Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on June 25, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Repair Fuel Cell, B1171

Closed
W50S6K24B0002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific performance area in Riverside or Los Angeles, focuses on basin improvements under NAICS code 236220. The solicitation was posted on October 19, 2026, with a response deadline of November 4, 2026. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation. To secure project financing, the Inland Empire Utilities Agency requires strict adherence to expanded DBE Good Faith Effort (GFE) guidelines. Bidders must provide proof of utilizing SBA and MBDA services and demonstrate that solicitations were posted in an online publication for 30 consecutive days and in a newspaper for at least one day prior to the bid opening. Failure to include this documentation within the bid package will result in the proposal being deemed non-responsive. While outreach documentation may be submitted up to three business days after the closing date, all other mandatory GFE requirements must be met by the opening date to ensure compliance.
RT CONTRACTOR CORP

POSTED

about 2 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located on the northeast end of Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation involving soil stabilization and utility relocation; construction of the plant including a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic system for invoicing and payments and are required to accept the standard Overaa agreement without modification. Key milestones include a mandatory pre-bid meeting on October 5, 2026, with bid submission deadlines listed as either October 28 or November 10, 2026.
C. Overaa & Co.

POSTED

about 2 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site work such as clearing, rock excavation, grading, and wetland mitigation, as well as the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building. Demolition of 18 existing magazines and buildings 524 and 393 is also required. Technical requirements encompass a wide range of trades including demolition, abatement, concrete, structural steel, roofing, electrical, plumbing, and mechanical systems. Specialized construction features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. The project also involves installing primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact the primary point of contact by the October 31, 2026, deadline to receive bid documents.
J & J Contractors, Inc

POSTED

about 2 hours ago

DEADLINE

in 11 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Eielson AFB, AK, 99702, USA

Set-Aside

SBA

Documents

24

Air Regulator Photos

PDF, High priority: read this firstspecifications
High

Alaska Air National Guard Fuel Systems Maintenance Hangar - Construction Design Drawings

PDF, High priority: read this firstspecifications
High

B1171 Fuel Cell Repair - Civil Site and Utility Plan

PDF, High priority: read this first1 page · specifications
High

Building 1171 Roof Report - Fuels Maintenance Section A & B

PDF, High priority: read this first7 pages · specifications
High

Eielson AFB Repair Fuel Cell B1171 RFI Responses

PDF, High priority: read this first2 pages · q-and-a
High

Eielson Air Force Base - Luminaire Schedule

PDF, High priority: read this firstspecifications
High

Eielson Air Force Base - Partial First Floor Lighting Plan (ESK-2)

PDF, High priority: read this firstspecifications
High

Eielson B1171 Civil Drawings

PDF, High priority: read this firstspecifications
High

Env Atlas - B1171: Decision and Administrative Controls

PDF, High priority: read this firstspecifications
High

Repair Fuel Cell, B1171 - Type B3 Final Design Submittal Specifications

PDF, High priority: read this first1284 pages · specifications
High

Repair Fuel Cell, Building 1171 - Governmental Safety Requirements

PDF, High priority: read this firstspecifications
High

Section 23 30 00 HVAC Air Distribution - Final Design Submittal (B-3)

PDF, High priority: read this first15 pages · specifications
High

Solicitation W50S6K24B0002 Amendment 1

PDF, High priority: read this firstamendment
High

Solicitation W50S6K24B0002 - Repair Fuel Cell, B1171

PDF, High priority: read this firstifb
High

W50S6K24B0002 Amendment 0002

PDF, High priority: read this first12 pages · amendment
High

W50S6K24B0002 Amendment 0003

PDF, High priority: read this first5 pages · amendment
High

W50S6K24B0002 Amendment 0004

PDF, High priority: read this first12 pages · amendment
High

W50S6K24B0002 Amendment 0005

PDF, High priority: read this first2 pages · amendment
High

W50S6K24B0002 Amendment 0006

PDF, High priority: read this first5 pages · amendment
High

Frequency Converter Photos

PDF, Low priorityother
Low

FTQW072002 Repair Fuel Cell B1171 Environmental Impact Analysis

PDF, Low priority9 pages · determination-and-findings
Low

Repair Fuel Cell B1171 Pre-Bid Meeting Sign-In Sheet

PDF, Low priorityindustry-day
Low

W50S6K24B0002 Repair Fuel Cell B1171 Pre-Bid Conference Slides

PDF, Low priorityindustry-day
Low

Eielson+B1171+Type+B-3+Submittal+Drawings+FP+revised+Addendum+1.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

7 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Notice updated

Response deadline changed from May 23, 2024 to Jun 5, 2024. The notice description changed.

Notice updated

Response deadline changed from Jun 5, 2024 to Jun 13, 2024. The notice description changed.

Notice updated

Response deadline changed from Jun 13, 2024 to Jun 18, 2024. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Jun 18, 2024 to Jun 26, 2024. The notice description changed.

Notice updated

Response deadline changed from Jun 26, 2024 to Jul 2, 2024. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W7MU Uspfo Activity Akang 168
Contacts2 people available
OfficeEIELSON AFB, AK, 99702-1794, USA
Office AddressEIELSON AFB, AK, 99702-1794, USA

Full Description

Show more
Solicitation amendment. Summary: - Extend the IFB deadline 2 July @1000 To revert back to the original hazardous classification area as defined in the initial bid documents ----------------------------------------------------------------- Solicitation amendment. Summary: - Extend the IFB deadline. -------------------------------------------------------------------------------------- Solicitation amendment. Summary: - Incorporate questions 81 & 82 and the answers received, to include three attachments in SAM.gov. The solicitation due date remains the same. -------------------------------------------------------------------------------------- Solicitation amendment. Summary: - Bid Extension to 18 June 2024 at 10AM Alaska time -------------------------------------------------------------------------------------- Solicitation Admendment Summary. To provide and extension - 13 June 2024 Provide Q&A Provide 9 Attachments. -------------------------------------------------------------------------------------- Solicitation amendment. Summary: - Bid Extension to 5 June 2024 (was 23 May previously) - 52.228-1 included by full text (was previously by reference only) - Added Wage determination AK20240001 dated 02/23/2024 ***************************************************************************** Pre-Bid meeting documents attached. Invitation for Bid (IFB) to award a single firm fixed-price contract for services, non-personal, to provide all plant, labor, transportation, materials, tools, equipment, appliances and supervision necessary for the replacement of the existing Aqueous Film Forming Foam (AFFF) fire protection system with a water only system that complies with current Air Force requirements for aircraft hangar fire protection at Eielson AFB, Alaska. Architectural modifications include the construction of walls to expand office and tool storage space, as well as the construction of emergency egress exits from the hangar bay. Additional features of work include heating, ventilation, and lighting upgrades. In addition to the base work described above, the solicitation will include the following option line items: 1. Construct Fire Protection Water Loop and Fire Hydrants, and 2. Telecommunications Cabling. The pre-bid conference is scheduled for 06 May 2024 at 1:00pm local time on Eielson AFB. Interested contractors are encouraged to attend and shall follow conference registration and base access requirements shown in the solicitation. See the attached solicitation for details.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS