Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on July 11, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Repair Cracks and Spalling B 43430

Closed
FA527025R0020Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238110
New
SLED
24-17.12
Solicitation # 24-17.12
The City of Piqua, Ohio, is soliciting bids for Project 24-17.12, which involves the construction of cast-in-place drilled pier foundations for transmission line structures as part of the Washington/Farrington Road T-Line project. The scope of work includes furnishing all labor, materials, and equipment to install seven drilled pier foundations for self-supporting steel poles, consisting of five 70-foot, one 71-foot, and one 80-foot pier. The engineer's estimate for this work is $280,000. Bids are due by 1:00 PM on October 19, 2026, and must be submitted as hard copies in sealed envelopes. The award will be based on the lowest and best bid, considering relative merits, technical specifications, and the bidder's qualifications. Contractors must adhere to State of Ohio Prevailing Wage laws and provide certified payroll reports. Financial security requirements include a bid bond or certified check for 10% of the total bid amount, as well as performance and payment bonds equal to the full contract price upon award. Technical compliance is strictly monitored, with specific tolerances for pier center location, elevation, verticality, and anchor bolt alignment. Concrete strength must reach 75% of the design compressive strength before structures are erected. Payment is processed monthly, with 90% of equipment costs due upon delivery and the final 10% due upon system energization and acceptance. Performance penalties of $500 per calendar day apply for delays beyond the certified delivery date.
City of Piqua

POSTED

about 16 hours ago

DEADLINE

in 9 days

General Info

NAICS

238110 - Poured Concrete Foundation and Structure Contractors

Place of Performance

Kadena Air Base, Okinawa Japan, Kadena Air Base, JP-47, 96368, JPN

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA5270 18 Cons Pk
Contacts2 people available
OfficeAPO, AP, 96368-5199, USA
Office AddressAPO, AP, 96368-5199, USA

Full Description

Show more
Amendment 0002: The purpose of this amendment is as follows:A) Extend the proposal due date to July 23, 2025, at 2:00 PM (JST). This aligns with the date posted on the Government Point of Entry.B) Revise the proposal validity period to 69 calendar days. Block 13d is hereby changed to reflect this.C) Amend Section L regarding financial statements. The requirement to submit financial statements with the proposal is removed. Financial statements may be requested later to determine responsibility per FAR 9.104-1.D) Amend Sections L and M regarding past performance. The requirement for Past Performance Questionnaires is removed. Offerors will now submit CPAR information for recent and relevant projects. The PPQ attachment has been removed to reflect this change.E) Amend Sections L and M regarding proposal summary and table of contents. The requirement for a concise summary and master table of contents is removed.F) A Bid Guarantee is no longer required and reflected in block 13bG) Removal of clause FAR 52.228-1 Bid Guarantee.H) No other changes at this time.NOTE: Refer to Sections L and M for further details on proposal submission changes.Amendment 0001: The purpose of this amendment is to change Section M, from a minimum of three (3) years to five (5) years of past performance. No other terms or conditions have been altered to the solicitation. For questions regarding this amendment, contact Emily Rubino at 315-634-1833 / emily.rubino@us.af.mil.Original Post: Repair cracks and spalls on concrete walls, beams, columns, roof, floor slab, and eaves. Repair to install concrete jackets along column gridlines and roof beams. Repair to restore integrity of steel members that deteriorated due to corrosion. Apply Fiber Reinforced Polymer (FRP) to canopy beams and slabs. Remove and reinstall electrical and other fixes to facilitate repair works as needed. Paint areas that are subjected to repair work and restore original appearance. Abate and dispose Asbestos Containing Material (ACM) and Lead-Based Paint (LBP). Demolish and dispose waste material as appropriate. Sustainable principles, to include life cycle cost-effective practices, will be integrated into the design, development, and construction of the project in accordance with UFC 1-200-02. Construction activities may commence after the approval of the Environmental Protection Plan (EPP) and AF Form 103 (work clearance). The Contractor shall coordinate on-site safety requirements through the 718th Civil Engineer Squadron (718 CES).Proposals must be submitted no later than 23 July 2025, 1400 (2:00pm) JST.

More opportunities from Department Of Defense → FA5270 18 Cons Pk

Same awarding agency

NAICS: 221320
Federal
DCDO Septic Tank and Sewage Treatment Maintenance
Solicitation # FA527027QB006
The United States Air Force 18th Contracting Squadron is soliciting quotations for a single-award, firm-fixed-price requirements contract to provide septic tank and sewage treatment plant maintenance services for the Defense Communications Detachment Okinawa (DCDO) in Okinawa, Japan. The contract encompasses a base period from December 1, 2026, to November 30, 2027, with four subsequent option periods extending the total performance through November 30, 2031. The scope of work includes implementing a Preventive Maintenance Inspection Service program, performing general maintenance and repairs, and responding to routine service calls within 24 hours. All maintenance personnel must be certified plant operators approved by the Government of Japan Ministry of Public Health and Welfare. Award will be granted to the responsible offeror whose proposal is determined to be the most advantageous to the government, with price serving as the primary evaluation factor. To be considered responsible, quoters must submit current Industrial Waste Disposal or Collection and Transportation Business licenses. Deliverables include quarterly work reports and personnel access lists submitted one week prior to starting work. The contractor must also adhere to strict marking and labeling standards for any delivered items per MIL-STD-130 and MIL-STD-129. Quotations must be submitted electronically by October 26, 2026, and must include a detailed pricing breakdown via the provided Price Exhibit.
Sewage Treatment Facilities

POSTED

12 days ago

DEADLINE

in 6 days
View Details
NAICS: 236210
Federal
Sources Sought
Solicitation # FA527027R0008
The Department of the Air Force, through the 18th Contracting Squadron, is conducting market research via a Sources Sought notice to identify qualified contractors for the construction of ten Earth Covered Magazines (ECMs) at Kadena Air Base in Okinawa, Japan. The project, planned for the 2027 to 2029 timeframe, requires the delivery of blast-resistant storage infrastructure for munitions and explosives. The scope of work includes engineering and constructing reinforced concrete structures with heavy-duty floors, structural walls, and roof slabs, as well as installing reinforced steel blast doors and applying dense earth cover for safety and containment. Additional requirements include the installation of lightning protection systems, grounded electrical infrastructure, perimeter security, demolition, site preparation, utilities, paving, and environmental abatement. Interested respondents must demonstrate specialized experience in constructing hardened concrete structures and explosive storage facilities within the last five years, specifically within force protection and controlled-access areas. Contractors must possess the legal authority, licensing, and operational footprint to work in Japan, including SOFA compliance and potentially a Japanese branch office or joint venture. The government is seeking information on capabilities regarding design-build or progressive design-build delivery methods and is evaluating whether to utilize a standard FAR-based contract or an Other Transaction Agreement (OTA) pursuant to 10 U.S.C. 2808a. Qualified firms must submit a company profile and a comprehensive questionnaire to the designated points of contact by October 21, 2026.
Industrial Building Construction

POSTED

12 days ago

DEADLINE

in about 21 hours
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS