REPAIRS TO AGE MAINTENANCE SHOP, F-938

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac Far EastView Agency

NAICS

N/A

Place of Performance

USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Far East
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Far East
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Scope are the following: (1) Replacement of entire roof and wall panel system, (2) Replacement of entire acoustic ceiling system, (3) Replacement of interior window glass, (4) Replacement of interior single and double doors, (5) Replacement of VCT floor tiles, (6) Replacement of ceramic floor tiles, (7) Replacement of toilet partitions, (8) Replace approx. 20,943-sf sprinkler system, (9). Replace plumbing system and all supported accessories, (10). Replace 4-eautility set exhaust fans, (11) Replace 2-ea roll-up doors, (12). Replace 1-ea ACCU (2.5-tons), 1-ea FCU complete with all required accessories, (13) Installs new Electrical wiring System for new Roof Exhaust Fans, (14) Electrical Wiring System for Utility Set (Industrial Fan Blower), (15) Removed & Replace Existing Obsolete Fire Detection & Alarm System, with new Fire Detection & Alarm System, (16) Install new Electrical wiring System for ACCU & FCU. (17) Replacement of entire wall panel system, (18) Replacement of entire acoustic ceiling system, (19) Replacement of interior window glass, (20) update of labor/materials, (21) replacement of pre-action sprinkler system, (22) plumbing system,(23) Removal and installation of a Double Check Valve Assembly (DCVA) (24) Install 1-ea backflow preventer, size 1-1/2 inch dia. complete with fittings, pipes and all supported accessories. (25) adding off-island disposal cost, and (26) painting works.