Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on July 15, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Repair Anchorage Bar Assemblies

Awarded
W912EK-16-T-0044Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 811310
New
Kubota M8200 Clutch Replacement
Solicitation # kubota-m8200-clutch-replacement
Management & Training Corporation (MTC) is soliciting bids for the clutch replacement of a Kubota M8200 tractor with front wheel assist, no cab or loader, located at the Earle C. Clements Job Corps Center in Morganfield, Kentucky. The contractor is responsible for providing all transportation, labor, supervision, tools, and new manufacturer-specified parts required to diagnose and repair the clutch assembly and power take-off (PTO) system. The scope of work includes disassembling the tractor, replacing friction discs, bearings, oil seals, and O-rings, resurfacing the flywheel, and replacing necessary hydraulic pipes and filters. Final acceptance is contingent upon the Facility Maintenance Department verifying proper clutch engagement and PTO operation under load. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Interested bidders must submit a bid sheet, a completed supplier packet including IRS Form W-9 and self-certification, and proof of insurance to Angie Mahoney by November 3, 2026, at 3:00 PM CST. Award will be based on best value. The contract is subject to various federal regulations, including Service Contract Labor Standards under Wage Determination No. 2015-4687 Revision 31 for Kentucky, and FAR clauses regarding equal opportunity, combating trafficking in persons, and restrictions on foreign purchases.
Earle C. Clements Job Corps Center

POSTED

about 9 hours ago

DEADLINE

in 6 days
NAICS: 811310
New
SLED
IFB 26C091005 - Hangar Door Hydraulic System Upgrade Services - CHP Academy Special Weapons and Tactics (SWAT)
Solicitation # 26C091005
The Department of the California Highway Patrol (CHP) is soliciting bids for Invitation for Bids (IFB) 26C091005 to perform a complete hydraulic system upgrade for two hangar doors at the CHP Academy SWAT facility in West Sacramento, California. The scope of work requires the contractor to provide all labor, materials, and equipment, including the installation of hydraulic power units, heavy-duty cylinders, rebuild kits, high-pressure hoses, and climate-appropriate fluid. The anticipated period of performance is from January 1, 2027, to June 30, 2027. A mandatory site walk-through was scheduled for November 9, 2026, and the final response deadline is November 23, 2026. The contract will be awarded to the lowest responsive and responsible bidder. A critical requirement is a minimum of 5% Disabled Veteran Business Enterprise (DVBE) participation, though incentives are available for higher participation levels. Bidders must comply with California prevailing wage laws, the Americans with Disabilities Act, and various safety and building codes. Depending on the final contract value, performance and payment bonds may be required for amounts exceeding 10,000 and 25,000 dollars, respectively. Submission requires a physical bid package containing specific certifications, including the Bidder Declaration, Non-Collusion Affidavit, and California Civil Rights Certification.
Department of the California Highway Patrol

POSTED

about 13 hours ago

DEADLINE

in 25 days

AI Contract Overview

Show more

This contract requires the refurbishment of six anchorage bar assemblies for the US Army Corps of Engineers Mississippi River Project Office. The scope of work includes transporting the assemblies from Pleasant Valley, Iowa, to the vendor's facility for disassembly, cleaning, and inspection. The vendor must perform dye penetrant testing and weld build-up or re-machining on damaged threads and eyelets in accordance with the AASHTO/AWS Bridge Welding Code. Following repairs, non-threaded surfaces must be sandblasted to white metal and coated with a specific gray vinyl paint system. The vendor is responsible for final assembly using government-provided gudgeon pin bushings and anti-seize grease, as well as all protective packaging and delivery. Strict security requirements are in place, including mandatory E-Verify pre-screening for all personnel. The project follows a tight timeline, requiring the first four assemblies to be completed within 15 calendar days of the award, with the remaining two assemblies completed at a rate of seven additional days each.

General Info

Agency

N/A

Contract Value

$41,000

NAICS

811310 - Commercial and Industrial Machinery and Equipment (except Automotive and Electronic) Repair and Maintenance

Place of Performance

IA, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseAwarded
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts

Full Description

Show more
Performance Work Statement - SCOPE OF WORK: REFURBISH SIX (6) ANCHORAGE BAR ASSEMBLIES (w/ Options). *Note: New gudgeon pin bushings for each assembly, will be provided by the Government. A. Transport six anchorage bars from the Mississippi River Project Office (MRPO) - Service Base in Pleasant Valley, IA to the vendor's facility. B. Disassemble the seized 6 inch diameter threaded eye-bars from the sleeve nut. Note - care must be taken by the vendor to ensure that the method of disassembly shall not cause the physical integrity of the bars or nuts of each assembly to be weakened or compromised by bending, twisting, or overheating of the steel members. *Note - care shall be take not to overheat metal surfaces to more than dull gray. C. REFURBISHMENT OF THREADED PORTIONS OF THE ASSEMBLY 1) Clean and inspect the threaded ends of bars and sleeve nuts. 2) Dye penetrant test (PT) the threaded ends of the bars and sleeve nuts to inspect for base metal discontinuities such as cracks. Inspect in accordance with (IAW) Reference "A" (AASHTO/AWS D1.5M/D1.5:2010 Bridge Welding Code, 6th Edition). Before proceeding to subsequent steps, provide inspection reports to the Contracting Officer or Government representative. 3) Weld build-up and re-machine (as necessary) any damaged threads on the bars or sleeve nuts IAW Reference "A" (AASHTO/AWS D1.5M/D1.5:2010 Bridge Welding Code, 6th Edition) and enclosed Contract Reference Drawings. 4) Post weld / machining dye penetrant (PT) inspection. Conduct PT inspection of all areas welded and/or machined IAW Reference "A" (AASHTO/AWS D1.5M/D1.5:2010 Bridge Welding Code, 6th Edition) and enclosed Contract Reference Drawings. Before proceeding to subsequent steps, provide inspection reports to the Contracting Officer or Government representative. D. REFURBISHMENT OF EYELET PORTIONS OF THE ASSEMBLY 1) Clean and inspect eyelets of each anchorage bar assembly. 2) Non-destructive / Dye penetrant test (PT) the threaded ends of the bars and nuts for base metal discontinuities such as cracks in accordance with Reference "A" (AASHTO/AWS D1.5M/D1.5:2010 Bridge Welding Code, 6th Edition) and enclosed Contract Reference Drawings. Before proceeding to subsequent steps, provide inspection reports to the Contracting Officer or Government representative. 3) Weld build-up and re-machine (as necessary) damaged eyelets to dimensional requirements IAW Reference "A" (AASHTO/AWS D1.5M/D1.5:2010 Bridge Welding Code, 6th Edition). 4) Post weld / machining dye penetrant (PT) inspection. Conduct PT inspection of all areas welded and/or machined IAW Reference "A" (AASHTO/AWS D1.5M/D1.5:2010 Bridge Welding Code, 6th Edition) and enclosed Contract Reference Drawings. Before proceeding to subsequent steps, provide inspection reports to the Contracting Officer or Government representative. E. Sandblast and paint all non-threaded surfaces of the anchorage bars and nuts in accordance with Encl. "A" (Corps of Engineers 5-E-Z system, Para. 3.2.10 and 3.3.10). The coating system shall be a spray-applied vinyl paint system equivalent to USACE 5-E-Z system, with the final coat gray in color. All painting shall be performed in accordance with SSPC-PA 1. The base metal shall be blasted to white metal prior to paint application in accordance with SSPC-SP 5. The first coat shall be a zinc-rich vinyl primer. The total dry thickness of the completed system shall average a minimum of 7.0 mils, and the minimum thickness at any point shall be 5.5 mils. Dry film thickness shall be verified in accordance with ASTM D7091 and documented by the contractor. The contract reference drawings indicate areas that should be masked off during painting to allow future welding by others. Mask off rear anchorage pin bore. F. Lubricate threads with anti-seize grease prior to final assembly. *Note - Recoating the threads with electrodeposted cadmium will NOT be required, as shown in the drawing. G. Assemble all anchorage bar components, including bushings and associated hardware, to dimensional requirements as shown in the contract reference drawings prior to shipment. H. Packaging and Delivery: The contractor will provide all packaging and shipping. Refurbished assemblies shall be delivered in protective wrap to avoid damage to exposed threaded portions. The contractor shall provide wooden blocking to stack the assemblies for both transporting and staging locations. Approximate weight of each assembly is 1,800 to 2,000 pounds. SECURITY Pre-screen candidates using E-Verify Program. The Contractor must pre-screen Candidates using the E-verify Program website (http://www.uscis.gov/e-verify) to meet the established employment eligibility requirements. The Contractor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. Documentation of company enrollment in E-verify, via a print screen of the company profile within the E-verify system, must be submitted to the Security Office no later than 3 business days after the initial Notice to Proceed. *When contracts are with individuals, the individuals will be required to complete a Form I-9, Employment Eligibility Verification must be given/coordinated with the designated Government representative. This Form will be provided to the Security Office after Notice to Proceed is given. To protect the privacy of the Contractor, all Contractor employees, and all sub-contractor employees, background checks, OPSEC SOPs, E-verify, and I-9 forms shall be submitted with a coversheet stating the contract number (e.g. W912EK-15-C-XXXX), title of project, and the company's point of contact information, in a sealed envelope/container and mailed to: Security Office U.S. Army Corps of Engineers Rock Island District 1500 Rock Island Drive Rock Island, IL 61201 POC / coordination: Work will be coordinated by Jim Frederickson, +1 (555) 000-0000. Invoices: to be submitted via email to contact@example.gov. Please ensure that your invoice reflects the company name(s) and physical address listed on your System for Award Managemnt (SAM) registration. Required Completion Date: Base award: four (4) anchorage bar assemblies shall be completed (including delivery) within 15 calendar days after award of contract. Remaining two (2) anchorage bar assembly will be allotted 7 additional calendar days, per assembly, to complete. Options will be allotted the same completion rate. Invoices - are to be submitted via email to contact@example.gov. Requested by: US Army Corps of Engineers Mississippi River Project Office 25549 182nd Street Pleasant Valley, IA 52767 CLOSED FOR BUSINESS FRIDAY-SUNDAYS. Questions can be addressed to Jim Frederickson, Engineering Technician, at +1 (555) 000-0000. References: AASHTO/AWS D1.5M/D1.5:2010 (Bridge Welding Code, 6th Edition) SSPC-PA 1 (Shop, Field, and Maintenance Painting of Steel) SSPC-SP 5/NACE No. 1, (White Metal Blast Cleaning) ASTM D7091 (Standard Practice for Nondestructive Measurement of Dry Film Thickness of Nonmagnetic Coatings) Enclosures: Unified Facility Guide Specifications - UFGS 099702 Contract Reference Drawing - Miter Gate Anchorage Parts (split and standard nut configuration)

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS