Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on September 22, 2017. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Repair Base Fire Systems

Awarded
F8R3CE7177AW02-01Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238290
New
Centennial JCC Panic Hardware Services (Electrical Room Egress Doors)
Solicitation # Panic Hardware (Electrical Room Egress Doors)
Management & Training Corporation (MTC) is soliciting bids for the installation of commercial-grade panic hardware on electrical room egress doors at the Centennial Job Corps Center in Nampa, Idaho. The scope of work includes conducting site surveys to verify door dimensions and fire ratings, procuring Grade I heavy-duty panic bars, exterior trim, rim cylinders, strikes, and door closers, and performing installation and testing. All work must adhere to NEC 2023 Article 110.26(C)(3), NFPA 101 Life Safety Code, and ADA standards. To ensure fail-safe operation, contractors must perform at least 10 consecutive cycle tests on all installed hardware. This is a fee-for-service subcontracting opportunity open to small businesses, including certified VOSB, SDVOSB, WOSB, and HUBZone entities under NAICS code 238290. Bidders must be licensed in the State of Idaho and provide three references for similar projects. Required submission documents include a completed bid sheet with lump sum and individual deficiency pricing, a W-9, a self-certification form, and acceptance of terms and conditions. All bids must be submitted via email to Sandra Clore by December 1, 2026, at 3:00pm MST. The contract is subject to various federal regulations, including the Davis-Bacon Act for prevailing wage rates and fringe benefits, as well as FAR clauses regarding Buy American preferences and combating trafficking in persons. Contractors are required to comply with DOL records management, mandatory training, and privacy breach notification requirements. Payment will be issued upon the submission of invoices for materials and services that have been delivered and accepted by MTC. Final inspection and acceptance will occur at the MTC designated point of delivery.
Management & Training Corporation/Centennial Job Corps Center

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 238290
New
SLED
Pauma Security Gate
Solicitation # 2026-27-06
Solicitation 2026-27-06 for the Valley Center Pauma Unified School District involves the fabrication and installation of automated, keypad-entry hinging steel security swing gates at entry and egress driveways in Valley Center, California. The project requires two powder-coated steel double swing gates, each 18 feet wide by 5 feet tall, and explicitly prohibits the use of chain link options. Key technical components include a mounted Knox switch with Fire Department filing, two entry remotes, gate hold timers, a mounted strobe detector for emergency vehicles, and a keypad similar to the Door King 1506-086. The contract value is capped at 1,000,000 dollars, and the award will be granted to the lowest responsive and responsible bidder. Eligible bidders must hold a California contractor's license C13 or C-61/D28 and comply with prevailing wage requirements and Department of Industrial Relations registration. The project mandates a payment bond for 100 percent of the total bid price and a DVBE participation goal of at least 3 percent. Required submissions include a comprehensive bid packet featuring non-collusion affidavits, Iran Contracting Act certification, and fingerprinting certifications. Performance must be coordinated with the Director of Maintenance and Operations, with work hours restricted to 7:00 am to 5:00 pm, Monday through Friday. Additionally, contractors must adhere to strict hazardous material standards and California Air Resources Board compliance, with the district maintaining the right to terminate the agreement upon 30 calendar days written notice.
Valley Center Pauma USD

POSTED

1 day ago

DEADLINE

in 4 days

AI Contract Overview

Show more

This contract is for the repair of base fire protection systems at the 171st ARW in Coraopolis, Pennsylvania. The scope of work involves addressing deficiencies identified in 2016 fire inspections across multiple buildings, including troubleshooting fire alarm panels, replacing smoke and heat detectors, installing test and drain valves, and performing maintenance on diesel pumps. Additionally, the contractor is responsible for the hydrostatic testing of nineteen specific fire hoses. All furnished items must be in new condition, and the project must adhere to NFPA standards and the Unified Facilities Code. The procurement is a total small business set-aside under NAICS code 238290 and is conducted on a lowest-price technically acceptable basis. Eligible vendors must be registered in the System for Award Management and will be paid via Wide-Area Workflow. The government will provide a 150-foot boom lift for the project, and quotes should not include the cost of furnishing one. Final deliverables include personnel certifications, written recommendations for specific system repairs, and two comprehensive close-out binders detailing all completed work.

General Info

Contract Value

$74,685

NAICS

238290 - Other Building Equipment Contractors

Place of Performance

171ST ARW, PA AIR NATIONAL GUARD, CORAOPOLIS, PA, 15108, USA

Set-Aside

NONE

Award Issued Date

Documents

14

B258_Fire_Alarm_Control_panel__1.jpg

JPG

B258_Fire_Alarm_Control_panel__2.jpg

JPG

B258_Fire_Alarm_Control_panel__3.jpg

JPG

B258_Fire_Alarm_Control_panel__4.jpg

JPG

B258_Fire_Alarm_Control_panel__5.jpg

JPG

B258_Fire_Alarm_Control_panel__6.jpg

JPG

B320_DRAWING_-_PAFP101.pdf

PDF

B320_DRAWING_-_PAFP102.pdf

PDF

B320_DRAWING_-_PAFP103.pdf

PDF

B320_DRAWING_-_PAFP104.pdf

PDF

B320_DRAWING_-_PAFP105.pdf

PDF

B320_DRAWING_-_PAFP106.pdf

PDF

B320_DRAWING_-_PAFP201.pdf

PDF

MASTER_Q%26A_DOCUMENT.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W7NX Uspfo Activity Paang 171
Contacts1 person available
OfficeCORAOPOLIS, PA, 15108-4805, USA
Office AddressCORAOPOLIS, PA, 15108-4805, USA
Contacts
Michael W. BoydContract Specialist

Full Description

Show more
THIS REQUIREMENT IS FOR REPAIRS TO THE BASE FIRE SYSTEMS AT THE 171ST ARW IN CORAOPOLIS (PITTSBURGH), PA. THIS RFQ REPLACES RFQ F8R3CE7177AW02, DUE TO SIGNIFICANT CHANGES IN THE STATEMENT OF WORK (AT BOTTOM OF RFQ). INSTRUCTIONS ARE AS FOLLOWS: 1) ALL ITEMS ARE FURNISHED REQUIRED TO BE IN NEW CONDITION. REFURBISHED, USED, AND OTHER-THAN NEW ITEMS WILL NOT BE ACCEPTED. 2) THIS RFQ IS BEING CONDUCTED ON A LOWEST-PRICE TECHNICALLY ACCEPTABLE (LPTA) BASIS. 3) INTERESTED VENDORS MUST BE REGISTERED IN THE SYSTEM FOR AWARD MANAGMENT (SAM) IN ORDER TO BE AWARDED. IF YOU ARE NOT REGISTERED IN SAM, PLEASE CONTACT ME FOR ASSISTANCE. (REF: FAR 52.232-33). 4) THIS IS A TOTAL SMALL BUSINESS SET-ASIDE. VENDORS MUST BE A SMALL BUSINESS UNDER THE SIZE STANDARDS OF NAICS CODE 238290. VENDORS NEED NOT BE REGISTERED UNDER 238290, HOWEVER THEY MUST BE UNDER THE APPLICABLE SIZE STANDARD (FAR 52.219-6). 5) NAICS SIZE STANDARDS: https://www.sba.gov/contracting/getting-started-contractor/make-sure-you-meetsba-size-standards/table-small-business-size-standards 6) VENDORS WILL BE PAID VIA WIDE-AREA WORKFLOW/ IRAPT. (REF: DFARS 252.232-7006). 7) A SITE VISIT IS **NOT** MANDATORY TO BE CONSIDERED FOR AWARD. A SITE VISIT IS SCHEDULED FOR FRIDAY, SEPTEMBER 8 AT 10:00AM EST. TO ATTEND A SITE VISIT, VENDORS MUST SEND THE FOLLOWING TO ME BY THURSDAY, SEPTEMBER 7 AT 3:00PM EST. LATE SUBMISSIONS WILL NOT BE ACCEPTED AND WILL RENDER VENDOR INELIGIBLE TO ATTEND THE SITE VISIT. NO EXCEPTIONS! (REF. FAR 52.237-1) -Company Name -Name of Representatives Attending -DRIVERS LICENSE # and STATE of ALL Representatives Attending 8) A 150-FT BOOM LIFT WILL BE FURNISHED BY THE 171ST ARW FOR WORK AS NECESSARY. VENDORS ARE ASKED TO SUBMIT A QUOTE THAT DOES **NOT** INCLUDE FURNISHING OF A BOOM LIFT BY THE VENDOR. 9) Q&A'S: ALL QUESTIONS ARE DUE TO ME BY TUESDAY, SEPTEMBER 12 AT 3:00PM EST. ANSWERS TO QUESTIONS WILL BE POSTED TO THIS RFQ BY 3:00PM EST ON WEDNESDAY, SEPTEMBER 13. **PLEASE REVIEW BELOW QUESTIONS BEFORE SUBMITTING QUESTIONS** Q&A's Building 320 Q1. Are there any safety requirements or training on site required? A1. No on-site training, contractor is required to have properly-trained personnel for the work required. Q2. Will this hangar be empty for this scheduled work or is there a chance we may be asked to reschedule this building? A2. There is a chance that interruptions and reschulings will occur. If this happens, it will be a Government-caused delay / Change of Conditions and the Contractor will be entitled to extra costs incurred, as well as extra time required. Q3. Are there any as-built drawings available for the existing fire system in B320? A3. As-built drawings have been added to RFQ. Q4. It is estimated that Bldg 320 will require a minimum of 5 days for 2 people to troubleshot the repairs required on the piping. Understanding mission requirements may dictatethat personnel will be required to evacuate the hanger to allow an aircraft repair during that time are we to calculate additional mobilizations or if this happens will it be treated as a change of conditions. A4. Per A2, There is a chance that interruptions and reschulings will occur. If this happens, it will be a Government-caused delay / Change of Conditions and the Contractor will be entitled to extra costs incurred, as well as extra time required. General Q1: Is there a 1442 and price schedule the government may provide for contractors to submit proposals? A1: No price schedule or 1442; work should be bid as one lump sum with breakouts by labor and materials for each building. Building 258 (Johnstown) Q1. Is access to this facility the same as Pittsburgh? A1. Yes Q2. Please provide photos & model / manufacturer of FACP. A2. Model / Mfr of Bldg 258 FACP: Simplex 4005 (see pictures for S/N and other info) Fire Hose Testing Q1. Will the hose be removed from the cabinets? A1. No, vendor will accomplish this. Q2. Will we be responsible for removal of the hose and re-racking? A2. Yes Q3. We perform these tests at our facility. Is that ok? A3. Yes Q4. If during the preparation of our estimate it is determined replacing the hose assemblies will be more "cost advantageous" to the government, is that an acceptable approach? If so we the replaced hoses be left with the government for possible training assets or will the contractor be required to dispose of them? A4. If more advantageous certainly. Contractor will need to properly dispose of if replaced. STATEMENT OF WORK REPAIR FIRE PROTECTION SYSTEMS PROJECT: JLSQ172016 Date: 1 Sept 2017 SCOPE: The work consists of furnishing all labor, materials, tools, equipment, supplies, transportation, supervision and inspection required to perform all the work described below UNLESS OTHERWISE NOTED BELOW. LOCATION/SITE VISITS: This project is located at the Air National Guard Base, Pittsburgh International Airport, Coraopolis, PA 15108-1940. Site visit dates and attendance procedures are established in the solicitation. GENERAL REQUIREMENTS: The hours of operation at the PANG base are a compressed work schedule as follows: A. Working Times: Tuesday through Friday 0700 hours to 1530 hours. B. Work can be accomplished any time during these hours unless the base is closed for a holiday. Prior coordination with the Contracting Officer (KO) is required to work outside these hours. GENERAL DESCRIPTION OF WORK: This project is to provide repairs to known deficiencies of designated fire protection systems captured in the 2016 fire inspections close-out binders, in accordance with the appropriate sections of NFPA standards and the Unified Facilities Code (UFC). A government representative will escort the contractor while on base. Contractor will include repair results as a deliverable at the completion of this contract. The repair results shall be submitted on NFPA forms similar to those in Standard 25, Appendix B. PRINCIPLE ELEMENTS OF WORK: The following are all known deficiencies that will require repairs or modifications prior to testing and inspection. Contractor will provide system testing as needed (i.e. pressure tests after replacement of pressure relief valve). Additional information on all deficiencies can be found in the 2016 fire inspection close-out binders. Coordinate with Contracting Officer's Representative to reference the 2016 fire inspection close-out binders. Buildings 110: - Contractor shall trouble shoot and provide written recommendation to government on possible solutions to repair fire alarm panel (FAP) trouble alarm. The fire alarm panel is showing a trouble alarm for "Annunciation Communication Fail". Building 206: - Contractor shall replace the (2) existing smoke detectors in the bathrooms with heat detectors. Ensure newly installed detectors still communicate with the building fire alarm panel. Building 213: - Contractor shall install a test and drain valve at the inspector's test pipe with a built in pressure relief. Building 258: - Contractor shall trouble shoot and provide written recommendation to government on possible solutions to repair fire alarm panel (FAP) trouble alarm. The fire alarm panel is showing a trouble alarm for "IO, Output 2 Trouble". - Contractor shall replace broken fire department connection (FDC) cap. Building 308: - Contractor shall replace water motor gong alarm that is not functioning. (Replace existing Tyco WMA-1 with the same model or government approved equal) Building 320: - Contractor shall trouble shoot and provide repair options for the leaks in associated hangar sprinkler piping. The fire alarm panel is showing a supervisory alarm for "Low Air" due to leaks in the sprinkler piping system. Building 321: - Diesel Pump #1 - Contractor shall replace engine coolant (8 gal.), change engine oil & filter, change engine fuel filter, clean fuel tank. Contractor shall replace (4) existing CAT 101-4000, 190AMP, 12V batteries and dispose of the old batteries. - Diesel Pump #2 - Contractor shall replace engine coolant (8 gal.), change engine oil & filter, change engine fuel filter and clean fuel tank, and add distilled water to all (4) batteries as needed. - Diesel Pump #3 - Contractor shall replace engine coolant (8 gal.), change engine oil & filter, change engine fuel filter, clean fuel tank, and add distilled water to all (4) batteries as needed. Contractor to provide recommendation to government on possible replacement of batteries. - Diesel Pumps #1, #2, & #3. Contractor shall replace (3) existing pressure relief valves with new pressure relief valves (one valve per pump). Nomenclature from old valves is: 1. Kunkle Valve Division Stafford, TX. Plant B 2. Fire Pump Relief Valve 3. Model# 228 H-P 4. Size 6" 5. Max pressure - 175 6. Min pressure - 60 7. Capacity GPM - 2336 8. Factory setting - 125 PSIG i. Contractor to provide all hardware, gaskets or other material required for new and existing piping/flanges. ii. Contractor to execute NFPA Fire Pump Testing once installation is complete. Building 404: - Contractor shall trouble shoot and provide written recommendation to government on possible solutions to repair fire alarm panel (FAP) trouble alarm. The fire alarm panel is showing a trouble alarm for "Communication Failure", pull station. - Contractor shall install a test valve and drain with built in pressure release device. Building 405: - Contractor shall replace (2) water pressure gauges. - The fire alarm panel is showing trouble alarm in Zone 4. Contractor shall replace the tamper switch that has incurred damage from a water leak, if trouble alarm still exists contractor to provide written recommendation to government on possible solutions. Building 410: - Contractor shall replace leaking 4" water flow switch. - Contractor shall install relief valve. System has 250PSI locked in. Fire Hose Hydrostatic Testing: - All hose requiring testing is single jacket, 100' lengths, last tested in 2012. All nozzles are in good shape and do not require replacement. Contractor to provide testing to the following hose(s) (listed by hose identification number and physical location): - 1. 108 - Bay #1 - 2. 108 - Bay #4 - 3. 110 - Warehouse - 4. 110 - Warehouse - 5. 110 - Warehouse - 6. 110 - Warehouse - 7. 300-01 - Outside room 234 - 8. 300-02 - Outside room 207 - 9. 300-03 - In hallway across from room 263 - 10. 300-04 - In stairwell next to room 256 - 11. 300-05 - Bottom of stairwell by Dining Hall - 12. 300-06 - Hallway outside room 140 - 13. 300-07 - Hallway outside room 119 - 14. 300-08 - Stairwell beside room 168 - 15. 301-01 - Across from room 223 - 16. 301-02 - Across from room 214 - 17. 301-06 - Across from room 206 - 18. 302-01 - Hallway outside room 246 - 19. 302-02 - Hallway outside room 241 Submittals: - Submittals shall include a Form AF3000, Material Approval Submittal Form. The submittal must include a minimum of three copies of the required information. Submittals for Approval will have two copies of the required information retained by the Government and the third copy returned with the AF3000 noting disposition of the submittal. Close out Submittals shall have all copies of the required information retained by the Government. Submittals for Government Approval: 1. Prior to start of work Contractor shall provide credentials / certifications of qualified personnel conducting repair and inspection of base fire protection systems. 2. Contractor shall provide information / recommendations as specified above. Deliverable to Government: 1. Contractor shall provide (2) copies of system reports with repairs and cost. Contractor shall provide (2) close-out binders at the conclusion of this contract. Binders will be subdivided by building and shall contain all elements of repair and inspection that were accomplished.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS