Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Iowa was posted on June 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Remediation & Demolition of 1855 Ellis Blvd NW

Closed
PUR0625-359State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
Demolition of Connex Box Structures and Removal of Debris
Solicitation # ACFD 26-03
The Alameda County Fire Department (ACFD) is soliciting sealed bids for solicitation number ACFD 26-03, focused on the demolition of Connex Box Structures and the removal of debris at 890 Lola Street in San Leandro, California. This is a stipulated sum, single-prime contract with a total project duration of 120 calendar days. Bids must be submitted by 2:00 pm on December 10, 2026, at 6363 Clark Ave., Dublin, California. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid amount. Required submission documents include a bid bond or security of 10 percent of the total bid price, a non-collusion declaration, a debarment form, and a designated subcontractors list. The successful contractor must provide 100 percent performance and payment bonds and adhere to California Public Works Contract requirements, including the payment of prevailing wages. Key operational requirements include the submission of a site security and logistics plan addressing tool control and working around inmates, as well as strict adherence to soil dust mitigation and hazardous materials procedures. Project milestones range from the initial kick-off meeting and equipment delivery to final site clearance. The contractor is also required to comply with the Americans with Disability Act and Title VII of the Civil Rights Act of 1964. All work is subject to inspection and potential rejection by the ACFD and the Construction Manager to ensure conformity with technical specifications and industry standards.
AC Fire Department

POSTED

about 10 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract pertains to a sealed bid process initiated by the City of Cedar Rapids Public Works Engineering Division for the remediation and demolition of a residential property located at 1855 Ellis Blvd NW in Cedar Rapids, Iowa. The project involves the removal of one residential structure and an accessory structure, with bids due electronically through the city's designated online procurement portal by 3:00 p.m. CDT on July 10, 2025. The contract size is estimated to range between $50,000 and $150,000, and the city emphasizes strict adherence to the electronic submission process, with no acceptance of email, fax, or hard copy responses. Bids will be publicly opened on the specified deadline, evaluated promptly, and bid results will be shared only after the award, with a mandatory hold period of 60 days for bid validity. The primary point of contact for inquiries is Rebecca Johnson, reachable via email or phone. Supporting documentation includes the city's general terms and conditions, which outline contractual obligations such as compliance with ADA standards, bid submission requirements, conflict of interest policies, and public access to bid information. The procurement process also incorporates the City of Cedar Rapids Buy Local Purchasing Policy, which favors local businesses within Linn County that meet specific criteria, although certain exclusions apply. The project is governed by applicable NAICS codes, specifically 238910, indicating its classification within specialty trade contractors involved in remediation and demolition services. Overall, the solicitation emphasizes transparency, compliance with local policies, and the importance of correct electronic submission procedures to ensure a fair and efficient bidding process for this municipal project.

General Info

Place of Performance

IA, USA

Set-Aside

NONE

Documents

7

Asbestos Inspection Report - 1855 Ellis Blvd NW

PDF, High priority: read this firstspecifications
High

City of Cedar Rapids Standard Terms and Conditions

PDF, High priority: read this firstspecifications
High

PUR0625-359 Insurance Requirements

PDF, High priority: read this firstspecifications
High

PUR0625-359 Remediation & Demolition of 1855 Ellis Blvd NW

PDF, High priority: read this firstrfb
High

PUR0625-359 Scope of Work - Environmental Remediation and Demolition

PDF, High priority: read this firstsow
High

City of Cedar Rapids Buy Local Purchasing Policy

PDF, Low priority4 pages · special-notice
Low

PUR0625-359 Insurance Certification Form

PDF, Low prioritysupporting-document
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyIowa → City of Cedar Rapids
Contacts1 person available
OfficeN/A
Organization / AgencyIowa → City of Cedar Rapids
Office AddressN/A

Full Description

Show more
Notice of Request for Bid Notice is hereby given that sealed bids will be received electronically before 3:00 p.m. CDT on Thursday, July 10, 2025, for Remediation & Demolition of one (1) residential structure and one (1) accessory structure located at 1855 Ellis Blvd NW, Cedar Rapids, Iowa, as requested by the City of Cedar Rapids Public Works Engineering Division. The City will only accept bids submitted through the City’s Online E-Procurement portal system (Euna Procurement, powered by IonWave). Email, fax or hard copy Submittals are not acceptable. Suppliers are solely responsible for correctly submitting their response into the electronic system (Euna Procurement, powered by IonWave). The City bears no responsibility for delays or errors in submittal of response by the Supplier. Bids will be opened on Thursday, July 10, 2025, at 3:00 p.m. CDT (our clock).   Bids will be evaluated promptly after opening.  After an award is made, a bid tabulation summary will be sent to all companies who submitted a bid.  Bid results will not be given over the telephone or prior to award.  Bids may be withdrawn any time prior to the scheduled closing time for receipt of bids; no bid may be modified or withdrawn for a period of sixty (60) calendar days thereafter.    

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS