid bond equal to five percent of the bid price. Awardees are further required to provide performance and payment bonds, a certificate of insurance, and a site health and safety plan. Because the project involves federal funding, the contractor must comply with the Build America, Buy America Act, Davis-Bacon Act wage requirements, and the Copeland Act. Additionally, the contractor must adhere to federal nondiscrimination laws and energy conservation requirements. Bids must be submitted by July 21, 2026, at 3:00 P.M. AKST to the ARRC office in Anchorage.
Highway, Street, and Bridge Construction

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 562211
SLED
ITB 26-22-214614 Railroad Tie Disposal Services
Solicitation # 26-22-214614
The Alaska Railroad Corporation (ARRC) is soliciting bids under ITB 26-22-214614 for the in-state disposal, processing, recycling, or reuse of approximately 45,000 creosote-treated railroad ties per year. Deliveries typically occur between July and November, with an average of 850 ties per railcar and 5 to 10 railcars arriving every two to three weeks. The contractor is responsible for all permitting, regulatory compliance, and environmental protections, including adherence to EPA, RCRA, and Alaska Department of Environmental Conservation regulations. Operational requirements mandate that railcars be unloaded and cleaned within five business days, and ties must be removed from ARRC property within fifteen business days. Award will be granted to the lowest responsive and responsible bidder, with ARRC reserving the right to evaluate bids based on overall value. The contractor must provide a QA/QC plan, a Site Health and Safety Plan, and maintain required insurance and performance and payment bonds. Compliance with Buy America preferences and Equal Employment Opportunity standards is required. Invoicing must be itemized and submitted within five days after the end of each month. Bids must be submitted in a sealed envelope by 3:00 PM local time on June 30, 2026, and must include a Service Bid Form, Contractor's Responsibility Questionnaire, Fee Schedule, and Lobbying Certification.
Hazardous Waste Treatment and Disposal

POSTED

4 months ago

DEADLINE

N/A
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS