Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Wisconsin was posted on April 15, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Rehabilitation of Municipal Well #9

Closed
TH41526State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. The project is located in California and encompasses a broad range of civil infrastructure and site work. Key scopes of work include underground utilities such as tunneling, boring, jacking, micro tunneling, and cathodic protection; site preparation involving land surveying, site clearing, shoring, and subsurface investigation; and surface improvements including asphalt paving, traffic signals, lighting, and landscaping. Required materials include ready mix supply, precast concrete, manhole materials, and valves. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. Responsive bidders must possess a valid California Contractor's license and provide acceptable insurance. Additionally, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected electronic system. The deadline for bid submission is November 18, 2025, at 2:00 p.m.
Kiewit Infrastructure West Co.

POSTED

about 7 hours ago

DEADLINE

in 9 days
NAICS: 237310
New
SLED
KTA 8297
Solicitation # 8297
KTA Contract 8297, managed by the Kansas Turnpike Authority, involves the installation of an Ultrathin Bonded Asphalt Surfacing (UBAS) overlay on I-35, including interchanges, from mile marker 112 to 132 in Lyon County. The scope of work encompasses UBAS, commercial grade asphalt patching and surfacing, patching of the I-35 mainline, and the milling and inlaying of the outside shoulder. Key deliverables include the installation of specific pavement markings, such as 12-inch white chevron lines and 6-inch yellow edge lines, and the implementation of comprehensive work zone traffic control. Performance is scheduled in phases, with asphalt patching and commercial grade paving starting no earlier than April 12, 2027, and UBAS and remaining work commencing after May 31, 2027. The contract will be awarded to the lowest responsible bidder based on the summation of unit prices multiplied by approximate quantities. Bidders must provide a statement of financial condition unless pre-qualified by the Kansas Department of Transportation or the Authority, and must submit a bid bond of 5 percent of the bid. The contractor is required to provide certificates of insurance for Workers' Compensation, Employer's Liability, and Comprehensive Public Liability and Property Damage Insurance. All work must adhere to the 2015 Standard Specifications for State Road and Bridge Construction and KDOT Construction Manual standards, with strict prohibitions against making turnarounds through the barrier wall.
Kansas Turnpike Authority

POSTED

about 23 hours ago

DEADLINE

in 2 days
NAICS: 237310
New
SLED
KTA 8289
Solicitation # 8289
The Kansas Turnpike Authority solicitation 8289 is for a roadwork project on I-335 in Shawnee County, spanning from mile marker 183.5 to 194.5. The scope of work includes pavement patching, the application of Type A Ultrathin Bonded Asphalt Surface (UBAS) on eastbound and westbound mainline lanes, and a 2-inch cold mill and 2-inch inlay on the shoulders. The contractor is also responsible for installing all mainline permanent pavement markings. All work must adhere to the 2015 Edition of the Standard Specifications for State Road and Bridge Construction published by the Kansas Department of Transportation, with specific asphalt mix requirements of SM-12.5A or SR-12.5A and binder grades of PG 64-28 and PG 70-28. The project is scheduled to begin no earlier than March 15, 2027, with a final completion date for minor clean-up work of November 19, 2027. Quality control and testing must be performed by an independent laboratory approved by the Director of Engineering, while the Authority handles batch plant inspection. Financial terms include a 5% retainage from the total work completed until contract and bond provisions are met. The contractor must maintain specific insurance coverages, including 1 million dollars for general and automobile liability and statutory worker's compensation. Strict safety protocols are in place, including a prohibition on turnarounds through barrier walls; violations will result in immediate work suspension without extensions to completion deadlines. The Kansas Turnpike Authority is tax-exempt under K.S.A. 79-3606(d).
Kansas Turnpike Authority

POSTED

about 23 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The City of Watertown Water Utility is seeking qualified municipal well contractors to submit proposals for the rehabilitation of Municipal Well #9, aimed at restoring well capacity, enhancing performance, and ensuring compliance with Wisconsin Administrative Codes NR 811 and NR 812. The well, constructed in 2001, is approximately 690 feet deep with a 20-inch diameter and is equipped with a 100 HP vertical turbine pump capable of pumping roughly 1,200 gallons per minute. The contractor’s responsibilities include removing and inspecting all pump equipment, conducting thorough mechanical and chemical rehabilitation procedures such as brushing, airburst treatments, sediment removal, and disinfection in line with regulatory requirements. Following these processes, the contractor must reinstall equipment, perform operational tests including well yield, and coordinate bacteriological sampling before returning the well to service. A final report detailing the condition of the well and the improvements made is also required. Proposals must outline the contractor's experience with municipal well rehabilitation, proposed methods and equipment, project schedule, lump sum pricing, unit costs for additional work, proof of insurance, and references for similar projects completed within the past five years. Work is scheduled to begin no earlier than May 18, 2026, and be substantially completed by September 18, 2026, with coordination to minimize impacts on water system operations. Late completion may result in liquidated damages. The City of Watertown requires compliance with all notification and documentation standards mandated by the Wisconsin DNR throughout the project. Interested contractors can contact Tim Hayden for more information, and all proposals must be submitted by April 28, 2026.

General Info

Watertown seeks contractors to rehabilitate Well #9 by September 2026 with regulatory compliance.

Documents

1
DOCX, High priority: read this firstrfp
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWisconsin → City of Watertown
Contacts1 person available
OfficeWI, USA
Organization / AgencyWisconsin → City of Watertown
Office AddressWI, USA

Full Description

Show more
Introduction
The City of Watertown Water Utility is requesting proposals from qualified municipal well contractors for the rehabilitation of Municipal Well #9. This project intends to restore well capacity, improve performance, and maintain compliance with Wisconsin Administrative Code NR 811 and NR 812.
Existing Well Information
Total Depth: Approximately 690 feet Well Diameter: 20-inch Pump Type: Vertical Turbine Pump Capacity: Approximately 1,200 GPM Motor: 100 HP, 460V, 3-Phase Year Constructed: 2001
Scope of Work / Technical Requirements
The contractor shall furnish all labor, materials, and equipment necessary to complete the rehabilitation of Well #9. Work shall include, but is not limited to, the following: Lock out and tag out all electrical service and remove the pump, motor, column pipe, shafting, and associated appurtenances. Inspect all removed equipment and provide a written report describing the condition of the motor, bowls, shafting, column pipe, bearings, and discharge head. Sound and televise the well to total depth (approximately 690 feet). Video shall be provided to the City. Perform mechanical rehabilitation of the well, including brushing and airburst/air shock treatment in the open borehole. Airburst shall be performed at a minimum of five blasts per foot unless otherwise approved. Bail and remove sediment and debris from the well to restore the original depth. Disposal of materials shall be the responsibility of the contractor and coordinated with the City. Provide and apply chemical treatment using NSF 60-approved products. Chemicals shall be introduced to the bottom of the well using a tremie pipe. The contractor shall agitate the well during treatment and allow sufficient contact time. Pump spent chemicals to a containment/neutralization system and neutralize before discharge. Disposal shall be coordinated with the City. Disinfect the well in accordance with NR 812.41(1) at a minimum. Televise the well after rehabilitation to confirm the effectiveness of the treatment. Reinstall the pump and all associated equipment. Tape wrap all column pipe joints and couplings. Replace worn components as necessary. Operate the well to waste until discharge is clear and chlorine residual is non-detectable. Perform a well yield test and record static water level, pumping level, and pumping rate. Coordinate bacteriological sampling. Two safe samples are required before placing the well back into service. Provide a final report summarizing the work performed and the before-and-after performance of the well.
Coordinate all required notifications and documentation with the Wisconsin DNR.
Proposal Requirements
Proposals shall include the following:
Description of the company's experience with municipal well rehabilitation Description of the proposed approach and equipment Proposed schedule for completing the work Lump sum base price Unit pricing for additional items Proof of insurance At least three references for similar work completed within the last five years A project schedule that meets the required start and completion dates
Project Schedule
The contractor shall not begin work on this project before May 18, 2026. All work shall be substantially completed by September 18, 2026. The contractor shall coordinate the work with the Water Utility to minimize impacts on system operations. Failure to meet the required completion date may result in assessment of liquidated damages as determined by the City.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS