Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Repair, Replace, Reline Culverts EA 06-1H910

Forecast
06-1H910State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Caltrans District 6 is forecasting a project, identified as EA 06-1H910, to repair, replace, and reline culverts at eleven specific post miles on State Route 41 in Madera County, specifically within the Coarsegold area. The scope of work includes the installation of drain inlets and flared end sections at select locations. All activities are restricted to the Caltrans right of way, extending no more than five feet beyond the end of replacement culverts, with an expectation of minimal soil disturbance during liner replacements. The project is classified as routine maintenance and is exempt under CEQA Categorical Exemption 15301, class 1c, and is a NEPA Categorical Exclusion. Key compliance requirements include the development of a lead compliance plan by a Certified Industrial Hygienist for ground-disturbing activities and the mandatory cessation of work if unidentified cultural materials are discovered until an archaeologist can perform an assessment. Additionally, pre-construction surveys for nesting migratory birds are required for any vegetation removal conducted between February and September. Project management is overseen by Gurpaul Bath, with Pedram Mafi serving as the primary environmental contact.

General Info

Repair and relining of eleven culverts along State Route 41 with strict environmental and cultural resource protections.

Agency

California → Caltrans, District 6 - Fresno/Bakersfield

Place of Performance

State Route 41 and Road 416, Road 420, Road 426, Road 630, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 6 - Fresno/Bakersfield
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 6 - Fresno/Bakersfield
Office AddressN/A

Full Description

Show more
The proposed project will repair, replace, and reline culverts at post miles 21.18, 25.4, 27.18, 29.71, 33.35, 33.45, 34.13, 45.23, D1.38, D1.58 and D1.81 on State Route 41 in Madera County. Work includes replacing, repairing and relining culverts as needed. Some locations will have placement of flared end section and drain inlets. Soil disturbance is expected to be minimal for liner replacements. All work will be restricted to within Caltrans right of way and up to 5 feet past the end of the culvert for the replacement culverts.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 10 hours ago

DEADLINE

in 23 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS