Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on August 30, 2011. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Removal of Emergency Levees

Awarded
W912ES-11-R-0025Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
International
2383 Emerson Street - Modular Pump Track - Design-Build Services
Solicitation # RFP 1220-2026-4364
The City of Abbotsford has issued Request for Proposals RFP 1220-2026-4364 for design-build services to create a complete, safe, durable, and fully operational modular pump track facility at 2383 Emerson Street. The project follows a stipulated price contract based on the CCDC 14-2013 Design-Build Agreement. The selected Design-Builder will be responsible for all professional design and engineering services, including the preparation of sealed plans, as well as the provision of all labor, materials, modular pump track units, and site furnishings. Additionally, the contractor must obtain all necessary permits, licenses, and certificates of inspection required by federal, provincial, and local authorities. A mandatory site visit is scheduled for November 9, 2026, at 10:00 AM local time, and attendance is required for proposal submission. The deadline for responses is November 24, 2026, at 10:00 PM. Project acceptance is contingent upon the Consultant and Owner's satisfaction regarding the rectification of deficient work, completion of landscaping and clean-up, and the facility reaching full operational readiness. Payments will be processed via progress payment approvals issued by the City Representative. All work must adhere to the rules and customs of best trade practice and meet the requirements of all governing jurisdictions.
City of Abbotsford

POSTED

about 19 hours ago

DEADLINE

in 24 days

General Info

Contract Value

$1,001,000

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

3416 N. Broadway, MINOT, ND, 58703, USA

Set-Aside

NONE

Award Issued Date

Documents

5
PDF, High priority: read this firstamendment
High
PDF
PDF
PDF
PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Deadline changed

Response deadline changed from Aug 23, 2011 to Aug 25, 2011.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W07V Endist St Paul
Contacts2 people available
OfficeSAINT PAUL, MN, 55101-1323, USA
Office AddressSAINT PAUL, MN, 55101-1323, USA

Full Description

Show more
Removal of Emergency Levees Minot Public School Service Buildings Minot City Hall and Public Library Burlington to Minot-King's Court and Rostad's Addition Minot, ND SCOPE OF WORK http://www.hq.usace.army.mil/soh/hqusace_soh.htm. 1. General. The work under this procurement consists of removal of emergency levees constructed during the spring 2011 flood fight in Minot, ND. The work of this contract consists of providing all labor, equipment and materials for removal of emergency levees and associated materials from areas along City Hall, the Minot Public Library, Minot Public School Service Buildings and Burlington King's Court and Rostad's Addition. This work also includes removal of two clay stockpiles. Removal sites are as identified on Attachment 1 (which consists of 3 maps). Before any physical work can be performed in the City of Minot, the contractors, subcontractors, and their employees are required to register at the City of Minot One Stop Contractor Licensing Office, 3416 N. Broadway Minot, North Dakota. Office hours are 9:00 AM to 5:00 PM. The Contracting Officer for this project is Kevin Henricks at the U.S. Army Corps of Engineers, Saint Paul District office. His phone number is +1 (555) 000-0000. Any changes to the contract must be approved, in advance, by the Contracting Officer. 2. Location of Materials to Be Removed. Emergency levees to be removed are located on private and public property such as streets, adjacent sidewalks, yards, and boulevards. 3. Notification of Required Clearances. The contractor shall not work in an area (i.e. levee removal area or material disposal site) until an appropriate Right-of-Entry (ROE) for that area has been obtained. The Government is responsible for obtaining the necessary ROEs and will notify the contractor when an ROE for a particular area is obtained. ROEs have been obtained and will be provided to the contractor. 4. Coordination with Other Recovery Efforts. The Contractor shall coordinate its work efforts so as not to interfere with other ongoing recovery efforts by the Corps, the City, FEMA, utility providers or other public authority. The Contractor shall keep the Contracting Officers Representative (COR) promptly and fully apprised of all coordination efforts and any interference or disruption of work encountered. 5. Measurement and Payment. The work of this contract will be measured for payment on a lump sum basis as indicated on the Bid Schedule. 6. Site Inspection. It is the Offeror's responsibility to perform a site visit prior to bidding to become familiar with the quantities, conditions and requirements associated with the removal and cleanup requirements and to determine the level of effort necessary to accomplish all work. The Offeror shall take any necessary measurements and make such computations as are necessary to determine the level of effort required to accomplish a complete emergency levee removal and all associated work (including cleanup, disposal, and site restoration) for all removals required under this contract. 7. Emergency Levee Removal. The contractor shall remove all emergency levee material and any associated debris and other materials on public right of way and private property at the locations shown in Attachment 1 to this solicitation. The contractor shall protect all pre-existing levees during removal operations. The emergency levee removal work involves complete removal of all clay, sandbags, stone, concrete rubble and associated materials on private property and public right of way. Concrete rubble and stone shall be segregated from the clay material and hauled separately to pre-determined staging areas described below and shown on the attachments to this solicitation. Removed clay materials will be transported to either a designated borrow area or a clay stockpile site as specified in this contract. Sandbags will be segregated and hauled separately to the designated sandbag stockpile location. The sandbag stockpile site will be at the Minot Municipal Facility at the end of the road past the Clay material Stockpile area. All other materials such as poly, plastic, wood, etc shall be disposed of in an appropriate landfill; the contractor is responsible for any and all fees and taxes associated with said disposal. On streets, material shall be removed curb to curb, to include street sweeping; sidewalks shall be cleared and swept; and private property and boulevards shall be cleared and raked. At the conclusion of removal and/or placement of clay materials, the site shall be dressed to final grade that matches the grade of the adjacent ground. The placement site will be graded smooth and sloped to drain naturally. The contractor shall be responsible for complying with all applicable stormwater management practices while accomplishing the work. The contractor shall protect any stormwater inlets that are currently visible or uncovered during removal operations from further siltation by the use of cigar bags or other stormwater protective devices acceptable to the Contracting Officer. The Contractor will complete all work, including site cleanup, in accordance with FAR clause 52.211-10. Notice to Proceed will be issued following a preconstruction meeting, with Performance and Payment Bonds due within five (5) calendar days of contract award. 8. Mandatory material placement location. Removed emergency levee clay materials shall be either placed as specified below in existing borrow areas or at a designated stockpile location. The contractor is responsible for providing sufficient appropriate equipment at each borrow area and stockpile site for the handling and placement of material. The contractor shall be responsible for stabilization of both placed and stockpiled materials and for management of stormwater at the placement and stockpile sites. The contractor obtain all necessary permits or clearances related to stormwater management at the clay disposal and stockpile sites and implement all necessary measures to remain in compliance with stormwater requirements throughout the life of the contract. Efforts required for stormwater management may include but are not limited to silt fences, hay bales, etc. Information regarding stormwater management and permitting requirements can be obtained from Mr. Dallas Grossman, Stormwater Program Coordinator, North Dakota Department of Health, at +1 (555) 000-0000. For the sites described o Attachment 1, pages 1 and 2, clay material shall be hauled to the Minot airport site. (See Attachment 2) Compaction is not required at this site. If capacity at this site is reached, the remaining clay shall be hauled to the stockpile site at the Minot municipal landfill. Contractor shall coordinate all activities as not to interfere with others using either of these sites. All concrete rubble and stone shall be hauled and stockpiled at designated sites at the Minot Municipal landfill. (See Attachment 2 for locations) Any other materials such as poly, plastic, wood, etc. shall be disposed of in an appropriate landfill. For landfill disposed materials, the contractor is responsible for all landfill charges to include tipping fees and any applicable taxes. c. Material removed from King's Court and Rostad's Addition will be disposed of as indicated on attachment 1, page 3. Disposal areas should be dressed to match surrounding area. 9. Removal of Emergency Levees and Associated Materials at Public Schools Service Buildings; City Hall and the Public Library in the City of Minot; and Burlington to Minot - King's Court and Rostad's Addition. The emergency clay levees and all associated materials shall be removed and disposed of concurrently. See Attachment 1 for details. 10. Meetings. The Contractor shall attend a preconstruction meeting as scheduled by the COR. It is anticipated that this meeting will be held after contract award and prior to notice to proceed. The purpose of this meeting is to discuss construction schedule, safety, work hours, scope of work, and to review other contract requirements. 11. Prosecution of Work. It shall be the responsibility of the Contractor to schedule and execute all work required by this contract and accomplish that work within the prescribed timeframe. The contractor shall submit its schedule for approval by the Government prior to the preconstruction meeting. It is the Contractor's responsibility to erect warning signs, provide flagging services, and take any other safety measures necessary or prudent to safeguard the public. It is the contractor's responsibility to assign the necessary resources to perform the temporary levee removals within the prescribed timeframe. The contractor shall conduct and schedule work operations to minimize impacts to the adjacent property owners. 12. Quality Control. The Contractor shall establish and maintain an effective quality control system so as to be able to fulfill its obligations under the Contract Clause titled "Inspection of Construction". The Quality Control system shall consist of written plans and procedures and the necessary organization to meet the contract requirements. The system shall cover all contract operations and be keyed to the proposed work sequence. The site superintendent shall be a permanent employee of the prime contractor who shall be responsible for, and have the necessary authority, to maintain the quality of work on the job. The contractor shall replace the site superintendant at the direction of the Contracting Officer if, in the discretion of the Contracting Officer, the site superintendent has failed to ensure compliance with all material contract requirements. The site superintendent shall be responsible for all contract activities to include quality, scheduling, production, and safety. The site superintendent must have the full authority of the contractor to take any corrective actions necessary to ensure that the contractor, the contractor's employees, and subcontractors at any tier accomplish all work in compliance with the contract requirements. The site superintendent shall be physically present whenever contract work is ongoing. The contractor shall prepare and submit a Daily Report for each day of work. Reports for the previous day shall be delivered to the government no later than 0800 the following morning. 13. Submittals. Prior to the preconstruction meeting, the contractor will provide a proposed schedule which addresses equipment, methods, material disposal, and haul routes. The Accident Prevention Plan shall also be submitted. 14. Safety. The safety provisions as specified herein refer to the most recent edition of EM 385-1-1 to include any changes in place at the time of contract advertisement. The latest edition of EM 385-1-1 may be accessed at Accident Investigations and Reporting Accident Prevention Program Before initiation of work, an interim site specific, Accident Prevention Plan (APP) with appropriate appendices written in English by the Prime Contractor for the specific work and hazards of the contract, and implementing in detail the pertinent requirements of the most recent edition of EM 385-1-1, must be submitted reviewed and found acceptable by the COR. APPs shall be developed and submitted by the Contractor in the formats provided in Appendix A of the appropriate edition of EM 385-1-1. The Contractor shall address each of the elements/sub-elements in the outline contained in Appendix A in the order that they are provided in the Manual. If by the nature of the work an item is not applicable, the Contractor will so state and provide an explanation for why that element/sub-element is not applicable. The APP (including the interim-APP) will be developed by qualified personnel and will be signed in accordance with Appendix A.1 of EM 385-1-1. The Contractor shall be responsible for documenting the qualified person's credentials. The Contractor's APP will be job-specific and will include work to be performed by subcontractors and measures to be taken by the Contractor to control all hazards associated with the contract work. A Site Safety and Health Officer (SSHO) shall be provided at the work site at all times to perform safety and occupational health management, surveillance, inspections, and safety enforcement for the Contractor. The site shift project superintendent can be the SSHO on this project. The SSHO shall have a minimum of 5 years safety work on similar projects and have completed the 30 hour OSHA Construction safety class or equivalent within the last 5 years. . Contractor may begin work with an abbreviated Accident Prevention Plan approved by the COR. Within 10 days of receipt of award of the contract, four copies of the Accident Prevention Program shall be submitted to the Contracting Officer for review and approval. . Refer to EM 385- 1-1, Section 01.D. Accidents shall be investigated and reports completed by the immediate supervisor of the employee(s) involved and reported to the Contracting Officer or his/her representative immediately and the accident report submitted on Eng Form 3394 within one working day after the accident occurs. All data reported must be complete, timely and accurate. A follow-up report shall be submitted when the estimated lost time days differs from the actual lost time days. 15. Clean-up / Restoration. The contractor shall be responsible for clean-up of all work areas, including but not limited to curb to curb surface cleaning, sweeping of sidewalks, and raking of boulevards and private property. 16. Evaluation of Offers and Award of Contracts. The Government will evaluate offers on the basis of price, past performance, and schedule of performance. The Government intends to award a single contract in response to this solicitation to the technically acceptable offeror proposing the lowest overall evaluated price. The Government intends to make an award decision without discussions. ATTACHMENTS: City of Minot, ND - Emergency Levee Location Map - Public School Service Buildings; Minot Library and Minot City Hall and Ward County, King's Court and Rostad's Addition Minot Municipal Landfill - Concrete/Rubble, Sand-bag, and Clay Stockpile Location Map

More opportunities from Department Of Defense → W07V Endist St Paul

Same awarding agency

NAICS: 541930
New
Federal
FY27 ASL Interpretation Services for USACE MVP
Solicitation # W912ES27QA005
Solicitation W912ES27QA005 is a firm fixed-price contract for American Sign Language (ASL) interpretation services to support the U.S. Army Corps of Engineers (USACE) St. Paul District in Saint Paul, Minnesota. This opportunity is a total small business set-aside under NAICS code 541930. The period of performance runs from November 15, 2026, to November 14, 2027, and consists of two primary line items: 300 hours of interpretation services and one general job. The government will award the contract to the responsible offeror providing the most advantageous offer, with the primary evaluation factor being the lowest hourly rate. Award considerations include the total price of all options and risk assessments from the Supplier Performance Risk System regarding item, price, and supplier performance. Offerors must submit their quotes electronically through the PIEE Solicitation Module by November 13, 2026. Compliance requirements include adherence to the Buy American and Balance of Payments Program, the Service Contract Act for prevailing wages in Minnesota and Wisconsin, and various non-discrimination and safety standards. While there is conflicting guidance regarding the use of Wide Area Workflow (WAWF), the St. Paul District indicates that invoices should be submitted according to the Statement of Work. All inspection and acceptance of services will occur on-site at the St. Paul District Army Corps Engineer Centre.
Translation and Interpretation Services

POSTED

2 days ago

DEADLINE

in 13 days
View Details
NAICS: 541620
New
Federal
Phase I Environmental Site Assessment at Lower Grey Cloud Slough Islands
Solicitation # W912ES27QA010
Solicitation W912ES27QA010 is a firm fixed price contract issued by the U.S. Army Corps of Engineers, St. Paul District, for a Phase I Environmental Site Assessment (ESA) at the Lower Grey Cloud Islands. This procurement is a total small business set-aside under NAICS code 541620. The period of performance is scheduled from December 1, 2026, to May 1, 2027, with the final delivery of the assessment requested by May 1, 2027. The project requires the contractor to produce a draft and final ESA report in Microsoft Word format, adhering to USACE 1165-2-132 and ASTM E1527-21 standards, along with native electronic formats for all maps, figures, and geospatial shapefiles. The contract will be awarded based on the lowest price technically acceptable (LPTA) criteria, with the government evaluating the total price of the basic requirement and any applicable options. Key administrative requirements include active registration in the System for Award Management (SAM) and compliance with various FAR and DFARS clauses, including cybersecurity reporting, Buy American preferences, and prevailing wage laws. Inspection and acceptance will be managed by Tom Reinhardt at the St. Paul District office in Minnesota. Invoices are to be submitted to the Contracting Officer's Representative, though the solicitation contains conflicting instructions regarding the use of Wide Area Workflow (WAWF).
Environmental Consulting Services

POSTED

2 days ago

DEADLINE

in 11 days
View Details
NAICS: 334513
New
Federal
Industrial Variable Frequency Drives (VFDs)
Solicitation # W912ES26QA115
Solicitation W912ES26QA115, issued by the U.S. Army Corps of Engineers St. Paul District, is a total small business set-aside for the procurement of factory-new, commercial-off-the-shelf ABB ACS880 Series Variable Frequency Drives (VFDs). These units are required for critical operations on the Dredge Goetz, including the cutter head, main pump motors, ladder, swing, spud, and carriage drives. To ensure system compatibility and prevent unacceptable downtime, the government has issued a brand name justification limiting competition to ABB brand spares. The requirement consists of four line items: one 690V Drive Module (430A), one 500V Wall-Mounted Drive (302A), one 500V Wall-Mounted Drive (124A), and two 690V Drive Modules (721A), all featuring specific factory-installed plus-codes and technical specifications. The contract will be awarded as a single firm-fixed-price agreement to the responsible offeror providing the most advantageous price. All equipment must be 100 percent factory-new, meeting IEEE, UL, and CE standards, and must include a minimum 12-month warranty from commissioning or 18 months from delivery. Deliverables include a technical data package and a Certificate of Conformance. Items must be crated per ASTM industrial standards, moisture-barrier wrapped, and marked with permanent OEM nameplates and DoD unique identification per MIL-STD-130. Delivery is required by February 26, 2027, to the Civil Works Service Base in Fountain City, Wisconsin, with shipping costs included in the CLIN pricing. Offers must be submitted in PDF format via the PIEE Solicitation Module by the final deadline of November 9, 2026.
Instruments and Related Products Manufacturing for Measuring, Displaying, and Controlling Industrial Process Variables

POSTED

3 days ago

DEADLINE

in 9 days
View Details
NAICS: 332439
New
Federal
2-20 foot Containers with Gantry Beam and Chain Lift
Solicitation # W912ES27QA004
Solicitation W912ES27QA004 is a total small business set-aside for a firm-fixed-price contract to procure two brand-new 20-foot High Cube open-side storage containers for the U.S. Army Corps of Engineers. The containers require custom structural steel fabrication of a 1-ton capacity Load Handling Equipment crane and hoist system, featuring a 6-foot external extension and an internal counterweight system. Key technical requirements include a design safety factor of 5:1 per ASME B30 standards, PE-stamped structural calculations, and compliance with EM 385-1-1. All modified components must be coated in industrial Safety Yellow paint and the units must be marked with DoD Item Unique Identification in accordance with MIL-STD-130. The contractor is responsible for turnkey ground delivery to Fountain City, Wisconsin, with a final delivery deadline of March 1, 2027. Final acceptance is contingent upon a physical inspection and successful field demonstration by USACE staff, including a 125% proof load test and verification that the hoist traverses the full length of the gantry rails without binding. Offerors must submit technical descriptions, product data sheets, and drawings via the PIEE Solicitation Module. Evaluation will be based on technical acceptability, price consistency with historical data, and risk assessments conducted through the Supplier Performance Risk System.
Other Metal Container Manufacturing

POSTED

3 days ago

DEADLINE

in 4 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS