Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity was posted on July 29, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Repair Leaking Roofs and Gutters on Bolling AFB

Closed
FA7012-09-T-0061Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238160
New
Inland Empire Job Corps-Request for Quote Roof Design & Build
Solicitation # inland-empire-job-corps-request-quote-roof-design-build
Management & Training Corporation is seeking quotes for a fixed-price design-build subcontract to construct an over-build enclosure for the lower roof of Building G at the Inland Empire Job Corps Center in San Bernardino, California. The project covers approximately 800 gross square feet and requires the design and installation of a framing system, a 60 mil EPDM single-ply roofing system with a 3% slope, and three LED strip light fixtures, including one emergency backup. All work must comply with OSHA 29 CFR Part 1926, the Architectural Barriers Act Accessibility Standard of 2007, and Job Corps sustainability guidelines. The total period of performance is 240 days, with a requirement to complete the work within 100 consecutive business days following the Notice to Proceed. Bids are due by November 2, 2026, and will be awarded based on overall best value. Interested bidders must conduct a physical site visit and submit a signed attendance roster to be considered. Required submission documents include the MTC Bid for Lump Sum Contract form, a detailed cost breakout, and a bid bond equal to 20% of the base bid for any quote equal to or exceeding $25,000. Awarded contractors must provide performance and payment bonds for projects over $25,000, maintain specific insurance minimums, and adhere to California prevailing wage rates with weekly certified payroll reporting. Additionally, contracts valued at $40,000 or more are subject to FFATA reporting requirements.
Inland Empire Job Corps

POSTED

about 3 hours ago

DEADLINE

in 13 days
NAICS: 238160
New
SLED
26-11166 IFB Parapet Flashing Installation
Solicitation # 26-11166
Greene County, Missouri, is soliciting bids under solicitation number 26-11166 for the installation of new roof flashing on the parapet wall of the Historic Courthouse located at 940 N Boonville Ave., Springfield, MO. The scope of work includes the removal of existing metal flashing, seals, and damaged underlayment, followed by the inspection and repair of the roof deck and insulation. The contractor is required to install 3/4 inch exterior grade plywood fastened to the masonry cap, a 60mil TPO roof membrane, and weldable metal flashing using high-performance elastomeric or polyurethane adhesives to ensure a permanent watertight seal. The contract will be awarded to the lowest responsive responsible bidder, with evaluation factors including prior work experience and the proposed time of completion. Bidders must submit their proposals via the Greene County Electronic Bidding Portal by the specified deadline. Required submission documents include a manually signed title page, an Experience Statement demonstrating completion of comparable projects, an E-Verify Signature Page, and a Federal Tax ID. For contracts exceeding 5,000 dollars, a notarized affidavit is required. The successful contractor must provide performance and payment bonds at 110 percent of the contract value and comply with the Missouri Domestic Product Procurement Act, Clean Air and Clean Water Acts, and prevailing wage statutes if the project exceeds 75,000 dollars. Final acceptance of the work will be conducted at the destination by an authorized representative of the County.
Greene County

POSTED

about 5 hours ago

DEADLINE

in 23 days
NAICS: 238160
New
Federal
26Z1AY6_Replace Roofing_FCC Butner
Solicitation # 15B10627PR000102
The Federal Bureau of Prisons is conducting market research through a Sources Sought Notice for a firm-fixed-price construction contract to replace the roofing system at the Federal Correctional Complex (FCC) Butner in North Carolina. The project involves the complete removal and disposal of approximately 35,000 square feet of flat EPDM roofing and 27,000 square feet of pitched shingle roofing. The contractor will install a new 80-mil TPO flat roof system with tapered EPS insulation and a 30-year Class A asphalt shingle system on pitched areas, ensuring all penetrations, drains, and flashing are watertight and manufacturer-approved. The estimated project magnitude is between 1,000,000 and 5,000,000 dollars, with an estimated performance period of 637 calendar days. This opportunity is specifically seeking 8(a) contractors under NAICS code 238160, with a small business size standard of 19.0 million dollars in average annual receipts. The awarded prime contractor must provide all labor, materials, and equipment, maintain a 20-year non-prorated watertight warranty, and adhere to NRCA standards and FAR 28.102 for performance and payment bonds. Due to the secure nature of the facility, all personnel must undergo criminal background checks and security clearance investigations, which may take up to 35 days. Interested 8(a) firms must be registered in SAM and respond by adding their names to the Interested Vendors List and submitting a Market Research Questionnaire by October 26, 2026.
Fao

POSTED

about 7 hours ago

DEADLINE

in 6 days

General Info

Agency

N/A

Contract Value

$47,112

NAICS

238160 - Roofing Contractors

Place of Performance

Bolling Air Force Base, WASHINGTON, DC, 20020, USA

Set-Aside

SDVOSBC

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

2 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

Response deadline changed from Jul 28, 2009 to Aug 7, 2009. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Patrice A IrbyContract Specialist
Maria B. WilliamsContracting Officer

Full Description

Show more
Omni Group Request for information: 001 Question: Repair gutter on SE corner of Bldg 46, is work limited to the front of the building from the clock tower to the SE corner of bldg? Answer: Yes 003 Question: Repair leak on south end of Bldg 1302, during walk it was stated that leaks occur throughout building. Should we address all leaks mentioned (north side and center) or just the south end leak? Answer: Should address all leaks North, Center and South. Question: Is there any preferred method for leak investigation? Will flood testing areas be acceptable means? Answer: Method to be in according to type of roof. Flood test is acceptable. 005 Question: Repair roofs where shingles are missing and worn at BLDG 3621, during walk, other contractor on site mentioned possible damaged decking in various areas. Is this SOW limited to shingle replacement in areas as seen on job walk? Answer: No, include decking repair Question: Can we submit shingle replacement pricing as a NTE (Not to Exceed) square footage? Answer: No can submit as time and material. 006 Question: Install gutters and downspouts around building 4485, can you verify that water fall in area where the two buildings adjoin can remain and no gutter system is required in this section of the roof? Answer: Yes, where two buildings adjoin no gutter required in this area. Question: No gutter type is specified. What material/system is required for this portion of the project? Answer: Aluminum to match existing brown color of roof. 008 Question: Repair leak at skylight in center of Bldg 5683, during job walk, 2 additional areas of known leaking were identified. These areas were "patched" previously with sheet metal. Both of these areas are along the skylight side of the building. Are these two areas of patching to be added to the scope of work? Answer: Yes Question: Visible water collection under membrane at base of skylight is visible. Is this issue to be addressed in this contract? Answer: Yes Ribeiro Construction Company's request for information Question: BUILDING 1302, with the repair to the four (4) areas, are we required to just stop the leak or replace a certain sized area where the leak exists or remove all wet insulation because wet area of insulation is unknown? Answer: The requirement is to fix the leaks, if in the process wet insulation is found, it is to be replaced. Question: BUILDING 4485, we need to know if there is wood sheathing behind the fascia metal to support the gutter with screws into the wood or are we going to have to find metal studs and fasten into them which might require removing some of the fascia in order to find where the metal studs are? Answer: There is no wood sheathing behind the fascia metal. Question: BUILDING 46, we need to know how many feet of the gutter fascia must be repaired because some metal is missing, some metal is badly bent out and some metal is just bowed out. Answer: Approximately 60' to match existing gutter fascia. Question: DROPED CLIN #s, it is our understanding that LINE ITEM 4 & LINE ITEM 7 have both been deleted from the SOW. Answer: Yes, Line Items number 0004 and 0007 have been deleted. Question: Please confirm and advise how these will be address in the bid and the bonding requirements for the contract. Answer: Use Company's letter head.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS