Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Regional Water Recycling Facility – Sutter Campus Grit Line Improvements

Open
2027-06State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Modesto is soliciting bids for grit line improvements at the Regional Water Recycling Facility Sutter Campus. The scope of work includes the removal and disposal of existing 4-inch glass-lined ductile iron pipe and the installation of new glass-lined ductile iron piping, fittings, and supports. Additionally, the contractor will be responsible for removing and reinstalling valves in the Grit Pump Room, performing sawcutting, concrete repairs, and surface preparation. To maintain plant operations, the contractor must coordinate with staff to ensure two of four grit basins and one of two grit washers remain online, utilizing temporary pumping, power, and safety devices as needed. A Water Pollution Control Plan is required for the project. Technical requirements mandate adherence to AWWA, NSF, and NEMA standards for piping and valves, and ASTM, AISC, and AWS standards for structural metals and welding. Key deliverables include shop drawings for pipe alignment and metal components, hydrostatic testing of pipe joints, and holiday detection tests for linings. Bidders must submit proposals via the OpenGov Procurement Portal by December 8, 2026, accompanied by a bid security of at least 10 percent of the bid amount. The project requires the payment of prevailing wages, and candidates must possess a minimum of 10 years of experience on similar projects. Performance and payment bonds must be furnished within five business days of the Notice of Award.

General Info

Bids for grit line improvements at Modesto's Regional Water Recycling Facility.

Place of Performance

Modesto, CA, 95351, USA

Set-Aside

NONE

Documents

2
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstspecifications
High

Read all 2 documents

Due in 22 days

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown
Due in 22 days

Everything you need to bid on this one

Open the full contract in your free workspace.

  • 2 solicitation documentsRead every page
  • AI contract breakdown13 sections, Uniform Contract Format
  • Buyer contactEmail
Open the full contract

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Modesto
Contacts1 person available
OfficeN/A

Full Description

Show more
Bid #2027-06 (101743): The project involves improvements to the grit lines at the Regional Water Recycling Facility – Sutter Campus. Key work items include removing and disposing of existing 4-inch glass-lined ductile iron pipe, fittings, and supports, installing new 4-inch glass-lined ductile iron pipe with fittings, installing pipe supports and associated structural components, removing and reinstalling existing valves in the Grit Pump Room, and other contract work such as sawcutting, concrete repairs, and surface preparation. The project also requires a Water Pollution Control Plan (WPCP). The work must be coordinated with plant staff to minimize disruption to the operational capabilities of the wastewater treatment plant, ensuring two of four grit basins and one of two grit washers remain online. Temporary pumping, power, lighting, controls, instrumentation, and safety devices may be required.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises for labor, materials, and services for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves extensive sewer infrastructure improvements, including the open-cut installation of PVC and Ductile Iron Pipe ranging from 6 to 30 inches in diameter. Key technical requirements include the installation of standard and doghouse manholes, interior drop assemblies, and 24-inch diameter trenchless crossings with associated launch and receiving shafts. Additional deliverables include the construction of an outfall and a CSO regulator fit out. Project requirements also encompass critical site management and compliance tasks, such as the implementation and maintenance of a Stormwater Pollution Prevention Plan, geotechnical instrumentation and monitoring, and the maintenance of flows and bypass. General base bid items include mobilization, clearing and grubbing of wooded areas, and seeding and fine grading. Notably, the project requires specific railroad insurance.
Cleary Construction, Inc.

POSTED

about 1 hour ago

DEADLINE

in 16 days
View Details
NAICS: 237110
New
IEUA Regional Water Recycling Plant No. 5(RP5) Offsite Facilities and Butterfield Lift Station
Solicitation # ieua-regional-water-recycling-plant-no-5rp5-offsite-facilities-butterfield-lift-station
The IEUA Regional Water Recycling Plant No. 5 Offsite Facilities and Butterfield Lift Station project, managed by Norstar Plumbing and Engineering, Inc. for the Inland Empire Utilities Agency, involves the comprehensive installation, commissioning, and delivery of critical water and sewer infrastructure in Chino, California. The scope of work is centered on four major components: the Butterfield Dual Force Main, the Mountain Avenue Lift Station, the RP-2 Lift Station, and the Butterfield Lift Station. To complete these objectives, the project requires a full suite of materials, labor, and equipment, including specialized services such as jack and bore, cold planing, SWPPP, AC paving, welding, potholing, and preconstruction video. This solicitation is specifically targeted toward SBA certified HUBZone Small Businesses and Disadvantaged Business Enterprises, with a strong emphasis on partnering with certified DBE, MBE, SBE, WBE, SBRA, and LSAF firms. Interested subcontractors must submit their responses by the deadline of November 19, 2026, at 2:00 PM. Primary points of contact for this effort are Destiny Plummer and Nathan Plummer. All work must be performed in strict accordance with the project bid documents and specifications provided by the Inland Empire Utilities Agency.
Norstar Plumbing and Engineering, Inc

POSTED

about 1 hour ago

DEADLINE

in 1 day
View Details

More opportunities from California → City of Modesto

Same awarding agency

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS