Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

REPAIRS TO AIR OPS BLDG, F-301

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac Far EastView Agency

NAICS

N/A

Place of Performance

USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Far East
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Far East
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Scope of work were based on ICAP inspection and Builder Generated Requirements deficiencies of the facility. Project will perform the following; 1] Replace built-up roofing, remove / relocate furniture, repair external stairs and replace ladder at tower booth cubicle, single wooden access door assembly at all various rooms, bathrooms for men and women, storage rooms, double doors at main entrance, back of the building, mechanical room and one for tower entrance, Aluminium glass windows, vinyl tiles, aluminium Safety railing at tower booth cubicle, built up roof, gutter and downspouts, metallic canopy, replace acoustical tiles, re-plaster damaged walls, beams and roof surfaces and painting works on external and internal wall surface; 2] Install new cross main and branch line piping's complete with fittings, pipe support/hanger, brackets and all required accessories for approx. 4620-sf building; 3] Install new men /women toilet with wall mounted flush valve water closet (2-ea), sink (4-ea), lavatory (4-ea), shower (2-ea), complete with all required accessories; 4] Replace 1-ea electric water heater 50-gal;5]Remove 1-each roof exhaust fan located roof top of the building including all supporting accessories located men/ women's head;6] Replace existing electrical system connected to water heater storage tank.