REPAIRS TO FLAMMABLE/ HAZARDOUS STO. BLDG AND TANK HOUSE , F-718

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac Far EastView Agency

NAICS

N/A

Place of Performance

USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Far East
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Far East
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Scope of work will perform the following: For F-718 (1) Replace entire interior/ exterior roof and wall panel including secondary framing, support and accessories; (2) Replace entire exterior/ interior doors including frame and hardware's; (3) Replace entire exterior metal wall mounted louver; (4) Replace entire window glass; (5) Replacement of entire acoustic ceiling system; (6) Replacement of entire VCT floor tiles; (7) Painting of new works; (8) Excavation, backfill and compaction for the electrical trench, (9) replace existing main power supply cables from STA 108 to facility; (10) replace Panelboard "A" including branch circuits and installation of new 60 AT panelboard "B"; (11) Installation of equipment power supply like for roll up doors, exhaust fan, supply fan and horizontal supply fan; (12) replace lighting system; (13) replace obsolete system 3 fire alarm system; and (14) grounding system; (15). Replace/modify approx. 8,000-sf pre-action sprinkler system, (16) Replace plumbing fixtures (4-ea) including pipes/fittings and all required accessories, (17) Replace approximately 8,000-sf galvanized steel exhaust air duct system including duct support / hanger (shall be strut channel), and all required accessories, (18) Install new 4-each 12' x 12' roll-up doors, (19) Install 3-ea new centrifugal in-line exhaust fan, and 1-ea supply fan explosion resistant belt drive motor with backdraft damper, hanging spring isolators, complete with all supported accessories, (20) Install 1-ea new exhaust fan, side wall mounted, (21) Replace 1-ea window type A/C unit. (22) Replace 6-ea new industrial fan blower complete with brace/support and all supported accessories, (23) Repair/ retrofit 6-ea badly corroded column bases include base plate and anchor bolts, (24) Provide shoring plan prior to the repair of structural column bases. For F-727: (25) Replace 1-ea 30A disconnect switch; (26) replace obsolete fire alarm system with addressable alarm system, (27) replace lighting sy