Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Refrigerant Reclaimer Unit (COTS) Supplier

Open
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for the DLA Weapons Support ASC Commodities Division involves the procurement of a 2.0 HP refrigerant reclaimer transfer unit. The required equipment must be a Commercial Off-the-Shelf unit that meets the specific requirements of Johnson Controls Navy Systems, LLC part number 026-50024-000 and NSN 4250-01-717-4834. The delivery must include one fully assembled and tested unit equipped with a filter-drier, fittings, and a 50-foot power cord. The contract is a Total Small Business Set-Aside under FAR 19.5. All deliverables must be free of mercury and hexavalent chromium and must comply with DFARS 252.204-7012. The place of performance is located at FPO 09591, and the procurement falls under NAICS code 333248.

General Info

Procurement of one 2.0 HP refrigerant reclaimer transfer unit for DLA Weapons Support.

NAICS

333248 - All Other Industrial Machinery Manufacturing

Place of Performance

FPO, AE, 09591, USA

Set-Aside

SBA

Documents

This scope was carved out of SPE4A6-27-T-168X.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RECLAIMER, REFRIGERANT

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 7 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 1 document on the prime contractFrom RECLAIMER, REFRIGERANT
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → DLA WEAPONS SUPPORT ASC COMMODITIES DIVISION
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies a 2.0 HP transfer unit (refrigerant reclaimer) for prime contractors on DLA Weapons Support ASC projects. Provides a COTS unit meeting Johnson Controls Navy Systems, LLC part number 026-50024-000 and NSN 4250-01-717-4834 specifications, including a 50-foot power cord, filter-drier, and fittings. Must comply with DFARS 252.204-7012 and be free of mercury and hexavalent chromium. Delivers one fully assembled and tested transfer unit.

Similar Contracts

Same NAICS industry code

NAICS: 333248
New
Federal
Dual Heat Laminator
Solicitation # RFQ518918
UT-Battelle, LLC, the management and operating contractor for Oak Ridge National Laboratory (ORNL), is soliciting firm fixed price quotations for a dual heat laminator or equivalent for its Digital and Visual Communications Division. The specific requirement is for one 865DH 65" Dual Heat Laminator (Part Number 865DH-4RS, Manufacturer GFP) and associated installation and training services. This procurement is being conducted as a combined type contract with no specified set-aside status. Award will be granted to the responsible offeror providing the lowest-priced technically acceptable (LPTA) quotation. To be eligible, offerors must be the original equipment manufacturer or an authorized representative, comply with the Bill of Materials, and state their ability to deliver within one calendar day after receipt of order. Proposals must be submitted by December 2, 2026, and remain valid for 120 days. Shipping terms are FOB Destination for domestic shipments and Delivered at Place (DAP) for international shipments. The contract includes strict regulatory and security requirements, including compliance with NIST SP 800-171 and DOE O 205.1D for cybersecurity. Key FAR clauses include Termination for Convenience, Combating Trafficking in Persons, and Equal Opportunity for Veterans for agreements exceeding $200,000. Additionally, the Buy American Act applies to agreements exceeding the micro-purchase threshold.
Ornl Ut-Battelle Llc-Doe Contractor

POSTED

about 11 hours ago

DEADLINE

in 8 days
View Details
NAICS: 333248
New
Federal
P506 Pyro Equipment Procurement and Installation
Solicitation # W519TC-27-R-P506
The Department of War, Army Contracting Command - Rock Island Arsenal, on behalf of Crane Army Ammunition Activity, is conducting market research to identify qualified vendors capable of procuring, delivering, and installing specialized industrial manufacturing and energetics equipment at the P-506 Pyro Facility in Crane, Indiana. The scope of work includes the procurement, rigging, and physical installation of various equipment, including SERVOPRESS units, TNC and epoxy curing ovens, bladeless mixers, pulverizers, screeners, and ventilation systems such as wet scrubbers and dust collectors. All equipment and electronic controls must meet hazardous environment standards, specifically rated Class 1 Div 1 (Groups C & D) and Class 2 Div 1 (Groups E, F, & G) or better. This effort is strictly limited to equipment procurement and installation within existing footprints; structural military construction and facility layout design are excluded from the scope. The government is seeking feedback on a draft Performance Work Statement and information regarding commercial lead times and availability to support FY27 procurement planning. Interested vendors must submit a capability statement by December 7, 2026, detailing their experience with heavy industrial machinery in explosive-rated environments and identifying which required items are off-the-shelf versus custom. The anticipated period of performance is one year, with a primary installation window of no more than 30 days from the date of award. Contractors will be required to implement a comprehensive safety plan, including Job Hazard Analysis and Safety Data Sheets, and provide necessary safety personnel such as fire watches and spotters. There is no set-aside status specified for this requirement.
W6QK Acc-Ri

POSTED

1 day ago

DEADLINE

in 13 days
View Details

More opportunities from Department Of Defense → DLA WEAPONS SUPPORT ASC COMMODITIES DIVISION

Same awarding agency

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS