Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity from Department Of Defense was posted on June 30, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Renovation of Bldg 1152, Camp Parks, CA

Closed
W91238-09-S-0181Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 12 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 12 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 12 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 12 hours ago

DEADLINE

in 10 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Camp Parks, CA., DUBLIN, CA, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W075 Endist Sacramento
Contacts2 people available
OfficeSACRAMENTO, CA, 95814-2922, USA
Office AddressSACRAMENTO, CA, 95814-2922, USA
Contacts
Rolando Z. CamerinoContract Specialist
Gregory L. TomContracting Officer

Full Description

Show more
This is a SOURCES SOUGHT NOTICE for a Market Research ONLY to determine the availability of potential small business firms for a potential small business category type set-aside. NO AWARD will be made from this Sources Sought. NO SOLICITATION, SPECIFICATIONS, OR DRAWINGS IS AVAILABLE AT THIS TIME; therefore, do NOT request a copy of a solicitation. Potential offerors having the skill, capabilities and bonding necessary to perform the described project are invited to provide feedback via email to Rolando.Z.Camerino@usace.army.mil. All responses will be used to determine the appropriate acquisition strategy for a potential future acquisition. Particularly, the purpose of this NOTICE is to gain knowledge of potential small business sources in the following categories: Certified 8a, Certified HUB Zone, and Service-Disabled Veteran-Owned Small Business (SDVOSB), for a Design Build, Bldg 1152 Renovation, Camp Parks, CA. The capabilities will be evaluated solely for the purpose of determining to Set-Aside for the Small Business Community or to conduct as an Unrestricted Procurement. Other than small businesses may respond to this NOTICE in the event the market does not indicate SB interest, however, preference will be given to the SB categories listed above. The government must ensure there is adequate competition among the potential pool of available contractors. This project is planned for advertising in July 2009 . The estimated cost range according to the DFARS 236.204 is between $ 1,000,000.00 to $ 5,000,000.00. The NAICS Code is 236220, the size standard is $33.5 million, and the Federal Supply Code is Z163 Construction of facilities/troop housing facilities. The duration of the project is 450 calendar days. Under Federal Acquisition Regulation (FAR)52.219-14, the concern will perform at least 15 percent of the cost of the contract, not including the cost of materials, with its own employees. Under FAR 52.236-1 The contractor shall perform on the site, and with its own organization, work equivalent to at least 20 percent of the total amount of work to be performed under the contract. PROJECT DESCRIPTION The objective of this work effort is to Renovate building 1152. This project is design build. The work effort shall include: Demolition: Furnish all labor, material, disposal, and all supervision necessary to perform the work on the above referenced project, all in accordance with all federal, state, local regulations providing this proposal be accepted with the clarifications and qualifications. Demo all drywall from ceiling and walls, shower stall, two closets and closet doors. Demo wiring to old fire alarm, existing ceiling grid and light fixtures. Removal of all asbestos wall material at each unit location approximately 8sqft ea. Removal of all insulation and lateral ductwork located in the hallways. Removal and disposal of 25,000 SQFT of VAT floor tile on the first and second floors. Removal and disposal of 200 Ln Ft of TSI that may be hidden behind the transite walls in the restrooms and the laundry rooms. Removal and disposal of 8,000 Sq Ft of Asbestos Transite walls and ceiling panels throughout the building including the 1st and 2nd floor interior stairwells, restrooms, janitor closets, land laundry room. Removal and disposal of 12,000 Sq Ft of Asbestos containing Roofing material. Daily air monitoring and final visual clearance on the exterior, final air clearances on the interior and written reports by a certified Asbestos Consultant (AECG, INC) is required. Full containments on interior and barrier ribbon and signs postings on the exterior of the building. Containments to remain in place on the interior location until air clearances pass on each floor. Compliance with Laws and regulations: The Contractor will comply with all federal laws and regulations pertaining to this contract. Contractor will use CSTC PARKS EPA # and CSTC PARKS will sign all manifest. Carpentry: Frame and cover with sheet rock all exposed walls and holes, tape and texture, Windows shall have 1" x 4" wooden sill, all walls to be light sanded. Rooms to be primed and painted one coat primer two coat of semi gloss finish. All walls to be knock down texture, all walls to be insulated. All sheet rock to have 5/8" sheet rock, all sheet rock around tub to be Green Board. Install inspection door under shower drain 16" x 16". Install new doors and hardware in bathroom. Doors & Frames Furnish and install the doors as follows: Install 64 new 2' 8" interior doors and frames, Exterior doors Fire doors (18) to be of a metal type, 10 doubles and 8 singles. Drywall repairs through out all the rooms, around the new units. Install new 2' x 4' standard ceiling grid with tiles, Approx. 5500 sq ft in the hallways. Cut and reframe all holes through the perimeter walls of the building. These holes will be modified to accept the new units. Frame in new 4" x 4" supports after the walls are cut open to receive the new units. All doors and frames will be replaced in like sizes. All frames will be KD metal thresholds, Metal doors shall be hollow 16 Ga., 1-3/4" with 20 minute rating and provided with rubber silencers. Wood doors shall have solid core with birch facing, 1-3/4" standard paint grade. All hinges shall be 4-1/2" x 4-1/2". Panic devices shall have mortise with thumb pieces with surface vertical rod, no exterior trim, and open back strike. All doors shall have kick plates. All exterior doors shall have a door sweep with weather- stripping at head and jambs. Note that all hardware shall have a satin/dull chrome finish. Hinges- primed for paint, full mortise, HD, ball bearing, per ANSI A 156.1 and NSI A 156.7. Provide 1.5 pair of hinges per door. All exposed hinges on exterior doors shall be non-removable pins. Door bumper- cast aluminum, floor type. Exterior doors and Stair well doors glazing shall be 8" x 22" vision panels with wire glass. Door closure shall be surface mounted, Norton 1700 series. Weather stripping at jambs and heads shall be surface applied metal strip with neoprene bulb. Double door seal leaves shall have pile-type stripping with aluminum strip backing complying with AAMA 701.2. Door bottom sweeps shall be extruded aluminum with neoprene seal. Threshold shall be extruded aluminum. Lockset: Passage latch sets, Schlage AL series. Panic devices, Von Duprin 99 series. Cipher lockset, mechanically operated push button units with master key bypass capability, and changeable by authorized key access. Keys cores shall be "C" type keyways. Electrical: Primary and Secondary Power Main breaker 150 AMPS 6 sub panels 50 AMPS 2 secondary panels 30 AMPS Fire alarm sub panel 30 AMP 240 volt (1) Secondary panel (Heat 240 Phase 30 AMP) (1) Power supply for fire alarm. Distribution panel powered from secondary panel. (2) Hot water heaters powered from 120 outlets in boiler room. Install 30 new standard 2' x 4' light fixtures to serve the hallways. Install eight sets of dual light switching to serve the hallways. Install 12 new emergency lights with exit signs to serve the hallway. The room units will all have surface mounted receptacles 208 volts, Single phase, 20 amp located not more than 2' away from the new HVAC units (inside each room). Replace all light switches, wall plugs and cover plates in all rooms. Install ceiling fans in each room with three way switches. Once at entrance and one at bathroom door. Install one heat lamp in bathroom ceiling with timer switch. Install wall mounted hair dryer and one GFCI convenience outlet above vanity. Install exhaust fan in bathroom with 100 CFM capacity vent, ducting to be 4" Bathroom, Wiring for heat lamp and hair dryer will run to separate junction boxes. Provide electrical service to all suites as required. Install three compact fluorescent down lights on side of mirror and two-sconce lights one on each side of window on one switch. Incandescent light bar over mirror, switched separately. Light switches will be three way. Fire alarm detectors to be relocated Plumbing: Plumbing in bathrooms Re-plumb drain plumbing from second floor bathroom Second floor unit shall b re-plumbed while ceiling is demolished Supply lines under building shall have handled ball valves All drain plumbing will be housed in wall between existing closet and bathroom All hot and cold water pipe will be M type copper; hot water pipe will be insulated Tub to be cast iron, sliding glass door aluminum frame with tempered glass Shower door to have single handle. Tub wall to be covered with cultured marble. Marble to be above tub door. Tub wall to have corner shampoo dish and soap dish. Tub long wall to have grab bar. Showerhead pulsating type. Install backing in wall for grab bar, Single sink will be installed in a cultured marble lavatory top Lavatory to have recessed facial and toilet tissue dispenser, Install vanity mirror over lavatory, Toilet Toilet elongated combination toilet shall be 12" (30.5cm) rough-in. Toilet shall have 11-1/8"(28.3cm) x9-1/2"(24.1cm) water area. Toilet shall be at comfort height. Toilet shall be 1.6 lgpf (6lpf) with Ingenium flushing system. Toilet shall have 2" (5cm) glazed trap way. Toilet shall include polished chrome trip lever. Toilet shall be ADA compliant with 16-1/2" (41.9cm) high bowl. Toilet shall have a seat. Seat shall be heavy weight and injection-molded of solid plastic. Seat shall be open front less cover for elongated bowl and feature large molded-in bumpers. External check hinges to be stainless steel post that stop seat 11 degrees beyond vertical. Use stainless steel hardware color to be white with white hinges. Lavatory The lavatory with back shall be 21-1/4" (54cm) in length, and 18-1/8" (46cm) in width. Lavatory shall be made of vitreous china. Lavatory shall be wall mounted with hangers. Lavatory shall have 4" (10.2cm) centers (K-2005), 8" (20.3cm) centers (K-2006), or single-hole (K-2007) drilling. Lavatory shall have overflow. Lavatory shall be ADA compliant. Lavatory shall be drilled for concealed arm carrier. Lavatory shall be white in color. Faucet Single -handle lavatory faucet with metal 50/50 waste assembly. Metal construction chrome plated " IPS connections. Pivot action lever style handle, temperature controlled through 180' degree arc on the handle travel. Aerator is limited to 2.2 gpm max (8.3L/min) non metallic/nonferrous and stainless steel material, can accommodate reversed piping and back-to-back installations. Shield cover isolators shall be ADA compliant and APMO/UPC listed, soft and pliant, smooth vinyl coated surface insulated with foam 1/8" thick. Interior closed cell foam shall be tested to ASTM-E-84 (fire rated not to exceed a flame spread rating of "10" and smoke density of "0"). Surface shall have non-abrasive, non- absorbent, easy to clean one piece U/V inhibited surface to prevent discoloration, with no hard protrusions and with antimicrobial properties. Isolators shall be attached to piping with dual fastening system of full-length 1" Velcro fastening strip and non-metallic, tamper resistant, self-locking, heavy duty US government approved clips, and have a continuous weep seam to provide for air circulation and drainage of leakage and condensate. The stop valve cover shall offer easy access to valve handle for service. Painting: Paint the entire interior and paint all exposed conduit on the exterior of the building. (One primer coat and two finish coats, color semi gloss) Flooring: RESILIENT SHEET FLOORING Provide Vinyl Sheet Flooring, nonlayered and nonbacked, 1.83 m wide, having a nominal total thickness of 0.080 in. (2.0 mm). The polyurethane-coated wear surface shall be composed of polyvinyl chloride resin, plasticizers, stabilizers, fillers, and pigments comprising a through-grain vinyl chip visual with pattern and color uniformly dispersed throughout the entire thickness. The design shall merge subtle color accents with a detailed, terrazzo-like image providing a monolithic appearance. Vinyl sheet flooring shall meet ASTM F 1913, "Standard Specification for Vinyl Sheet Floor Covering without Backing." Provide patterned vinyl weld rod intended for heat welding of seams. Color shall be compatible with field color of flooring. Provide transition/reducing strips tapered to meet abutting materials. Provide resilient edge strips of equal gauge to the flooring, vinyl or rubber composition, tapered or bull nose edge, with color to match or contrast with the flooring, or as selected by the Architect from standard colors available. Provide metal edge strips of required thickness to protect exposed edges of the flooring. Provide units of maximum available length to minimize the number of joints. Use butt-type metal edge strips for concealed anchorage, or overlap-type metal edge strips for exposed anchorage. Unless otherwise shown, provide strips made of extruded aluminum with a mill finish. Examine sub floors prior to installation to determine that surfaces are smooth and free from cracks, holes, ridges, and other defects that might prevent adhesive bond or impair durability or appearance of the flooring material. Inspect sub floors prior to installation to determine that surfaces are free from curing, sealing, parting and hardening compounds; residual adhesives; adhesive removers; and other foreign materials that might prevent adhesive bond. HVAC: The hallway ductwork to remain above the new T-Bar ceiling from Mechanical rooms. New registers required in hallways for heating only. Patch and Fire caulk all holes and penetrations. Cap off all (no longer in use) electrical and gas feeds back to approved receptacle's, Provide & install 68 PTAC (Package through the Wall), 208 volts, Single phase, 20 amp, 11,800 BTU Cooling, 10,600 BTU heat with a 2 KW Backup Electric heater. 1. Custom color - Architectural louvered condenser grill. 2. Wall Sleeve Insulated with weatherboard. 3. Condensate drain kit. 4. Insulated Nema, 20 amp, wall plug. 5. Freeze control. 6. LED Diagnostics. 7. 10.7 EER. 8. With Automatic Emergency heat. Complete Computer Aided Design Drawings Perform daily cleanup while the job is in progress Final clean up to be performed when the job is complete The Design portion must be accomplished by qualified, experienced, professional A-E multi-discipline firms. These A-E firms must be capable of: design analysis, planning, development, CADD, professional services, pre-design site-assessment, feasibility and concept studies, design, geotechnical investigations and reports, environmental investigations, studies, and reports, abatement and sampling, construction documentation, cost estimates, value engineering, life cycle costing, post design-shop drawing review, construction phase services, and construction administration. Additional services include but are not limited to: seismic design, topographic and boundary surveys to include mapping and analysis (including data collection and verification), historical and cultural resource investigations, design review, seismic analysis, design construction cost reconciliation, environmental testing, statement of work review, site surveys and evaluations, remediation design, and Environmental Protection Agency (EPA) compliance for hazardous materials such as petroleum products, automotive chemicals, asbestos, lead and radon. The contractor is also required to have expertise and knowledge of the design of Anti-Terrorism/Force Protection (AT/FP) requirements, security and communications systems, fire protection and life safety systems, and other technical services as may be required. All work must be performed by or under the direct supervision of licensed professional Architects or Engineers. AE disciplines required to comply with the above requirements include but are limited to, registered architect, registered civil engineer, registered electrical engineer, registered mechanical engineer, registered structural engineer, registered fire protection engineer, registered geo-technical (registered civil maybe acceptable if certified), registered environmental (registered civil maybe acceptable if certified), interior designer, landscape architect, community planner, certified environmental survey/design personnel, construction management CAPABILITY STATEMENT The following requests are designed to apprise the US Army Corps of Engineers, Sacramento District, of any prospective construction contractors' project execution capabilities. Please provide your response to the following. The submission is limited to 20 pages. 1) Offeror's name, address, point of contact, phone number, and e-mail address. 2) Offeror's interest in bidding on the solicitation when it is issued. 3) Offeror's capability to perform a contract of this magnitude and complexity and comparable work performed within the past 5 years - brief description of the project, customer name, timeliness of performance, customer satisfaction, and dollar value of the project) - provide at least 3 examples. 4) Offeror's type of small business and Business Size (Small Business, HUBZone, Service Disabled Veteran Owned and/or Small Business, 8(a)) 5) Offeror's Joint Venture information if applicable - existing and potential 6) Offeror's Bonding Capability in the form of a letter from Surety The Capabilities Statement for this sources sought is not expected to be a Request for Proposal or Invitation for Bid, nor does it restrict the Government to an ultimate acquisition approach, but rather short statements regarding the company's ability to demonstrate existing-or-developed expertise and experience in relation to the areas specified herein. Any commercial brochures or currently existing marketing material may also be submitted with the Capabilities statement. Submission of Capabilities statement is not a prerequisite to any potential future offerings, but participation will assist the Corps of Engineers in tailoring requirements to be consistent with industry capabilities. This synopsis is for information and planning purposes only and is neither to be construed as a commitment by the Government nor will the Government pay for information solicited. Respondents will not be notified of the results of the evaluation. After completing its analysis, the Government will determine whether to limit competition among 8(a), Service Disabled Veteran, HubZone or proceed with full and open competition as Unrestricted. Offers that do not meet all requirements or submit within the allotted time will not be considered. All interested contractors should notify this office in writing by email or mail by 5:00 PM Pacific Time on July 23, 2009. Submit response and information to: Mr. Rolando Camerino, CECT-SPK-A, Room. 878, US Army Corps of Engineers, Sacramento District, 1325 J Street, Sacramento, CA 95814 or Rolando.Z. Camerino@usace.army.mil.

More opportunities from Department Of Defense → W075 Endist Sacramento

Same awarding agency

NAICS: 237990
Federal
USACE SPK DB Construction - Natomas NPP Named Pumping Plants - Sacramento, CA
Solicitation # W9123826BA013
The USACE SPK is soliciting design-bid-build construction services for the renovation of three critical irrigation pumping stations—Elkhorn, Riverside, and Pritchard—located along the Garden Highway Levee in Sacramento, California. The project scope involves removing existing discharge piping that penetrates the levees and installing new piping that traverses over the levees to connect with landside irrigation canals. Additional requirements include levee excavation, backfilling, pavement restoration, and utility relocation. The estimated target price range for this effort is between $10,000,000 and $15,000,000, with a total period of performance of 1,095 calendar days from the date of the Notice to Proceed. This requirement is pursued through full and open competition without a set-aside, falling under NAICS code 237110. Eligible offerors must be registered in SAM and PIEE and provide a surety letter confirming bonding capability for a single action of at least $10,000,000. The contract is subject to the Davis-Bacon Act and EM 385-1-1 safety standards. Key administrative requirements include the use of the Resident Management System (RMS) for payment requests and the maintenance of a rigorous Quality Control program. Proposals must be submitted by November 3, 2026, and must include a completed SF 1442, bid guarantee, and a pre-award survey.
Other Heavy and Civil Engineering Construction

POSTED

13 days ago

DEADLINE

in 14 days
View Details
NAICS: 237990
Federal
USACE SPK DBB Construction - Sacramento River East Levee Contract 5 (SREL C5), Sacramento, California
Solicitation # W9123827X1CQR
The United States Army Corps of Engineers Sacramento District is conducting market research via Sources Sought Notice W9123827X1CQR for a potential levee repair and remediation project known as the Sacramento River East Levee Contract 5 (SREL C5). Located in Sacramento, California, the project involves remediating approximately 0.4 miles of levee segments south of downtown. The scope of work includes the construction of seepage and stability berms and buried curb walls, utility relocation and protection, soil management, and site restoration. The government estimates the construction value between $6,000,000 and $9,000,000, with an anticipated performance period of 411 calendar days from the Notice to Proceed. The government anticipates issuing a firm-fixed-price solicitation in mid-November 2026, with an intended award date in mid-February 2027. The requirement falls under NAICS code 237990 for Other Heavy and Civil Engineering Construction and Product Service Code Y1LC. Depending on the response from small business concerns, the acquisition may be set aside for small businesses under FAR 52.219-14 or competed full and open, in which case FAR 52.236-1 regarding self-performance would apply. Interested parties must submit a capability statement by 11:00 a.m. PT on October 23, 2026, detailing their experience with similar projects over the last six years and providing a surety letter to prove bonding capability.
Other Heavy and Civil Engineering Construction

POSTED

13 days ago

DEADLINE

in 3 days
View Details
NAICS: 541620
Federal
USACE Sacramento District (SPK) $47.2M Planning, Environmental, and Cultural Services (PECS) MATOC
Solicitation # W9123826RA024
The USACE Sacramento District is soliciting for a 47.2 million dollar Multiple Award Task Order Contract (MATOC) under solicitation W9123826RA024 for Planning, Environmental, and Cultural Services (PECS). This contract, categorized under NAICS code 541620, provides comprehensive support for civil works and military actions throughout the feasibility, design, construction, and operations and maintenance phases. The scope of work encompasses environmental planning and compliance, including NEPA and CEQA tasks, species and habitat surveys, air and noise assessments, and construction monitoring. Additionally, the contract covers cultural resources services, focusing on Section 106 compliance, NHPA, NAGPRA, and ARPA support, tribal consultations, the development of Memoranda of Agreement and Programmatic Agreements, and specific archival and curation requirements. Interested vendors are encouraged to attend a virtual industry meeting on September 15, 2026, at 11:00 AM Pacific Daylight Time via Microsoft Teams. To participate, vendors must submit a capability statement not exceeding four pages to the designated contracting email address prior to the meeting. The primary point of contact for this opportunity is Sean Summer, and the contract is managed by the Department of Defense through the USACE Sacramento District office located in Sacramento, California.
Environmental Consulting Services

POSTED

29 days ago

DEADLINE

N/A
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS