Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Pre-Solicitation opportunity from Department Of Defense was posted on July 10, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Renovate 2nd Floor of Hangar 70 & Upgrade HVAC System

Closed
FA301617R0061Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236210
New
Federal
Building 215 Clean Room HEPA Filter Replacement
Solicitation # RFI-195000-26-00181
The National Institute of Standards and Technology is conducting market research through a Request for Information for the Building 215 Advanced Measurement Laboratory cleanroom repair and HEPA filter replacement project in Gaithersburg, Maryland. This initiative follows a previous solicitation that failed to produce an acceptable offer, prompting NIST to reassess its acquisition strategy and seek industry feedback on constructability, cost, and schedule feasibility. The project scope involves the modernization of an 1,800 square meter facility, including the replacement of approximately 1,200 HEPA filters, 70 VAV terminal units, and 54 airflow monitoring devices, as well as the installation of 32 exhaust air control valves and associated ductwork repairs, testing, and recertification. A critical component of the project is the proposed phasing plan, which aims to minimize research disruptions by utilizing 19 construction phases, including 18 critical cleanroom outage phases. Each critical outage is currently envisioned as a nine-day window starting Friday evening and requiring 24/7 operations to achieve ready-for-re-occupancy by the following Monday morning. NIST is specifically requesting rough-order-of-magnitude cost estimates and industry input on whether this aggressive outage schedule is realistic or if it creates prohibitive risks and costs. Responses, including company experience and recommendations for improving competition and project execution, are due by October 14, 2026.
Department Of Commerce Nist

POSTED

about 20 hours ago

DEADLINE

in 13 days
NAICS: 236210
New
SLED
Arrowhead Regional Medical Center Lot 1 Parking Structure
Solicitation # 2026010330
The County of San Bernardino is soliciting the construction of the Arrowhead Regional Medical Center Lot 1 Parking Structure located at 400 North Pepper Avenue in Colton, California. The project consists of a post-tensioned, cast-in-place structure spanning up to 500,000 square feet across six levels, providing up to 1,600 parking spaces. Key design elements include a finished exterior with an architectural mesh facade on the first floor, two banks of two elevators, and the installation of photovoltaic panels on the top level. The facility will be restricted to employees via badge access and will feature security enhancements such as LED lighting, emergency call boxes, security cameras, and locked gates. The project must comply with the California Building Code, the Americans with Disabilities Act, the 2022 California Building Energy Efficiency Standards (Title 24), and the California Green Building Standards Code (CALGreen) for electric vehicle charging stations. Environmental mitigation includes a landscape plan to offset the removal of approximately 51 trees. To maintain parking capacity during construction, a temporary surface parking lot will be operated at 1351 West Valley Boulevard with shuttle services provided to the campus. The project has undergone CEQA review, resulting in a Mitigated Negative Declaration confirming that the project will not have significant environmental impacts provided mitigation measures are implemented.
San Bernardino County

POSTED

1 day ago

DEADLINE

N/A

General Info

Contract Value

$544,438.2

NAICS

236210 - Industrial Building Construction

Place of Performance

Second Floor of Hangar 70 (North Side) Joint Base San Antonio-Randolph, SAN ANTONIO, TX, 78150, USA

Set-Aside

WOSB

Award Issued Date

Documents

21

Answers_to_Questions_at_Site_Walk_on_30_Jun_2017.docx

DOCX

Atach_11_Hazmat_Report.pdf

PDF

Atach_12_Recovered_Materials_Determination.pdf

PDF

Atach_1_Appendix_A_SpecificationsV2.pdf

PDF

Atach_1_Statement_of_Work_%28Version__2%29.docx

DOCX

Atach_1_Statement_of_Work_%28Version__3%29.docx

DOCX

Atach_1_Statement_of_Work.docx

DOCX

Atach_2_Wage_Determination.docx

DOCX

Atch_10_Project_Location.pdf

PDF

Atch_3_Unescorted_Access_Request.pdf

PDF

Atch_4__Financial_Information_Questionnaire.docx

DOCX

Atch_5_Contractor_Responsibility_Questionnaire.docx

DOCX

Atch_6_Cost_Estimate_BreakdownV3.pdf

PDF

Atch_7__HAZMAT_Letter.pdf

PDF

Atch_8_Progress_Schedule.pdf

PDF

Atch_9_Local_Information.pdf

PDF

Ceiling_Plan.pdf

PDF

FA3016-17-R-0061_AMENDMENT_0002.pdf

PDF

FA3016-17-R-0061_AMENDMENT_0003.pdf

PDF

RFP_16_Jun_2017.docx

DOCX

Signed_amendment_001.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

6 updates
PhaseClosed
Posted

Presolicitation

Notice updated

Response deadline changed from May 30, 2017 to Jul 17, 2017. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA3016 502 Cons Cl
Contacts2 people available
OfficeJBSA LACKLAND, TX, 78236-5286, USA
Office AddressJBSA LACKLAND, TX, 78236-5286, USA
Contacts
Edwin Dela CruzContract Specialist
Jon SandersContracting Officer

Full Description

Show more
The work includes all labor, materials, supplies, tools, equipment, supervision and all other items needed and necessary for the design and for the renovation of the 2nd floor and replacement of the HVAC system, Hangar 70, JBSA-Randolph. All work shall be accomplished in accordance with UFCs 1-200-01, 1-200-02, 3-520-01, NFPA 101, 70E, 70, 72, AFI 32-1065, and all other applicable codes and directives as may apply. The scope includes demolition and renovation work necessary to include but not limited to flooring, ceiling, painting of walls, ceiling, removal / replacement and repair of HVAC system with some demolition / replacement of duct work, controls, diffusers, grills and other components such as air handlers and condenser, re-configuration / replacement of lighting outlets, conduits, testing / remediation of lead based paint and asbestos in the work area. Consideration and determinations shall also be made concerning fire suppression and alarm systems. The Contractor shall conduct testing as necessary to support the design and construction effort and may include but is not limited asbestos and or lead based paint sampling/analysis, etc. All work shall be in accordance with JBSA general requirements to include color and historical schemas. The Contractor shall accomplish all tasks required for this project to provide a safe, fully functional, completely finished and operating system ready for immediate use by the Government. Design and work objectives include, but not limited to: (a) Relocation, securing of all equipment, incidentals and other times necessary for the renovation. (b) Determination of requirements and if required, installation of Fire alarm, detection, and suppression systems and/or components. Review of UFC 1-200-01, 3-600-01 and NFPA Code as a minimum is required. (c) Remove and demo existing floor tiles and raised floor, base, cove base, electrical circuits, receptacles and communications throughout the construction area. Prepare all floor areas for new finishes and provide and install all new flooring in office area (customer will pick color and style), similar to Karndean Loose Lay color (Stamford). (d) Demolish and replace all surface mounted conduits, wire molls, electrical and data communications outlets, raceways, cables, wiring, and devices such that are re-routed and flush mounted within walls, etc. Demolish existing electrical panel, provide, install and connect new 120/208V, amperage as designed, 20 circuit panel with 20A circuit breakers to supply power to this area. Provide new outlets as required, all circuits to be labeled on receptacle covers and panel. Design load is 16 amperes per circuit. (e) Demolish and replace cement and grid ceiling, replace with new 2'x4' grid ceil with lay-in tile, 2'x2' grid where currently in use, ceiling height to be approximately 8'. Remove and replace all existing lighting fixtures throughout the area, provide and install new recessed LED fixtures to present a centered equally spaced and uniform appearance with adequate lumens throughout the area. New lighting to have emergency battery packs to automatically supply illumination, to 1 lamp per required fixture, in the event of a power failure. At a minimum emergency lighting at each entry/exit door and adequate coverage for the larger area. (f) Demolish / replace existing fire alarm heat detectors with new fire alarm ceiling heat detectors and visual indicating devices in the construction area. New heat detectors and indicating devices shall be compatible with current system. (g) Prepare all wall surfaces, to include any fur outs, and all doors in the construction area. Patch and fill all voids and provide and apply new lite texture and make ready for painting. Apply one coat of primer and two coats paint throughout the project construction area to create a new finish. All paint shall meet all federal specification and all paint colors shall meet JBSA-Randolph color schemes. Some walls shall have accent paint in different colors as selected by customer. (h) Remove the existing HVAC unit and associated duct work, control, and other system components affecting the project area. Replace with new, properly designed and size unit, ducts, and controls, to include possible electrical upgrade requirements. Where duct work extends beyond the area of construction, components may be abandoned in placed. At point of abandonment, opening are to be closed up to prevent intrusion by birds, etc. Provide, install and connect compatible controls with the BASE EMCS for energy monitoring and control. NOTE: The above description of work is for the purpose of general information only and is not intended to include and describe every feature or item of work or to define the scope of work. THIS IS PRE-SOLICITATION SYNOPSIS, NOT A REQUEST FOR PROPOSAL. Any subsequent RFP will be made available electronically via the FedBizOpps (FBO) website (https://www.fbo.gov) on or about 30 May 2017. Offerors are responsible for routinely checking the FBO website for any possible solicitation amendments that may be issued. This notice does not commit the Government to award a contract. No collect calls or facsimile transmissions will be accepted. Any costs incurred as a result of a response to this announcement shall be borne by the firm and will not be charged to the Government for reimbursement.

More opportunities from Department Of Defense → FA3016 502 Cons Cl

Same awarding agency

NAICS: 811310
New
Federal
Aviation Support Equipment Load Testing
Solicitation # F2MT2M6146AQ01
This Sources Sought Notice, solicitation number F2MT2M6146AQ01, is a market research effort to identify qualified sources capable of providing aviation support equipment load testing and maintenance for the 433rd MXS/AMXS at Joint Base San Antonio-Lackland, Texas. The scope of work involves non-personal services including annual preventive maintenance inspections, load tests, certification, and both scheduled and unscheduled repairs to ensure the safe operation of aircraft support equipment. All services must adhere to OSHA Standards 1910 and 1926, ANSI Standards B30.16 and B30-5, and applicable Air Force Instructions and Technical Orders. Key deliverables include an initial annual preventive maintenance schedule, certification reports due within two workdays of completion, and repair estimates provided within 48 hours of an initial survey. Performance requirements specify that standard preventive maintenance must be completed and equipment returned within 48 hours of pickup, while approved repairs must be returned within three business days. Interested vendors must submit their response, including company details, CAGE code, and a statement of capability with product literature, to Dalwyn Corporan-Polanco by 10:00 AM CDT on October 20, 2026. This notice is for research purposes only and does not constitute a solicitation or a promise to issue one.
Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

POSTED

5 days ago

DEADLINE

in about 7 hours
View Details
NAICS: 238220
New
Federal
Brand Name or Equal - WaterFurnace Model: UBH015R for B3631 & B3635 - Turnkey Replacement
Solicitation # A070764SS
The 502d Contracting Squadron is conducting market research via a Sources Sought Synopsis to identify capable industry sources for the turnkey removal and replacement of 48 ceiling-suspended Dedicated Outside Air System Water-Source Heat Pumps at the JBSA Ft Sam Houston San Antonio Military Medical Center Dormitory Annex, specifically in buildings B3631 and B3635. The project is projected as a Firm-Fixed Priced Purchase Order under NAICS code 238220. The contractor must provide all personnel, equipment, and supervision to install units that meet strict technical specifications, including a 1.25-ton capacity, horizontal ceiling-plenum configuration, and the use of low-GWP refrigerants such as R-454B or R-32, as R-410A is strictly prohibited. A critical requirement is that replacement units must fit through existing access openings measuring approximately 3 feet 11.5 inches by 2 feet to avoid structural demolition. The scope of work includes the integration of the units into the central Building Automation System via BACnet IP/MSTP and the use of AHR/ISO 13256-1 certified water-to-refrigerant coaxial heat exchangers. Performance must be completed within 275 days of award. Interested respondents must provide company identification, SAM.gov certifications, and confirmation that technicians hold EPA Section 608 Universal Certifications. Small business prime contractors must also verify they can cover at least 51 percent of the contract cost with their own personnel. Responses are due by October 26, 2026, and must be submitted in PDF format with a maximum length of ten pages, excluding equipment cut sheets.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

6 days ago

DEADLINE

in 6 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS