Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Removal, Disposal, And Installation Of Filter Media In Filters 1, 2, And 3 At Wtp No. 2

Closed
21509State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, pumps, a generator, and odor control equipment, as well as the demolition of existing pumps and piping. Additional requirements include the installation of new gravity sewers, manholes, stormwater facilities, and site restoration. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on qualifications, financial ability, and compliance with M/WBE requirements, including the submission of Good Faith Efforts forms. Bidders must adhere to strict technical standards, such as AWWA Specification C-600 for pipelines and NEMA standards for motors. Contract administration is managed by Willis Engineers on behalf of the City of Belmont, utilizing EJCDC standard forms for agreements and payment applications. Required security includes performance and payment bonds, and insurance providers must typically maintain an A.M. Best rating of A-VII or better.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The Alameda County Water District is soliciting bids for the removal, disposal, and installation of filter media in Filters 1, 2, and 3 at Water Treatment Plant No. 2 in Fremont, California. The project requires the contractor to provide pre-washed anthracite and sand that meet AWWA Standard B100, ensuring a final media depth of 42 inches. The selected contractor must begin work within 10 calendar days of the Notice to Proceed and complete all activities within 170 calendar days. Key deliverables include a material disposal plan and documentation proving the media supplier has provided anthracite to at least five potable water treatment plants of at least 10 mgd within the last five years. Bidders must attend a mandatory pre-bid meeting on September 24, 2026, and submit sealed proposals by October 15, 2026. Requirements for submission include a noncollusion declaration, a bidder's statement of experience, a preliminary construction schedule, and proposal security of at least 10 percent of the total. Additionally, all contractors and subcontractors must be registered with the Department of Industrial Relations per Labor Code section 1725.5. Due to the security-sensitive nature of the project, bidders must execute a Non-Disclosure Agreement and provide a refundable deposit to obtain contract documents. Payment will be issued via monthly progress payments.

General Info

Alameda County Water District seeks bids for filter media replacement at Plant No. 2.

Documents

1
PDF, High priority: read this first167 pages · rfb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Alameda County Water District
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
Bid #21509: $18

More opportunities from California → Alameda County Water District

Same awarding agency

NAICS: 541330
SLED
MSJWTP Tank Decommissioning and Building Systems Modification
Solicitation # 21121
The Alameda County Water District is soliciting proposals for engineering consulting services to support the Mission San Jose Water Treatment Plant (MSJWTP) Tank Decommissioning and Building Systems Modification project. The scope of work includes decommissioning the Mission San Jose Treated Water Tank, upgrading fire suppression systems to utilize non-potable water from the South Bay Aqueduct, and modifying the offsite Ohlone Regulator to ensure continued fire suppression flow. Additionally, the consultant will evaluate and upgrade or demolish existing HVAC infrastructure, integrate new controls into the SCADA system, and provide CEQA compliance support and coordination with the Department of Water Resources. Key deliverables include a Basis of Design report and the performance of point-to-point, dry, and wet testing for the building management system. The contract will be awarded to the highest-ranked consultant based on qualifications, staff experience, and the proposed approach to ensure the best value. Compensation is structured on a time and materials basis with a not-to-exceed cost ceiling, with payments issued within 45 calendar days of invoice receipt. Proposals must be submitted electronically via the Bonfire portal by November 17, 2026, and must adhere to strict formatting requirements across two PDF volumes. Notable constraints include a requirement that the tank cannot be taken out of service before March 1, 2027, and the necessity for consultants to provide a DIR registration number and comply with prevailing wage laws.
Engineering Services

POSTED

19 days ago

DEADLINE

in 9 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS