Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Reinforced Concrete Pipe (RCP) Installation

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → County of SacramentoView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Fair Oaks, CA, 95628, USA

Set-Aside

NONE

Documents

This scope was carved out of 20260822063.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Hazel Avenue At US 50 Interchange Improvement Project - Segment 1

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → County of Sacramento
ContactsNo contacts available
OfficeN/A
Organization / Agency
California → County of Sacramento
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Install 24” diameter reinforced concrete pipes for drainage or culvert systems, including excavation, bedding, backfill, and compaction.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, identified by solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Filanc is soliciting quotes for a wide range of specialized scopes of work, including pipeline infrastructure such as pipe installation, valves, welding, and cathodic protection, as well as civil engineering tasks like paving, striping, and precast vaults. The project also requires technical and environmental services including surveying, videography, testing and inspections, settlement monitoring, SWPPP implementation, traffic control, and asbestos pipe demolition and removal. The engineer's estimate for this project is $36,000,000. This solicitation is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. Filanc is an equal opportunity employer and strongly encourages participation from small businesses, including minority-owned, women-owned, veteran-owned, and disadvantaged business enterprises. To support diversity, Filanc intends to negotiate with qualified SBE, MBE, and WBE firms and offers assistance with obtaining bonding, insurance, and equipment. Bids must be submitted by the deadline of 2:00 PM on September 18, 2026. Interested parties can obtain plans and specifications at no cost by contacting Julia Masaitis at bids@filanc.com or 760-941-7130.
Filanc

POSTED

about 5 hours ago

DEADLINE

in 25 days
View Details

More opportunities from California → County of Sacramento

Same awarding agency

NAICS: 237310
New
SLED
Hazel Avenue At US 50 Interchange Improvement Project - Segment 1
Solicitation # 20260822063
The Hazel Avenue at U.S. 50 Interchange Improvement Project – Segment 1 is a major infrastructure solicitation issued by the County of Sacramento with an estimated construction cost of $28,500,000. Located in Fair Oaks, California, the project scope involves significant roadway and multimodal enhancements, including widening the Hazel Avenue overcrossing of U.S. 50, modifying westbound on-and off-ramps to incorporate a shared-use path, and widening U.S. 50 between Alder Pond and Folsom Boulevard to add an eastbound auxiliary lane. Additional work includes constructing a retaining wall at the eastbound loop on-ramp to improve shoulder width and clear recovery zones, as well as various site improvements such as irrigation, drainage, signage, and erosion control. Prospective bidders must submit electronic proposals via the SacCountyEbids portal no later than September 24, 2026, at 2:00 PM. The contract requires a California Class A General Engineering license and mandates that both the prime contractor and all subcontractors be registered with the California Department of Industrial Relations. Financial security requirements include a bid bond equal to 10% of the bid value, as well as performance and payment bonds totaling 100% of the contract price. Compliance with several regulatory frameworks is mandatory, including the Iran Contracting Act, SB 1383 organic waste reduction reporting, the Advanced Clean Fleets regulation, and Buy America domestic content requirements. Technical oversight is managed by Senior Civil Engineer Spencer Ord, while Jesse Sanchez serves as the Senior Contract Services Officer.
Highway, Street, and Bridge Construction

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details