Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on February 11, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

REPAIR RUNWAY 32 PAVEMENT PHASE 3

Closed
FA449725R0005Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC), operating the Joliet Job Corps Center, is seeking quotes for a fixed-price, single lump sum subcontracting opportunity to perform road and parking lot repairs in Joliet, Illinois. The project scope includes asphalt pavement replacement covering approximately 62,500 square feet across five key areas, including the guard shack, dorm parking lot, west side of dorms, kitchen/BCT, and dumpster/maintenance areas. Additionally, the contractor is responsible for repairing five drain structures and five potholes. The estimated contract value ranges from $100,000 to $250,000, with a performance period of 90 consecutive business days following a written Notice to Proceed. Bids are due by October 21, 2026, at 3:00 PM CT and must be submitted via email to Fran McGraw. To be considered, bidders must complete a mandatory physical site visit, provide a detailed cost breakout, and submit the MTC Bid for Lump Sum Contract form. For bids equal to or greater than $25,000, a bid bond guarantee of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to Construction Wage Rate Requirements, necessitating compliance with prevailing wages and the submission of weekly certified payroll. Award decisions will be based on overall best value. Payment is processed through pay applications using AIA G702 and G703 forms, with a 10 percent retainage held until substantial completion. Final acceptance is contingent upon a successful final inspection and the submission of two complete sets of Operation and Maintenance manuals and product data sheets.
Joliet Job Corps

POSTED

about 5 hours ago

DEADLINE

in 1 day
NAICS: 237310
New
SLED
PLEASURE ISLAND PARKING LOT PAVEMENT IMPROVEMENT PROJECT
Solicitation # P27-002
The City of Port Arthur, Texas, is soliciting bids for the Pleasure Island Parking Lot Pavement Improvement Project, which involves the construction of an asphalt parking lot replacement. The project requires the contractor to provide all necessary labor, materials, equipment, and superintendence to deliver the installation in full operating condition. Key deliverables include the installation of electrical conduits, concrete wheel stops, and the digging and grading of drainage swales, as well as ADA-compliant striping and signage. The work must be completed within 90 calendar days, and the award will be based on the time required for completion and the technical standards of the bid. Bidders must provide a bid guarantee of at least five percent and are required to furnish payment and performance bonds if the contract exceeds 50,000 and 100,000 dollars, respectively. The contract is subject to the Davis-Bacon Act and Executive Order 11246 regarding equal employment opportunity. Additionally, respondents must certify that they do not boycott Israel and are not listed on the Texas Comptroller's website as doing business with Iran, Sudan, or foreign terrorist organizations. A five percent retainage will be held from progress payments until final acceptance of all work. Successful bidders must submit a construction schedule within seven calendar days of notice and a detailed progress schedule and cost breakdown within fifteen days of contract execution.
City of Port Arthur

POSTED

about 12 hours ago

DEADLINE

in 8 days
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 project, a firm fixed price construction contract focused on watershed restoration within the Little Nespelem WMU. The primary objectives are to improve water quality, enhance riparian habitats, promote natural water flow, and reduce the impact of open-road density on wildlife. The scope of work requires the contractor to decommission six road segments totaling 3.29 miles, install two tank traps, and transport all removed non-natural materials, such as culverts and fencing, to a COR-approved disposal facility. All activities must adhere to specific Colville Indian Reservation Tribal Law and Order Codes regarding cultural resources, forest practices, water quality, hydraulic practices, fire management, and industrial safety, as well as 43 CFR 10.4 for inadvertent discoveries. This is an Indian Preference set-aside under the Tribal Employment Rights Ordinance (TERO), requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin. Award will be granted to the lowest, responsive, and responsible bidder who demonstrates technical experience in stream crossings, road cross drainage, and bank stabilization. Bidders must submit a comprehensive packet by October 29, 2026, including a signed bid sheet for the entire project, a detailed work plan with equipment and schedules, TERO certification, a debarment form, and proof of liability insurance of at least 1,000,000 dollars. The Contracting Officer Representative (COR) will oversee material acceptance and work plan approval to ensure compliance with environmental and safety standards.
Confederated Tribes of the Colville Reservation

POSTED

about 12 hours ago

DEADLINE

in 9 days

AI Contract Overview

Show more

This contract involves the repair of a section of Runway 14/32 at Dover AFB, requiring comprehensive labor, materials, and equipment. The scope includes milling a 150-foot wide by 2100-foot long area to a depth of 2 inches, followed by repaving with a specified asphalt mixture in accordance with FAA standards. Additionally, the project entails crack sealing along 4200 linear feet of shoulder areas, grooving the new pavement as per UFGS specifications, and restriping all markings with reflective materials, including arrows and other pavement markings. The project schedule has been adjusted to move the site visit to January 23, 2025, with questions from the visit due by January 29, 2025, and proposals required by February 11, 2025. The contract is managed by the Department of the Air Force at Dover AFB, with key contacts available for inquiries. The solicitation emphasizes timely coordination for base access and adherence to technical standards for pavement repair and marking.

General Info

Contract for runway repairs at Dover Air Force Base due February 14, 2025.

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

Dover AFB, DE, 19902, USA

Set-Aside

NONE

Documents

17

436 CONS FP/AT & OPSEC Awareness Training Requirements

PDF, High priority: read this firstspecifications
High

Amendment 0002 to Solicitation FA449725R0005

PDF, High priority: read this firstamendment
High

Amendment FA449725R00050001 (SF 30)

PDF, High priority: read this first2 pages · amendment
High

Bid Schedule 2024 Repair Runway 14-32 Phase 3

ZIP, High priority: read this first49 pages · bid-schedule
High

Dover AFB Airfield and Heavy-Duty Pavements Specifications

PDF, High priority: read this firstspecifications
High

Evaluation Factors for Award (Best Value)

PDF, High priority: read this firstevaluation-factors
High

FA449725R0005 - FY25 Runway 14/32 Asphalt Repair

PDF, High priority: read this firstrfp
High

FJXT 220010 - FY24 Repair Runway 14-32 Phase 3 (Rev 1)

PDF, High priority: read this firstsow
High

Haul Route - Allan Myers Dover Equipment Shop

PDF, High priority: read this firstspecifications
High

Repair Runway 14/32 Phase 3 Post Site-Visit Q&A V2

PDF, High priority: read this first2 pages · q-and-a
High

Repair Runway 14/32 Phase 3 - Post Site-Visit Questions and Answers

PDF, High priority: read this firstq-and-a
High

Wage Determination DE20240004 (01/05/2024)

PDF, High priority: read this firstwage-determination
High

DAFB Antiterrorism Awareness for Contractors Trifold

PDF, Low priorityother
Low

DAFB Antiterrorism Guide for Contractors (Apr 24)

PDF, Low priorityother
Low

Dover AFB Access Control List Request - FA449725R0005

DOCX, Low priority1 page · other
Low

Dover AFB OPSEC Awareness Guide for Contractors

PDF, Low priorityspecial-notice
Low

Site Visit Sign-in Sheet - Repair Runway 14/32 (FA449725R0005)

PDF, Low prioritysite-visit-log
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Jan 22, 2025 to Feb 11, 2025. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline changed from Feb 11, 2025 to Feb 14, 2025. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA4497 436 Cons Lgc
Contacts2 people available
OfficeDOVER AFB, DE, 19902-5016, USA
Office AddressDOVER AFB, DE, 19902-5016, USA

Full Description

Show more
The purpose of Amendment 02 is for the following: A. Incorporate Questions & Answers from the site visit. B. Incorporate Airfield Paving Specifications A and Haul Route attachments. C. Extend proposals due date from 11 Feb 2025 to 2:00PM EST 14 Feb 2025. POINT OF CONTACTs FOR THIS SOLICITATION ARE: TSgt Joshua Brooks/ Contracting Adm. Phone: 302-677-5232. E-mail: joshua.brooks.14@us.af.mil Omelia Saunders / Contracting Officer / Phone: 302-677-5545 / Email: omelia.saunders.2@us.af.mil ALL OTHER TERMS AND CONDITIONS REMAIN THE SAME The purpose of Amendment 01 is for the following: A. Change site visit from 8 Jan 2025 at 2:00PM to 23 Jan 2025 at 2:00PM. Please provide a completed ACL request (Attached) NLT 15 Jan to allow time for base access request to be approved. B. Questions resulting from site visit must be submitted via email by 1:00 PM EST, 29 January 2025. C. Proposals due no later than 2:00PM EST 11 Feb 2025. The project consists of providing all labor, materials, and equipment necessary to repair a portion of Runway 14/32 pavement (see location below). The project consists of providing all labor, materials, and equipment necessary to repair 2100 LF Runway 14/32. A. Rotor mill an area 150 LF x 2100 LF to a depth of 2 inches. B. Repave 150 LF x 2100 LF with 2 inches PG 76-22 binder FAA Mix in accordance with UFC 3-260-02. Groove new pavement in in accordance with UFGS 32 01 18.71(Grooving of Airfield Paving). C. Crack seal 4200 LF (2100 LF x 2) 25 FT wide shoulder areas D. Restripe all demolished stripes/markings with retroreflective (Type 1 or Type III beads) & white paint. Markings consists of 11 - 120 LF long arrows.

More opportunities from Department Of Defense → FA4497 436 Cons Lgc

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS