Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity was posted on September 29, 2008. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Repair Drain Pans Roof Main Building

Closed
TEPRFP-08-0038Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking a subcontractor for a fixed-price design-build project to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project involves the design and installation of a roof covering approximately 800 gross square feet, featuring a 3% sloped roof with a single ply, EPDM 60 mil roofing system. Key deliverables include structural framing using wood or steel, the installation of three LED strip light fixtures with one emergency backup, and the submission of detailed shop drawings and project documents via Submittal Exchange in PDF and AutoCAD formats. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Bids will be evaluated based on overall best value, and a physical site visit is mandatory prior to submission. For bids equal to or greater than $25,000, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. The project is subject to Construction Wage Rate Requirements, necessitating weekly certified payroll reports and adherence to California prevailing wage determinations. Additionally, contractors must meet specific insurance minimums, including $1 million per occurrence for general liability, and provide a UEI number for FFATA reporting on contracts valued at $40,000 or more.
Inland Empire Job Corps

POSTED

about 9 hours ago

DEADLINE

in 12 days
NAICS: 238160
New
SLED
ROOF MAINTENANCE SERVICES - IFB 27C580000
Solicitation # 27C580000
The Department of the California Highway Patrol is soliciting bids for annual roof maintenance and inspection services for the West Valley Area office in Los Angeles. The anticipated contract term runs from July 1, 2027, through June 30, 2030. The scope of work requires annual inspections between October and December, including debris removal from surfaces and gutters, interior and exterior structural assessments, surface analysis of flat roof membranes, and ponding assessments. Contractors must document all deficiencies using a specific checklist and provide photographs, submitting reports to the CHP Facilities Coordinator within three business days of inspection. The agreement will be awarded to the responsive and responsible bidder offering the lowest cost, with adjustments applied for Small Business or Micro Business preferences and Disabled Veteran Business Enterprise incentives. To be eligible, bidders must possess a valid California C-39 Roofing License, a local business license, and registration with the Department of Industrial Relations. Personnel are subject to security clearances and driver license checks. Bids must be submitted as a single, sealed physical package containing all required certifications and signed forms by the November 19, 2026, deadline. Compliance with the Americans with Disabilities Act and California prevailing wage laws is mandatory.
Department of the California Highway Patrol

POSTED

about 20 hours ago

DEADLINE

in 29 days

General Info

Agency

N/A

NAICS

238160 - Roofing Contractors

Place of Performance

Bureau of Engraving and Printing 14th and C Streets, SW, WASHINGTON, DC, 20228-0001, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Gordon A. HackleyContract Specialist
Richard W GermanContract Specialist

Full Description

Show more
STATEMENT OF WORK FOR CONSTRUCTION SERVICES Main Building Roof Drain Pan Replacement and Warranty DEPARTMENT OF TREASURY BUREAU OF ENGRAVING AND PRINTING 14th & C Streets S. W. Washington, D. C. 20228 August 14, 2008 1.0 SCOPE 1.1 The contractor shall provide all labor, materials, equipment, tools, supplies, supervision and general construction services for the replacement of 19 existing stainless steel drain pans and the rework of their respective rain leader connection. The work applies to only the drain pans set into the soldered-joint roof, and does not include drains located in the cornice gutter system. Upon completion of roof drain work, a warranty shall be issued for all drains previously mentioned as well as for all soldered-joint and standing seam roof locations on the Main Building roof. This represents the "Headhouse", A-Wing, D-Wing and small portions of B and C Wings. Provide twice yearly inspections of warranted roof. 2.0 DOCUMENTS 2.1 Applicable Documents: The General Contractor shall comply with the current edition of all applicable practices, codes, methods and standards as prepared by technical societies and associations. In case of conflict between codes and standards of the organizations, the more stringent regulations shall govern. 2.2 Government Furnished Documents: The Bureau of Engraving and Printing shall provide the following: - 1 electronic copy of existing as-built drawings and specs of previous project titled, "Main Building Roof Replacement". The drawings will be provided for informational purposes only. The specifications will provide contractual direction for the project. 3.0 REQUIREMENTS 3.1 The Contractor is required to complete this contract (including all punch list items) within one hundred eighty (180) calendar days after notice to proceed. 3.2 The following are additional requirements, clarifications, or changes to the requirements contained in the enclosed specifications and drawings: 3.2.1 Provide Tremco Performance Warranty (TPW) for roof as described in the Statement of Work scope (section 1.1). The response time, after BEP notification of water leak, shall be no greater than 24 hours. The performance period of the contract shall be for five years. 3.2.2 Provide twice yearly inspection and written reports of findings. 3.2.3 The replacement drain pans shall have welded edges and meet all other spec requirements. 3.2.4 The rain leaders shall make a solid connection, as opposed to the current slip connection. 3.3 The following milestone dates should be incorporated into the contractor's schedule. (Failure to meet the milestone dates requested may result in the termination of the contract.) 3.3.1 Within ten (10) calendar days after Notice to Proceed, the contractor shall provide to the BEP a submittal schedule and which fixes the dates for submission of Shop Drawings, Product Data, and Samples. 3.3.2 All Shop Drawings, Product Data and Samples shall be submitted to the BEP within forty-six (46) calendar days after Notice to Proceed. The BEP will provide the Contractor with written comments within 14 calendar days after receiving each submittal. 3.3.3 A complete list of all General Construction Contractor personnel shall be submitted to the Contracting Officer prior to commencement of "on-site" work. The list shall include the employee's name, social security number (SSN), date of birth (DOB), and place of birth. This information is required so that Office of Personnel Management can set up access to the OPM website that will be used by the employee so that his application for a security clearance can be started. After the application has been completed on-line, by the applicant, the fingerprints may be taken and the remainder of the required security application can be processed. Allow at least four (4) weeks, prior to commencement of "on-site" work, for security approval. 3.3.4 The Contractor shall submit a construction schedule within ten (10) calendar days after Notice to Proceed. The construction schedule shall be prepared in terms of calendar days (not working days). Once the construction schedule is submitted by the Contractor and approved by the Contracting Officer, no lateness in the schedule shall be tolerated without the Contracting Officer's approval. 3.3.5 A pre-construction meeting shall be held within ten (10) calendar days after award of contract. During the construction, the Contractor shall attend all weekly construction progress meetings. The meeting schedule and place will be discussed in the pre-construction meeting. 3.3.6 The contractor shall submit a "Safety and Fire Prevention Plan within ten (10) calendar days of award of contract. After approval of the plan, a construction permit shall be issued by the Bureau of Engraving and Printing for construction. 3.4 Protection of Existing Property: 3.4.1 Before beginning any demolition work, the contractor and the Contracting Officer's Technical Representative shall carefully survey the site and examine the drawing to determine the extent of the work. The Bureau of Engraving and Printing will take photos of the construction area to serve as a record of the existing conditions. During the construction, the contractor shall take all necessary precautions to avoid damage to existing items that will remain in place or be relocated by the contractor. All items damaged by the contractor will be repaired/replaced at no additional cost to the Government. Repair/Replacement of damaged Bureau of Engraving and Printing property is subject to approval by the Contracting Officer. 4.0 GENERAL INFORMATION 4.1 All contractors bidding for this contract will be informed of the date for the pre-bid meeting and site tour at the Bureau of Engraving and Printing. Any questions regarding the bidding documents shall be submitted in writing to the Bureau of Engraving and Printing 48 hours prior to the meeting. Responses to all questions will be provided in writing to all Contractors within seven working days of the receipt of all contractors' questions. 4.2 The Contracting Officer must approve all work that is beyond the scope of this task order. 4.3 Any questions concerning this project shall be directed to the Contracting Officer, Rick German at (202) 874-3248. --END OF STATEMENT OF WORK--

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS