This Solicitation opportunity from Pennsylvania was posted on July 28, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
This contract involves the renovation of an existing baseball field at Masons Mill Park in Upper Moreland Township, Montgomery County, Pennsylvania. The scope of work encompasses all labor, equipment, and materials required to regrade the current infield and replace it with a synthetic turf system featuring an underdrain system. The contractor is responsible for comprehensive site activities, including demolition, clearing and grubbing, soil erosion and sediment control, grading, soil compaction, and the removal of trash and materials. Additionally, the project includes the installation of a clay pitching mound, site furnishings such as anchored bases and home plates, and the restoration of any affected paved surfaces.
The project is governed by strict technical specifications and quality assurance standards, referencing PennDOT, ASTM, and ACI guidelines. Key requirements include the implementation of a landscape protection plan, the use of biodegradable erosion control blankets, and adherence to specific manufacturer qualifications for the synthetic turf system. The contract structure consists of a base bid and one add/alternate item, with specific procedures outlined for submittals, project scheduling, and contract closeout. Coordination is managed through preconstruction and progress meetings, and the contractor must secure all necessary local permits to ensure the complete supervision and performance of the work.
General Info
Renovation of Masons Mill Park baseball field with synthetic turf and infield regrading.
HighAI Summary for Masons Mill Park Ballfield Renovation Project 21-11058.02 - Addendum #1: Issued August 25, 2025, by Gilmore & Associates, Inc., this addendum modifies the bid for the Masons Mill Park Ballfield Renovation. Key changes include revising the Bid Form to replace the export of excavated materials with two alternates (Contractor's location vs. Township site), adding questions to the Bid Questionnaire, replacing Section 01 22 00 (Measurement and Basis of Payment) and Section 32 52 00 (Synthetic Turf) in the Project Manual, and updating multiple bid plan sheets. It also includes non-mandatory pre-bid meeting minutes.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Masons Mill Park Ballfield Renovation - Site Improvement Plans: Technical site improvement plans and specifications for the Masons Mill Park Ballfield Renovation project in Upper Moreland Township, Montgomery County, PA. The document includes project location details, specific requirements for FlexStorm Pure Inlet Filters, concrete joint spacing notes, and base anchor installation instructions for synthetic turf.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 29 00 - Contract Considerations: This document is a technical specification section (01 29 00) detailing contract considerations. It outlines requirements for the Schedule of Values, application for payment processes, change order procedures (including stipulated price, unit price, and time and material changes), and the handling of project alternates.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 31 00 - Coordination and Meetings: Technical specification section 01 31 00 detailing requirements for project coordination, field engineering, and meeting protocols (preconstruction and progress). It outlines attendance requirements, agenda items for meetings, and specific execution standards for cutting and patching.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 32 16 - Construction Project Schedule: Technical specification section 01 32 16 detailing the requirements for the preparation, maintenance, and revision of the construction project schedule. It specifies a submission deadline of 30 calendar days after the Notice to Proceed and outlines the required components of the schedule, including activity descriptions, durations, and calendar dates.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 33 00 - Submittals: This document is a technical specification section (01 33 00) detailing the requirements for submittals. It outlines procedures for submitting product data, shop drawings, samples, design data, test reports, and certificates, as well as requirements for construction progress schedules and the review process by the Engineer.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 35 16 - Alteration Project Procedures: Technical specifications document detailing procedures for alteration projects, including patching, extending work, transitions, adjustments, and repair of damaged surfaces. It outlines requirements for material matching, surface preparation, and cleaning for renovation work.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 40 00 - Quality Control: This document is a technical specification section (01 40 00) detailing the quality control requirements for a project. It covers quality assurance, installation tolerances, reference standards, mock-up requirements, testing laboratory services, observation services, and manufacturer field services. It also outlines the execution process, including site examination and preparation.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 50 00 - Construction Facilities and Temporary Controls: Technical specifications detailing the requirements for construction facilities and temporary controls. It covers temporary utilities, sanitary facilities, barriers, fencing, water and dust control, security, access roads, parking, and waste removal.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 56 39 - Landscape Protection: Technical specifications for Section 01 56 39, detailing requirements for landscape protection during construction. Includes guidelines for temporary fencing, root protection, pruning standards, and fertilization requirements to ensure plant survival, referencing Pennsylvania Dept. of Transportation Publication 408.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 57 13 - Soil Erosion and Sediment Control: Technical specifications for Soil Erosion and Sediment Control (Section 01 57 13). The document outlines requirements for implementing the Soil Erosion and Sediment Control Plan, adherence to Pennsylvania DEP and PennDOT Publication 408 standards, material requirements for filter socks and silt fences, and execution procedures for temporary and permanent site stabilization.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 57 14 - Erosion Control Blanket: Technical specifications for the furnishing and installation of biodegradable erosion control blankets. The document details material composition (70% straw, 30% coconut fiber), product standards (SC150 BN or equivalent), shipping/storage requirements, and specific execution instructions for site preparation and geotextile placement.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 60 00 - Material and Equipment: Technical specifications section 01 60 00 detailing requirements for materials and equipment, including transportation, handling, storage, protection, substitution procedures, and manufacturer equipment guarantees.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 01 70 00 - Contract Closeout: Technical specifications detailing the contract closeout procedures, including final cleaning, adjusting, project record document requirements, and final payment documentation such as payroll certifications and lien waivers.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 02 41 16 - Demolition: Technical specifications for demolition work, including the removal and disposal of structures, facilities, and trees. The document outlines requirements for submittals, existing condition management, utility coordination, and specific execution procedures for the orderly demolition of structures and abandonment of sanitary sewer pipes.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 03 11 00 - Concrete Formwork: Technical specifications for concrete formwork, including shoring, bracing, and anchorage. The document outlines design requirements per ACI standards, material specifications for wood forms and accessories, and detailed execution instructions for erection, cleaning, and removal of formwork.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 03 20 00 - Concrete Reinforcement (West Norriton Township Park): Technical specifications for concrete reinforcement for the West Norriton Township Park project, dated March 2024. The document details requirements for reinforcing steel bars, wire fabric, accessories, and fabrication standards, referencing ACI and ASTM standards.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 03 30 00 - Cast-in-Place Concrete (West Norriton Township Park): Technical specifications for cast-in-place concrete for the West Norriton Township Park project, dated March 2024. The document details requirements for foundations, floors, slabs on grade, and joint devices, including references to ACI and ASTM standards, material mix designs (4,000 psi compressive strength), submittal requirements, and execution/quality control procedures.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 12 93 00 - Site Furnishings: Technical specifications for site furnishings, specifically detailing requirements for anchored bases, home plates, and pitcher's rubbers. It includes basis-of-design products such as Champro and Hollywood Burry-all, submittal requirements, and installation guidelines.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 31 11 00 - Clearing and Grubbing: Technical specifications for Section 31 11 00, detailing the requirements for clearing, grubbing, stripping and stockpiling topsoil, and debris disposal. It includes definitions of work, job conditions, submittal requirements for debris disposal, material specifications for fencing and tree dressing, and detailed execution procedures for utility relocations and site restoration.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 31 20 00 - Earthwork: Technical specifications for Section 31 20 00 Earthwork, covering site grading, topsoil removal, excavation, and backfill. The document details quality assurance standards (PennDOT and ASTM), submittal requirements for soil testing, material specifications for subbase and drainage fill, and execution procedures for excavation and compaction.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 31 23 16.26 - Rock Removal: Technical specifications for rock removal during excavation, covering both mechanical and explosive methods. The document details quality assurance requirements, regulatory compliance with NFPA 495 and Pennsylvania state laws, pre-blasting survey protocols, and specific execution instructions for utility trenches and foundation bearings.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 31 23 33 - Excavation, Backfill and Compaction: Technical specifications for excavation, backfill, and compaction activities associated with utility construction and structure installation. The document details quality assurance standards (ASTM, PennDOT), compaction density requirements for various areas, traffic control, utility protection, and specific material requirements for pipe bedding and embedment.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 31 37 16 - Energy Dissipator (West Norriton Township Park): Technical specifications for the installation of Rock Energy Dissipators (Rip-Rap Aprons) for the West Norriton Township Park project, dated March 2024. The document outlines quality assurance standards based on Pennsylvania Department of Transportation Publication 408, material requirements for rock and geotextile fabric, and execution procedures for installation and restoration.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 05 19.13 Geotextile Specifications: Technical specifications for Section 32 05 19.13 regarding the furnishing and installation of woven synthetic fiber geotextiles used as permeable separators. The document includes detailed physical requirements (Table 1), ASTM test methods, shipping, storage, and placement instructions.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 12 23 - Restoration of Paved Surfaces: Technical specifications for the restoration of paved surfaces, including temporary and permanent paving, shoulder, walkway, driveway, and curb/gutter restoration. The document mandates compliance with Pennsylvania Department of Transportation (PennDOT) Publication 408 and specifies materials, submittal requirements, and execution methods for bituminous and concrete restoration.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 18 23.13 - Baseball Field Surfacing: Technical specifications for the construction of a clay baseball field pitching mound. The document details material requirements (DuraPitch Professional Mound Clay and ProSlide conditioners), submittal requirements including ASTM F-1632 particle size analysis, installer qualifications, and execution procedures for placement, compaction, and topdressing.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Section 32 52 00 - Synthetic Turf Specifications: Technical specifications for the furnishing, delivery, installation, and warranty of a complete synthetic turf system. The document details ASTM reference standards, strict manufacturer and installer qualifications, basis of design (Fielder's Choice 416-50), and required submittal documentation including samples and third-party laboratory reports.
PDF
PDF, Low priorityspecifications
LowAI Summary for Section 01 42 13 - Organization and Reference Acronyms: This document is a technical specification section (01 42 13) providing a comprehensive list of organization and reference acronyms, such as AASHTO, ANSI, and OSHA, used throughout the project manual.
Ref. #: Upper Moreland Township, Montgomery County The work to be done under this contract consists of all labor, equipment, and materials for the improvement of an existing baseball field at Masons Mill Park in Upper Moreland Township, Montgomery County, PA. The current infield will be regraded and replaced with synthetic turf with an underdrain system. The Contractor is responsible for all demolition, turf system installation, erosion control, grading, soil compaction, trash/material removal, and local permitting. The Contractor shall provide all materials, equipment, tools, labor and work, unless otherwise provided and shall be responsible for the complete supervision, performance and completion of all work in accordance with the drawings, specifications, special provisions and contract. The Contract consists of a Base Bid and one (1) add/alternate item.