Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Industrial Coating and Corrosion Control Specialist

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for an Industrial Coating and Corrosion Control Specialist involves performing surface preparation and applying protective coatings for prime contractors on City of Modesto water recycling facility projects. The scope of work includes conducting DFT measurements and holiday testing to ensure all coated structures meet strict cleanliness and thickness standards. To ensure conformance, the contractor must hold SSPC-QP 3 certification and employ a NACE Certified Level 3 Coating Inspector. Additionally, the provider is required to submit written daily quality control inspection reports. The project is located in Modesto, California, with a response deadline of December 8, 2026.

General Info

Industrial coating subcontract for Modesto water facility requiring SSPC-QP 3 and NACE certifications.

Place of Performance

Modesto, CA, 95351, USA

Set-Aside

NONE

Documents

This scope was carved out of 2027-06.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Regional Water Recycling Facility – Sutter Campus Grit Line Improvements

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 22 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 2 documents on the prime contractFrom Regional Water Recycling Facility – Sutter Campus Grit Line Improvements
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Modesto
ContactsNo contacts available
OfficeN/A
Organization / AgencyCalifornia → City of Modesto
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Performs surface preparation and application of protective coatings for prime contractors on City of Modesto water recycling facility projects. Conducts DFT measurements and holiday testing. Requires SSPC-QP 3 certification and a NACE Certified Level 3 Coating Inspector for conformance. Provides written daily quality control inspection reports. Delivers coated structures meeting specified thickness and cleanliness standards.

Similar Contracts

Same NAICS industry code

More opportunities from California → City of Modesto

Same awarding agency

NAICS: 237110
SLED
Regional Water Recycling Facility – Sutter Campus Grit Line Improvements
Solicitation # 2027-06
The City of Modesto is soliciting bids for grit line improvements at the Regional Water Recycling Facility Sutter Campus. The scope of work includes the removal and disposal of existing 4-inch glass-lined ductile iron pipe and the installation of new glass-lined ductile iron piping, fittings, and supports. Additionally, the contractor will be responsible for removing and reinstalling valves in the Grit Pump Room, performing sawcutting, concrete repairs, and surface preparation. To maintain plant operations, the contractor must coordinate with staff to ensure two of four grit basins and one of two grit washers remain online, utilizing temporary pumping, power, and safety devices as needed. A Water Pollution Control Plan is required for the project. Technical requirements mandate adherence to AWWA, NSF, and NEMA standards for piping and valves, and ASTM, AISC, and AWS standards for structural metals and welding. Key deliverables include shop drawings for pipe alignment and metal components, hydrostatic testing of pipe joints, and holiday detection tests for linings. Bidders must submit proposals via the OpenGov Procurement Portal by December 8, 2026, accompanied by a bid security of at least 10 percent of the bid amount. The project requires the payment of prevailing wages, and candidates must possess a minimum of 10 years of experience on similar projects. Performance and payment bonds must be furnished within five business days of the Notice of Award.
Water and Sewer Line and Related Structures Construction

POSTED

8 days ago

DEADLINE

in 21 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS