Removal of 2 Half-Walls
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
This project involves the removal of two concrete brick half-walls and associated flooring in the waiting area of the U.S. Embassy Consulate in Vienna. The scope of work includes the installation of dust protection, demolition and disposal of materials, dismantling and relocating electrical wiring and sockets, and the installation of new flooring including screed and laminate. The contract is valued at 32,051.74 dollars and is structured as a firm fixed price agreement. Execution is planned for a brief 4 to 5 day window in the fall of 2026. Due to the facility remaining operational, work must be performed during restricted time slots, including nights and weekends, to avoid disturbing employees and clients. The selected general contractor must adhere to strict USG security regulations, including clearance processes for all personnel, vehicles, and materials entering the site. This opportunity is identified as a likely recompete with a potential end date of November 30, 2026.
General Info
Place of Performance
Vienna, AT-9, AUTSet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Organization & Contact Information
Full Description
Current Contract: 19AU9026C0017 Incumbent: MISCELLANEOUS FOREIGN AWARDEES Contract Value: $32,051.74 Potential End Date: 2026-11-30T00:00:00.000Z Competition: COMPETED UNDER SAP Pricing: FIRM FIXED PRICE Classification: recompete-likely (Confidence: medium - 55/100)
This project is for the removal of 2 half-walls in the waiting area at the U.S. Embassy Consulate in 1010 Vienna.
Interested parties shall prepare and submit a quotation according to the detailed tender documents that will be published in the next step of procurement/solicitation notice.
Tender specifiations: General Contractor for Construction work, Flooring and Electrical Installation
The SOW consists but is not limited to the following:
- Dust Protection: temporary dust screen made of strong plastic sheeting around the demolishing area (floor to ceiling)
- Site installation & Logistics Complications: City centre, vehicle access, hotel-office building in operation, neighbors, operating hours, restricted working hours, security measures
- Demolition, removal and disposal of 2 half-walls: concrete bricks (length sum +14.5m, height=1.3m) and adjacent floor in all layers
- Electrical installations Dismantling of switches, sockets, wiring in half walls and floors before demolition; new switches/sockets/wires to be installed in existing walls.
- Filling of the area in the floor+ new flooring (screed, impact sound insulation, laminate flooring)
- Site-Cleaning renovation area and all affected areas in the building
Special requirements
- The work will be carried out in short time slots (incl. night & weekend) while the facility remains in operation and in the presence of the employees and clients who should not be disturbed during the construction work
- USG Security regulations
- Clearance process for employees, cars, material on site
- Safety and protective measures
Execution periods
Indicative construction schedule: 4-5 days in fall 2026
Similar Contracts
Same NAICS industry code
Earlier notices in this NAICS code
Posted before this notice, open and closed
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS