Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Repair Storm Damage

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Caltrans District 1 Eureka has issued a forecast for an emergency project titled Repair Storm Damage to address critical infrastructure failures on State Route 299 at Post Mile 13.96 in Humboldt County, California. The project is categorized under NAICS code 237310 and was posted on July 15, 2026. The work is necessitated by heavy winter rains from 2025/2026 that caused saturated soils and erosion, leading to the disconnection of a downdrain from a cross culvert. This failure resulted in the erosion of the bank and slope, as well as the undermining of the fill prism and embankment, which currently threatens the stability of the roadway. The primary objective of the project is to stabilize and restore the damaged slope, drainage, and roadway facilities to protect the public from imminent safety hazards and restore the traveled way. Due to the emergency nature of the repairs, a Notice of Exemption was filed on July 14, 2026, citing public resource codes and California Code of Regulations to expedite the work. Jeffrey Jahn serves as the Environmental Coordinator for the project. Specific contract values, performance periods, and evaluation criteria have not yet been disclosed in the forecast documentation.

General Info

Emergency repair to stabilize slope, restore drainage, and reinforce roadway on State Route 299 after winter rain damage.

Agency

California → Caltrans, District 1 - Eureka

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 1 - Eureka
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 1 - Eureka
Office AddressN/A
Contacts
Jeffrey JahnEnvironmental Coordinator

Full Description

Show more
The emergency project is in Humboldt County along State Route (SR) 299 at Post Mile (PM) 13.96 in Humboldt County. Heavy winter rains during winter 2025/2026 caused damage to the highway facility and drainage system due to saturated soils, erosion and earth movement. The downdrain disconnected from the cross culvert, resulting in erosion of the bank and slope under the downdrain as well as the fill prism undermining the embankment and threatening to undermine the roadway. The purpose of the project is to stabilize and restore damaged slope, drainage, and roadway facilities. The project is needed to restore the traveled way and protect the public from imminent safety hazards.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
ITB # 002-26 Asphalt Road Resurfacing and Milling
Solicitation # PE-62350-NONST-2026-000000015
The City of Fort Oglethorpe is soliciting sealed bids for ITB #002-26, which involves asphalt road resurfacing and milling on various city streets within Fort Oglethorpe, Georgia. The project scope includes traffic control, milling and patching, recycled asphalt concrete leveling, Superpave Type II asphalt, bitumen tack coat, and thermoplastic striping. Work will be performed on specific streets such as Century Station Drive, Outpost Drive, and others, depending on available funding. The project must be completed by June 30, 2027. Bids must be delivered to the City Clerk and Assistant Finance Director by Thursday, December 3, 2026, at 2 p.m. The award will be granted to the lowest responsive and responsible bidder who is a GDOT-approved contractor and adheres to GDOT specifications. A critical requirement is that the awarded company must self-perform at least 70 percent of the work. Bidders must submit a complete package in a specific order, including the Bid Proposal Form, Bid Fee Form, Execution of Bid Form, Exception Sheet, Affidavit of Non-Collusion, Certificate of Insurance, and an E-Verify Compliance Affidavit. Additionally, contractors must provide a Georgia Occupational Tax Certificate and maintain minimum Worker's Compensation and General Liability Insurance. All written inquiries must be submitted by November 20, 2026.
City of Fort Oglethorpe

POSTED

about 2 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground utilities such as tunneling, boring, jacking, and micro tunneling, as well as site work involving land surveying, site clearing, shoring, and subsurface investigation. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix and precast concrete. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. Qualified bidders must possess a valid California Contractor license and provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested firms must be certified by recognized agencies such as the SBA, MBDA, or CUCP prior to the bid opening. The deadline for responses is November 18, 2025, at 2:00 p.m., with invitations and instructions managed through the Building Connected system. Primary contact for this solicitation is Lead Estimator Ken Johnston.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 20 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS