Reid Steel Beam Bridge Project (Lake or Streambed Alteration Agreement No. EPIMS-HUM-67702-R1C)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Reid Steel Beam Bridge Project, managed by the California Department of Fish and Wildlife Region 1, involves the replacement of a failing culvert crossing with a steel-beam full-spanning bridge. The scope of work includes excavation, removal of existing culverts, channel grading to ensure stable slopes and streambeds, and the installation of riprap and rock armoring to prevent scour and minimize erosion. All activities must adhere to the revised design plans provided by A.M. Baird Engineering & Surveying, Inc. dated August 25, 2026. This project is identified under Lake or Streambed Alteration Agreement No. EPIMS-HUM-67702-R1C and is located in California. The forecast was posted on September 9, 2026, with Jonathan Hollis serving as the primary environmental scientist and point of contact for the agency.
General Info
Agency
NAICS
Place of Performance
approximately 5 miles southwest of the town of Miranda, CASet-Aside
Documents
(1)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS
