Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on August 26, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Repair Fire Pump Controllers, B1176, HEF Disposal

Closed
W50S6K-26-B-A001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, with a response deadline of November 4, 2026. The project falls under NAICS code 236220 and focuses on basin improvements within the Riverside or Los Angeles project areas. A critical component of this solicitation is strict adherence to six Good Faith Effort (GFE) requirements designed to ensure DBE participation and secure project financing. Bidders must provide proof of GFE #2, which requires posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for one day, as well as proof of GFE #5, involving the utilization of the Small Business Administration (SBA) and the Minority Business Development Agency (MBDA). Failure to submit documentation for these two specific efforts within the bid package will result in the proposal being deemed non-responsive. Additionally, outreach documentation for GFE #1 may be submitted up to three business days after the bid closing date.
RT CONTRACTOR CORP

POSTED

about 5 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 5 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located on the northeast end of Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation involving soil stabilization and utility relocation; construction of the plant including a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic system for invoicing and payments and are required to accept the standard Overaa agreement without modification. Key milestones include a mandatory pre-bid meeting on October 5, 2026, with bid submission deadlines listed as either October 28 or November 10, 2026.
C. Overaa & Co.

POSTED

about 5 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site work such as clearing, rock excavation, grading, and wetland mitigation, as well as the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building. Demolition of 18 existing magazines and buildings 524 and 393 is also required. Technical requirements encompass a wide range of trades including demolition, abatement, concrete, structural steel, roofing, electrical, plumbing, and mechanical systems. Specialized construction features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. The project also involves installing primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact the primary point of contact by the October 31, 2026, deadline to receive bid documents.
J & J Contractors, Inc

POSTED

about 5 hours ago

DEADLINE

in 11 days

AI Contract Overview

Show more

This project at Eielson Air Force Base, Alaska, involves the restoration of fire suppression system functionality within Building 1176. The primary scope of work includes replacing two legacy fire pump controllers with new units, decommissioning and removing a legacy foam-releasing control panel, and installing a new panel for the preaction/wet system. Additionally, the contractor must decommission and dispose of one High-Expansion Foam (HEF) tank and concentrate storage system, as well as remove and terminate six manual foam-releasing pull stations in the hangar bay. The order of magnitude for this effort is estimated between $350,000 and $500,000. The contract is a small business set-aside and requires the services of a Registered Qualified Fire Protection Engineer (QFPE) to provide stamped design drawings and a compliance memorandum. All work must adhere to UFC 3-600-01, UFC 4-211-01, and NFPA 4, 20, and 72 standards. Strict environmental and safety protocols are in place, specifically regarding the disposal of HEF hazardous waste in accordance with Alaska State Regulation Chapter 62 and the Resource Conservation Recovery Act. Key deliverables include a signed NFPA 72 Record of Completion, updated as-built drawings, and a final Integrated System Test. Quality control is managed through a contractor-prepared Quality Control Plan and government oversight via a Quality Assurance Surveillance Plan.

General Info

Fire suppression upgrades and decommissioning at Eielson AFB, budget 350k-500k, deadline September 2026.

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Eielson AFB, AK, 99702, USA

Set-Aside

SBA

Documents

16

AK20260001 Wage Determination (Alaska Building and Heavy)

PDF, High priority: read this firstwage-determination
High

Attachment 10 - Quality Control Plan (QCP)

PDF, High priority: read this firstsow
High

Attachment 6 - Diesel Fire Pump Data

PDF, High priority: read this firstsubmittal-data-sheet
High

Attachment 8 - Photos

PDF, High priority: read this firstsow
High

Eielson AFB WP/APP – HEF System Decommissioning

PDF, High priority: read this firstsow
High

FTQW 25-2004 Attachment 4 Environmental Requirements

PDF, High priority: read this firstsow
High

FTQW 25-2004 Scope of Work – Fire Pump Controllers and HEF Disposal

PDF, High priority: read this firstsow
High

G17 EAFB IFS Fire Alarm Systems Standards

PDF, High priority: read this firstspecifications
High

Qualified Fire Protection Engineer (QFPE) Services

PDF, High priority: read this firstsow
High

W50S6K26BA001 FTQW 25-2004 Repair Fire Pump Controllers and HEF Disposal

DOCX, High priority: read this firstifb
High

W50S6K26BA001 FTQW 25-2004 Repair Fire Pump Controllers & HEF Disposal IFB

DOCX, High priority: read this firstifb
High

W50S6K26BA002 Provisions and Clauses

PDF, High priority: read this firstspecifications
High

Continuation Sheet – 813 Repair FP

PDF, Low priorityother
Low

FTQW 04-2254 Repair Aircraft Maintenance Hangar Building 1176 As-Built

PDF, Low priorityother
Low

RFI Tracker

XLSX, Low priorityrfi
Low

Attachment+3+-+FTQW25-2004+Submittal+Register.PDF

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W7MU Uspfo Activity Akang 168
Contacts2 people available
OfficeEIELSON AFB, AK, 99702-1794, USA
Office AddressEIELSON AFB, AK, 99702-1794, USA

Full Description

Show more

The objective of this project is to replace two (2) fire pump controllers (FPCs), decommission and remove one (1) legacy foam-releasing control panel and install a new panel for the preaction/wet system. Decommission and remove one (1) High-Expansion Foam (HEF) tank and concentrate storage system. The existing HEF system is locked out from operation and must be removed and disposed of properly.


Please see the Scope of Work (Attachment 1) and supporting documents for the full requirement description.


----------------------------------------------


25 Aug 26,


The purpose of this amendment is to inform the order of magnitude: $350,000- $500,000, and correct the issue date in the combo document.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS