Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity was posted on September 30, 2013. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Removal of Sand Debris from the Bride Brook Channel at Rocky Neck State Park, Niantic, Connecticut

Closed
AG-1106-S-13-0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
Federal
RIO DE LA PLATA FLOOD CONTROL PROJECT, SUPPLEMENTAL CONTRACT 1 PROJECT LOCATION: DORADO AND TOA BAJA, PUERTO RICO
Solicitation # W51DQV26RA002
Solicitation W51DQV26RA002 is a full and open competition for a firm-fixed-price design-bid-build construction contract for the Rio de la Plata Flood Control Project, Supplemental Contract 1, located in Dorado and Toa Baja, Puerto Rico. Managed by the U.S. Army Corps of Engineers under NAICS code 237990, the project has an estimated magnitude between 250 million and 350 million dollars. The scope of work involves extensive river channel widening and modifications across approximately 1.6 miles, the construction of 3.1 miles of earthen levees, and the installation of four concrete culverts with pre-cast pipes and composite flap gates. Additional requirements include the relocation of water, sewer, and electrical utilities, scour protection, demolition of abandoned structures, and wetland mitigation. The estimated period of performance is 1619 calendar days following the receipt of the Notice to Proceed, though offerors are cautioned that all real estate rights for site access have not yet been obtained and will be secured prior to the full notice. Proposals must be submitted electronically via the Procurement Integrated Enterprise Environment portal. Awardees are required to provide payment and performance bonds equal to the total bid price within 10 days of award, and firms other than small businesses must submit a subcontracting plan per FAR Part 19. The project also requires the delivery of an operations and maintenance manual detailing procedures for restoring levee geometry after seismic events.
W2SR Endist Caribbean(provis)

POSTED

about 13 hours ago

DEADLINE

in 9 days

General Info

Agency

N/A

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

Rocky Neck Strate Park., NIANTIC, CT, USA

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseClosed
Posted

Presolicitation

Notice updated

The notice description changed.

Type Changed

Presolicitation → Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Alan B. LetaContract Specialist

Full Description

Show more
NOTE THIS IS AN AMENDMENT: PLEASE CHANGE PAGE 1 OF THE SOLICITATION PACKAGE. BLOCK 10, PLEASE FURNISH QUOTATIONS TO THE ISSUING OFFICE IN BLOCK 5a ON OR BEFORE CLOSE OF BUSINESS (Date) TO OCTOBER 4, 2013 @ 11:00 a.m. The United States Department of Agriculture (USDA) Natural Resources Conservation Service (NRCS) State Office at Tolland, Connecticut will solicit for Emergency Watershed Protection measures to relieve hazards and damages created by Hurricane Sandy on October 29, 2012. The work to be accomplished under this contract includes removal of sand debris from the blocked channel at Bride Brook, Rocky Neck State Park in East Lyme, Connecticut. Major items of work consist of sediment control, mobilization, traffic control, excavation, earthfill, and replace channel rock. The project is estimated to be between $100,000.00 and $250,000.00. A site visit will be conducted on September 5, 2013 at 10:00 a.m. at the Rocky Neck Park site. Interested parties must be registered in the System for Award Management (SAM) at https://www.sam.gov in order to be eligible for award of this contract. The solicitation package, construction drawings, and specifications will be posted and available from this site on or about September 4, 2013. Bid opening date is October 4, 2013.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS