Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Renzulli

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Renzulli Estates project, managed by the City of San Diego, involves the development of a 40.56-acre site at 11495 Cypress Canyon Road. The scope of work includes a Community Plan Amendment, rezoning from Agricultural-Residential to various residential and open space designations, and the demolition of existing structures to facilitate the construction of 100 single-family homes and 12 multi-family affordable rental units. The project incorporates significant environmental protections, including the preservation of 24.47 acres on-site and 18.7 acres off-site within the Multi-Habitat Planning Area, as well as a boundary line adjustment to remove the development footprint from the MHPA. The project timeline spans from October 2024 through February 2029, progressing through phases of demolition, site preparation, grading, building construction, paving, and architectural coating. Comprehensive technical assessments have been conducted to ensure compliance with CEQA and local standards, covering geotechnical stability, storm water quality, public water and sewer capacity, air quality, and greenhouse gas emissions. Key safety and regulatory requirements include adherence to Cal-OSHA excavation standards, the implementation of a conceptual wildfire evacuation plan, and the posting of performance bonds to guarantee the success of a five-year biological maintenance and monitoring period. Additional requirements include the payment of Active Transportation In-Lieu Fees and CDFW environmental review fees.

General Info

40.56-acre San Diego site redeveloped into 112 homes with 43.17 acres preserved as open space.

Agency

California → City of San Diego

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

Cypress Canyon Road and Cypress Canyon Park Drive, CA, 92131

Set-Aside

NONE

Documents

(32)

Appendix E1 Preliminary Geotechnical Investigation Renzulli Estates

PDFgeotechnical-investigation

Notice of Preparation for Environmental Impact Report - Renzulli Estates

PDFnotice-of-preparation

Appendix I1 Storm Water Quality Management Plan for Renzulli Estates

PDFstorm-water-quality-management-plan

Appendix L2 Police Service Letter for Renuzulli Estates Project

PDFother

Appendix B2 Local Mobility Analysis for Renzulli Estates Project

PDFlocal-mobility-analysis

Appendix K Paleontological Resources Review - Renzulli Estates Project

PDFtechnical-report

Appendix M2 Public Sewer System Analysis for Renzulli Estates Project

PDFother

Appendix G4 Soil Management Plan for Cypress Canyon Project

PDFsoil-management-plan

Draft Environmental Impact Report for Renzulli Estates Community Plan Amendment

PDFenvironmental-impact-report

Appendix N Conceptual Wildfire Evacuation Plan for Renzulli Estates Project

PDFevacuation-plan

Appendix L1 Fire Service EIR Letter - San Diego Fire-Rescue Response

PDFfire-service-letter

Appendix G3 Phase II Environmental Site Assessment Part 5 VOC Analysis Report

PDFenvironmental-site-assessment

Notice of Completion for Renzulli Project SCH #2022040125

PDFnotice-of-completion

Appendix G3_Phase II Environmental Site Assessment_Part1

PDF

Appendix M1 Public Water System Analysis for Renzulli Estates Project

PDFwater-system-analysis

Appendix J Noise Technical Report for Renzulli Estates Project

PDFnoise-technical-report

Appendix L3 Fire Fuel Load Modeling Report for Renzulli Estates Project

PDFreport

Appendix D Biological Technical Report for Renzulli Estates Project

PDFbiological-technical-report

Appendix E2 Preliminary Geotechnical Investigation and Review March 2023

PDFgeotechnical-report

Appendix C Air Quality Technical Report for Renzulli Estates Project

PDFtechnical-report

Appendix G3_Phase II Environmental Site Assessment_Part4

PDF

Appendix M3 Waste Management Plan for Renzulli Estates Project

PDFwaste-management-plan

Appendix I2 Drainage Study for Renzulli Estates

PDFstudy

Notice of Availability for Draft Environmental Impact Report PRJ-0674401

PDFspecial-notice

SCH 2022040125 Renzulli Estates Environmental Impact Summary

PDFenvironmental-summary

Appendix H Negative Cultural Resources Letter Report for Renzulli Estates Project

PDFreport

Appendix G2 Phase I Environmental Site Assessment for 11495 Cypress Canyon Road

PDFenvironmental-site-assessment

Appendix G3_Phase II Environmental Site Assessment_Part3

PDF

Appendix G1 Community Health and Safety Plan for Cypress Canyon Project

PDFcommunity-health-and-safety-plan

Appendix B1 Vehicle Miles Traveled Analysis for Renzulli Estates

PDFvmt-assessment

Appendix F Greenhouse Gas Technical Report for Renzulli Estates Project

PDFtechnical-report

Appendix G3 Phase II Environmental Site Assessment Analytical Summary Report

PDFenvironmental-assessment-report

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Diego
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of San Diego
Office AddressN/A

Full Description

Show more
COMMUNITY PLAN AMENDMENT to the Scripps Miramar Ranch Community Plan to redesignate the site from Residential and Open Space to Low Density Residential and to downgrade the segment of Cypress Canyon Road along the project site frontage from a two-lane collector to a two-lane sub-collector; a REZONE from Agricultural-Residential (AR)-1-1 to Residential–Small Lot (RX)-1-2, Residential-Multiple Unit (RM)-2-4, and Open Space Residential (OR)-1-2; VESTING TENTATIVE MAP to create new legal lots; a SITE DEVELOPMENT PERMIT to develop within Environmentally Sensitive Lands; NEIGHBORHOOD DEVELOPMENT PERMIT for deviations related to building height, retaining wall height, and driveway widths; Multi-Habitat Planning Area (MHPA) BOUNDARY LINE ADJUSTMENT to remove the proposed development footprint from the MHPA and add in an equivalent area; RIGHT-OF-WAY VACATION of the existing paper right-of-way for Lakehurst Avenue within the off-site MHPA addition area. The project proposes the demolition of the existing residential unit and supporting structures, grading, and development of 100 single-family homes and 12 multi-family affordable units. In addition, the proposed project would preserve 24.47 acres on site within the MHPA, as well as 18.7 acres off site located east of Regents Road and west of Pocahontas Avenue. The project also includes landscaping, brush management, parking, access, and utility improvements. Allowable deviations from development standards are proposed related to building height, retaining wall, and driveway width. The approximately 40.56-acre project site is located at 11495 Cypress Canyon Road. The General Plan designates the site as Residential and Park, Open Space and Recreation. Per the Scripps Miramar Ranch Community Plan, the site’s land use designation is Residential and Open Space and the zone is AR-1-1. (ASSESSOR’S PARCEL NUMBER: 319-020-04-00.)

Similar Contracts

Same NAICS industry code

NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
Solicitation W9128A26BA002 is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District for maintenance dredging and revetted mole repair at the Haleiwa Small Boat Harbor in Oahu, Hawaii. The project scope includes mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material to an approved offshore site south of Oahu, and the repair of the revetted mole involving stone rework, vegetation removal, and the installation of best management practices. The estimated contract value ranges from 1 million to 5 million dollars, with a performance period of 200 calendar days from the receipt of the notice to proceed. This opportunity is set aside for HUBZone small businesses, who receive a 10 percent price evaluation preference. Key requirements include the provision of performance and payment bonds, adherence to the Davis-Bacon Act, and the appointment of key personnel including a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer. Acceptance of the dredging work is based on multi-beam hydrographic survey data, while stone revetment is subject to visual inspection for defects. Bids must be submitted as sealed physical offers by September 30, 2026, as electronic submissions are not permitted. Liquidated damages for delays are set at 2,297 dollars per calendar day.
Healy Tibbitts Builders, Inc.

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details
NAICS: 237990
New
SLED
WWRF Recycled Water Pond Erosion Prevention Project
Solicitation # W-335
The WWRF Recycled Water Pond Erosion Prevention Project, solicitation W-335, is a construction contract issued by the Western Municipal Water District for erosion control and slope stabilization at the Western Water Recycling Facility in Perris, California. The scope of work involves establishing a 2:1 slope configuration using riprap-filled HDPE bags and loose riprap, installing drainage improvements such as V-ditches and drop inlets, and installing railing along the Recycled Water Storage Pond and concrete-lined basin. The project is estimated at 1,500,000 dollars with a completion timeframe of 240 calendar days from the date of the Notice to Proceed. The contract will be awarded to the lowest responsive and responsible bidder. Bidders must submit their proposals electronically via the PlanetBids Procurement Portal by October 15, 2026, at 2:00 PM. Required submission documents include the complete bid forms package, bid bonds, a non-collusion declaration, a list of proposed subcontractors, and a certified data sheet for materials. The successful contractor must provide performance and payment bonds each equal to 100 percent of the bid amount and comply with California prevailing wage laws and Department of Industrial Relations registration requirements. Technical execution must adhere to the Greenbook standards, and the contractor is required to provide a written work plan and construction schedule.
Western Municipal Water District

POSTED

about 22 hours ago

DEADLINE

in 23 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS