REPAIR AIRCRAFT FIRE TRAINING FACILITY HOMESTEAD AIR RESERVE BASE (HARB) FL

Active
FA664825C0007P00002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract modification for the Aircraft Fire Training Facility at Homestead Air Reserve Base involves critical updates to the site's pumping infrastructure. The scope of work includes the demolition and disposal of a non-operational submersible pump, cleaning of the retention pond, and the construction of a new reinforced concrete foundation pad. Additionally, the project requires the installation of a new external pump system supported by professional engineering designs and NPSH calculations, as well as the installation of 50 linear feet of electrical conduit to integrate the system with the facility and the new Control Tower. The work is being awarded to the incumbent contractor, Guardian Construction, Inc., on a sole source basis to avoid operational delays and duplication of costs while ensuring system integration and warranty protection. This effort falls under a Small Business Set Aside and is managed by the Department of Defense.

General Info

Guardian Construction will update pumping infrastructure at Homestead Air Reserve Base via sole source.

Agency

Department Of Defense → FA6648 482 Lss LgcView Agency

NAICS

236210 - Industrial Building ConstructionView NAICS

Place of Performance

Homestead, FL, 33039, USA

Set-Aside

SBA

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

special-notice

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA6648 482 Lss Lgc
Contacts2 people available
OfficeHOMESTEAD AFB, FL, 33039-1299, USA
Organization / Agency
Department Of Defense → FA6648 482 Lss Lgc
View Agency Profile
Office AddressHOMESTEAD AFB, FL, 33039-1299, USA

Full Description

Show more

This modification will add necessary alterations to ongoing construction to the Fire Traininer facility.


1. Demolition & Site Preparation: Demolish and dispose of the existing in-pond non-operational submersible pump; drain the retention pond and clear accumulated algae/debris.
2. Civil Foundation: Construct a new on-land reinforced concrete foundation pad for the relocated external pump system.
3. Mechanical & Engineering: Furnish and install a new external pump system, including signed/sealed Professional Engineer (PE) design drawings and Net Positive Suction Head (NPSH) calculations.
4. Electrical & Controls: Trench and install approximately 50 linear feet of new electrical conduit and wiring, integrating the pump system into the Fire Training Facility and the new CNOT (Control Tower).


The incumbent contractor, Guardian Construction, Inc., is currently mobilized on-site performing comprehensive mechanical, structural, and control construction to the Fire Trainer under Contract FA664825C0007. Awarding this modification on a sole source basis is the only viable method to prevent unacceptable operational delays, substantial duplication of costs, and ensure warranty and integration into existing system.

Similar Contracts

Same NAICS industry code

NAICS: 236210
New
SLED
Design Build Precision Guided Munitions (PGM) Facility Nellis AFB
Solicitation # W912PL26RA022
The U.S. Army Corps of Engineers, Los Angeles District, is soliciting a single-phase, firm-fixed-price design-build contract for a Precision Guided Munitions (PGM) Facility at Nellis Air Force Base, Nevada. This competitive total small business set-aside project has an estimated magnitude between $10 million and $40 million. The scope involves the design and construction of a 14,685 square foot base facility with an optional additional 1,531 square foot maintenance bay. The high-bay facility will support missile and glide munitions assembly, disassembly, inspection, testing, and repair, featuring four drive-through work bays, a test cell for rocket motors, secure administrative spaces, and 2-ton overhead bridge cranes in each bay. Construction will utilize reinforced concrete, structural steel, and standing seam metal roofing, adhering to DoD Unified Facilities Criteria and explosives safety standards. The project requires a performance period of 730 calendar days from the Notice to Proceed. Key technical requirements include ICD/ICS 705 compliance for secure areas, specific cybersecurity protocols for facility systems, and the integration of an intrusion detection system, access control, and CCTV. Bidders must be CMMC Level 1 certified and provide a professional design team including a LEED accredited professional and an NCIDQ certified interior designer. Award will be based on a best-value tradeoff process evaluating price alongside five non-price factors: prime contractor past performance, lead design firm past performance, technical approach, management plan, and proposed schedule. Proposals are due by September 14, 2026.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 4 days
View Details
NAICS: 236210
New
Federal
Tinker AFB 2026 Multiple Award Construction Contract (MACC)
Solicitation # FA8137-26-R-0040
The Tinker Air Force Base 2026 Multiple Award Construction Contract (MACC), solicitation FA8137-26-R-0040, is a competitive Indefinite-Delivery Indefinite-Quantity (IDIQ) contract for general construction services. The contract supports a broad range of sustainment, maintenance, repair, alteration, and renovation projects for real property facilities at Tinker AFB, Oklahoma. The scope includes three execution methods: Design-Build, Construction with Limited Design, and Construction Only. The MACC has a total aggregate maximum value of 950 million dollars and is structured with an initial five-year ordering period beginning March 26, 2027, followed by a five-year option period. The procurement is a partial small business set-aside under NAICS 236210. Award decisions are based on the Highest Technically Rated Offeror (HTRO) methodology, where candidates must meet a Minimum Technical Threshold Rating (MTTR) of 8,190 points for Appendix C or 7,140 points for Appendix D. Evaluation focuses exclusively on technical experience, including construction and design history, certifications, and staffing, with no cost evaluation performed at the IDIQ level. Contractors are required to provide 100 percent performance and payment bonds for task orders and must adhere to strict TAFB facility standards, safety regulations, and cybersecurity requirements. Proposals must be submitted electronically to the designated MACC Workflow Org Box, and all offerors must maintain active registration in the System for Award Management.
FA8137 Afsc Pzioc

POSTED

about 13 hours ago

DEADLINE

in 15 days
View Details
NAICS: 236210
New
Federal
Building 215 Clean Room HEPA Filter Replacement
Solicitation # RFI-195000-26-00181
The National Institute of Standards and Technology is conducting market research through a Request for Information for the Building 215 Advanced Measurement Laboratory cleanroom repair and HEPA filter replacement project in Gaithersburg, Maryland. This initiative follows a previous solicitation that failed to produce an acceptable offer, prompting NIST to reassess its acquisition strategy and seek industry feedback on constructability, cost, and schedule feasibility. The project scope involves the modernization of an 1,800 square meter facility, including the replacement of approximately 1,200 HEPA filters, 70 VAV terminal units, and 54 airflow monitoring devices, as well as the installation of 32 exhaust air control valves and associated ductwork repairs, testing, and recertification. A critical component of the project is the proposed phasing plan, which aims to minimize research disruptions by utilizing 19 construction phases, including 18 critical cleanroom outage phases. Each critical outage is currently envisioned as a nine-day window starting Friday evening and requiring 24/7 operations to achieve ready-for-re-occupancy by the following Monday morning. NIST is specifically requesting rough-order-of-magnitude cost estimates and industry input on whether this aggressive outage schedule is realistic or if it creates prohibitive risks and costs. Responses, including company experience and recommendations for improving competition and project execution, are due by October 14, 2026.
Department Of Commerce Nist

POSTED

3 days ago

DEADLINE

in about 1 month
View Details

More opportunities from Department Of Defense → FA6648 482 Lss Lgc

Same awarding agency

NAICS: 611430
New
Federal
Mastering Emotional Intelligence Facilitator Certification and Participant Materials
Solicitation # FA6648-22
Solicitation FA664826Q0013 is a Request for Quotation for a brand name acquisition of proprietary Emotional Intelligence Train-the-Trainer materials and certifications from TalentSmart, Inc. This procurement is a 100 percent Total Small Business Set-Aside under NAICS code 611430. The requirements include facilitator certifications for levels 1 and 2, online appraisals, and 50 participant kits containing physical learning materials and books. The award will be a Firm-Fixed-Price purchase order granted to the responsible offeror based on the Lowest Price Technically Acceptable methodology, provided they pass the technical evaluation by offering authentic TalentSmart products. Amendment 01 officially extends the quotation submission deadline from September 9, 2026, to September 11, 2026, at 9:00 AM EDT. Offerors must submit their quotations via email to Viviane Filias and must include a signed Amendment 01 Acknowledgment Form to avoid being deemed non-responsive. Delivery of all items is required within 30 calendar days after contract award to Homestead Reserve Base in Florida. Additionally, vendors must be registered in SAM.gov with an active CAGE code and provide a standard commercial warranty covering physical supplies, digital functionality, and certification recognition.
Professional and Management Development Training

POSTED

1 day ago

DEADLINE

in about 12 hours
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS