Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Repair & Maintain Airfield Stormwater System Phase II

Active
FGWB210002ABFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This contract involves the repair and maintenance of stormwater drainage systems east of Taxiway 'J' at Dobbins Air Reserve Base in Marietta, Georgia, focusing on areas where slopes have failed or been disturbed by previous repairs. The scope includes regrading these slopes, applying sod for stabilization and positive drainage, and addressing maintenance for basins III, IV, and V on the airfield. Additionally, the project requires cleaning existing flumes, pipes, and swales to restore proper drainage patterns, along with the installation of new concrete flumes at various locations to prevent erosion and standing water. The contract is a firm-fixed-price, total small business set-aside under NAICS code 237110, with an estimated value between $10 million and $25 million, and a period of performance of 420 calendar days. The solicitation is scheduled to be posted in mid-March 2026, with bid submissions due by the end of April 2026. Contractors must be registered in the System for Award Management and are restricted to U.S.-based entities. The Department of Defense, specifically the 94th Contracting Flight located at Dobbins ARB, manages the contract, with primary contacts provided for coordination and inquiries. The project is critical for ensuring proper stormwater management on the airfield, preventing further erosion, and maintaining airfield operability.

General Info

Repair and maintain stormwater drainage, regrade slopes, install concrete flumes, $10-25M, 420 days.

Agency

Department Of Defense → FA6703 94TH Contracting Flight PkView Agency

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Marietta, GA, 30069, USA

Set-Aside

SBA

Documents

(1)

Pre-Solicitation Notice for Repair & Maintain Airfield Stormwater System Phase II at Dobbins ARB

PDF1 pagepresolicitation

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhasePresolicitation
Posted

Presolicitation

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA6703 94TH Contracting Flight Pk
Contacts2 people available
OfficeDOBBINS AFB, GA, 30069-4900, USA
Organization / Agency
Department Of Defense → FA6703 94TH Contracting Flight Pk
View Agency Profile
Office AddressDOBBINS AFB, GA, 30069-4900, USA

Full Description

Show more

While not all inclusive, this project encompasses the work necessary to repair the stormwater drainage systems east of Taxiway 'J' on Dobbins ARB. Areas where the slopes have failed or where they have been disturbed from previous repairs will be regraded and have sod applied to obtain stabilization and positive drainage. Work shall include all maintenance items identified in basin III, IV, and V on the airfield. In addition to the work associated with correcting the grades around the airfield, the cleaning of existing flumes, pipes, and swales is required to reestablish proper drainage patterns. New concrete flumes will be installed at various locations throughout the airfield to reestablish positive drainage and prevent future erosion and standing water.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Federal
Drainage Pipe Replacement Project for Alchesay NFH
Solicitation # 140FGA26Q0055
This contract opportunity is a Small Business Set-Aside under NAICS code 237110 for the replacement of approximately 305 linear feet of 30-inch PVC pipe at the Alchesay National Fish Hatchery in Whiteriver, Arizona, along with video inspection of two upstream pipe sections totaling 425 linear feet. The project is being procured as a Firm-Fixed Price contract using the Lowest Price Technically Acceptable evaluation method, with award contingent upon meeting all technical requirements at the lowest cost. All work must be completed within 75 calendar days of award, and the contractor must coordinate with the hatchery to provide three days’ advance notice prior to any pipe isolation due to ongoing operations. Video inspection deliverables must adhere to strict technical standards, including continuous, uninterrupted MPEG-4 or WMV recordings at 24 fps with a minimum resolution of 352x240, full metadata labeling, and accurate footage counters, with submissions limited to a single CD or DVD per video segment. The contractor is required to provide 100% Payment and Performance Bonds, submit a baseline construction schedule and schedule of values prior to work commencement, and deliver as-built drawings reflecting all field changes. Offerors must be registered in SAM.gov and certified as small businesses under the $45 million size standard, with no other socioeconomic preferences specified. The government will not provide equipment or materials, and the contractor must assume all existing pipe is asbestos-cement until proven otherwise. A mandatory site visit is scheduled for August 19, 2026, and the complete solicitation will be released on or around August 12, 2026, with proposals due by September 18, 2026, submitted electronically through SAM.gov. The Procuring Contracting Officer is Justine Coleman, based in Falls Church, Virginia, with the Contracting Officer’s Representative to be determined post-award.
Gaoa Fws

POSTED

1 day ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
Federal
Design-Bid-Build (DBB) Repair of Storm Sewer Water and Sanitary Sewer Systems, Caserma Miotto, Longare, Vicenza, Italy.
Solicitation # W912PF26RA011
This construction project at the Miotto Military Installation in Longare, Vicenza, Italy, is a Design-Bid-Build effort to remediate critical failures in the stormwater and sanitary sewer systems to achieve environmental compliance and mitigate flood risks. The scope requires comprehensive repairs, upsizing, and decoupling of cross-connected sewer lines to ensure independent discharge pathways, along with extensive site restoration driven by recent storm damage including soil erosion and landslide vulnerabilities. Key work includes installing a new underground TOC pipe to directly connect to the Bisatto River using established rights-of-way, constructing a stormwater lamination tank beneath a municipal sports field in accordance with Italian Genio Civile regulations, and replacing the field’s surface with synthetic turf over the tank. Additional features involve integrating natural stormwater management elements such as sedimentation tanks, retention ponds, and weir walls to slow and control runoff before discharge. The project includes optional scope items for asbestos pipe removal, landslide area stabilization, and sedimentation pond installation, each as separately priced line items. All work must adhere to U.S. Department of Defense Unified Facilities Criteria including UFC 1-200-01 for building standards, UFC 1-200-02 for sustainable design, and UFC 3-560-01 and UFC 3-600-01 for electrical safety and fire protection, while also complying with CSI MasterFormat and UFGS specification frameworks. Construction must follow a strict five-day work week with weekends and holidays excluded, and traffic on internal roads must remain accessible at all times with alternate one-way flows and sensor-equipped traffic lights. The contract has an estimated performance period of approximately three years, with phase one requiring all external works to commence and complete between September 2026 and September 2027 as mandated by local Italian authorities. Submission of detailed documentation is mandatory, including a visual review report, clash detection report, record model with as-built drawings, and a professionally sealed specification cover sheet. All technical data must be fully legible and consistent with manufacturer documentation, and system sensors and thermostats must be accurately reflected on as-built records. Quality assurance requires the contractor to maintain a Design Quality Control plan meeting professional engineering standards, while the government retains the right to audit submittals without relieving the contractor of responsibility for contract compliance. Final acceptance is contingent upon certification and testing as required by Italian law, with revisions to submitted data needing completion within 30 calendar days. Compliance with stringent security protocols includes restricted information disclosure,
0414 Aq Hq Contract Augmented

POSTED

1 day ago

DEADLINE

in 8 days
View Details
NAICS: 237110
New
Federal
Y1NE| SOLICIATION | 36C25626R0015 | CONSTRUCT NEW WATER STORAGE FACILITY
Solicitation # 36C25626R0015
This contract is a firm-fixed price construction solicitation set aside exclusively for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under the Veterans’ First Public Law 109-461, issued by the Department of Veterans Affairs through Network Contracting Office 16. The project requires the construction of a new water storage facility and demolition of existing facilities at the Veterans’ Health Care System of the Ozarks in Fayetteville, Arkansas, with a period of performance of 330 calendar days from the Notice to Proceed. The total estimated contract value ranges between $10 million and $20 million, and the North American Industry Classification System (NAICS) code 237110 applies, with a small business size standard of $45 million in average annual receipts over the past three years. All offerors must be verified as SDVOSBs in the SBA’s VetCert system, registered in SAM.gov, and have completed all required Representations and Certifications prior to proposal submission. Compliance with VA specifications, federal and state regulations including OSHA, EPA, NFPA, NEC, ASHRAE, LIFE SAFETY CODE, UBC, and ADA standards is mandatory, and work must be performed without disrupting medical center operations. A single site visit was conducted on June 17, 2026, and no additional visits will be scheduled. RFI submissions were due by June 25, 2026, and proposals are due by August 20, 2026, at 4:00 p.m. Central Time. Proposals must be submitted electronically via email to madeline.allison@va.gov, contain no more than two attachments—one for each of two required volumes—and must not exceed 15 MB in size. Volume I, limited to 15 pages plus a cover page, must detail past performance and is weighted significantly more than price in the evaluation process; Volume II must include the fully completed SF-1442 form, a CLIN #1 price breakdown, and a properly executed SF-24 bid bond. Offers must include a 90-day proposal acceptance period, and no alternate proposals will be considered. A performance and payment bond are required upon award, along with general liability insurance without asbestos exclusions. All materials must be delivered in original manufacturer packaging with complete labeling, and contractor personnel must comply with VAAR 852.204-72 Personnel Vetting and Credential
256-NETWORK Contract Office 16 (36C256)

POSTED

1 day ago

DEADLINE

in 12 days
View Details
NAICS: 237110
New
Federal
Y--Rehabilitate the Polebridge Water System, Glacier
Solicitation # 140P1426R0013
The Department of the Interior’s Northern Rockies Major Acquisition Office is preparing to solicit construction services to rehabilitate the Polebridge Water System within Glacier National Park under solicitation number 140P1426R0013. This initiative, currently in the market research and pre-solicitation phase, is anticipated to be issued as a firm-fixed-price contract with an estimated value between $1 million and $5 million and is structured as a total small business set-aside under NAICS code 237110. The scope of work includes constructing a new public water system featuring an infiltration gallery, water storage tank, and service lines to connect four housing units and two administrative buildings to potable water service. Additional infrastructure requirements involve installing a programmable logic controller, pump control panel, pump protection system, tank monitoring system, and fiber optic lines to five buildings, while the existing chlorination treatment system will remain unchanged. The projected period of performance is from October 15, 2026, through June 30, 2027, with performance occurring entirely at Glacier National Park. Contractors interested in participating must be registered in the System for Award Management with an active Unique Entity Identifier and must qualify as a small business in accordance with FAR Part 19. The government has requested capability statements from small business contractors including details on firm name, address, phone, email, UEI, business size under NAICS 236220, SAM registration status, bonding capacity, relevant experience on similar federal construction projects, technical capability in underground utilities and water systems, and a statement of interest in future bidding. Responses to the sources sought notice were due by March 19, 2026, and must have been submitted via email in PDF format not exceeding five pages. The formal solicitation is anticipated to be posted on SAM.gov in mid-June 2026, with a response deadline of August 14, 2026. Point of contact for inquiries is Stacy Vallie of the Department of the Interior, reachable at Stacy_Vallie@ios.doi.gov or 406-404-4167, with the office located in Yellowstone National Park, Wyoming. All documentation will be accessible exclusively in electronic PDF form through SAM.gov, and no paper copies will be distributed.
Imr Northern ROCKIES(12200)

POSTED

1 day ago

DEADLINE

in 8 days
View Details

More opportunities from Department Of Defense → FA6703 94TH Contracting Flight Pk

Same awarding agency