This project at Eielson Air Force Base, Alaska, involves the restoration of fire suppression system functionality within Building 1176. The primary scope of work includes replacing two legacy fire pump controllers with new units, decommissioning and removing a legacy foam-releasing control panel, and installing a new panel for the preaction/wet system. Additionally, the contractor must decommission and dispose of one High-Expansion Foam (HEF) tank and concentrate storage system, as well as remove and terminate six manual foam-releasing pull stations in the hangar bay. The order of magnitude for this effort is estimated between $350,000 and $500,000. The contract is a small business set-aside and requires the services of a Registered Qualified Fire Protection Engineer (QFPE) to provide stamped design drawings and a compliance memorandum. All work must adhere to UFC 3-600-01, UFC 4-211-01, and NFPA 4, 20, and 72 standards. Strict environmental and safety protocols are in place, specifically regarding the disposal of HEF hazardous waste in accordance with Alaska State Regulation Chapter 62 and the Resource Conservation Recovery Act. Key deliverables include a signed NFPA 72 Record of Completion, updated as-built drawings, and a final Integrated System Test. Quality control is managed through a contractor-prepared Quality Control Plan and government oversight via a Quality Assurance Surveillance Plan.
General Info
Place of Performance
Eielson AFB, AK, 99702, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
The objective of this project is to replace two (2) fire pump controllers (FPCs), decommission and remove one (1) legacy foam-releasing control panel and install a new panel for the preaction/wet system. Decommission and remove one (1) High-Expansion Foam (HEF) tank and concentrate storage system. The existing HEF system is locked out from operation and must be removed and disposed of properly.
Please see the Scope of Work (Attachment 1) and supporting documents for the full requirement description.
----------------------------------------------
25 Aug 26,
The purpose of this amendment is to inform the order of magnitude: $350,000- $500,000, and correct the issue date in the combo document.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS